1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

Chapter 13 Transmission Lines
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Introduction to electronics lab ENGRI 1810 Using: Solderless prototype board (white board) Digital multimeter (DMM) Power Supply Signal Generator Oscilloscope.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Grounding and Testing L0 (L1) --- noise studies --- Kazu Hanagaki, Sara Lager, Gustavo Otero Introduction of noise issue What is going on the other side.
1 Sep. 19, 2006Changguo Lu, Princeton University Induced signal in RPC, Configuration of the double gap RPC and Grouping of the strips Changguo Lu Princeton.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
1 June 19, m long strip readout and safe gas mixture C. Lu Princeton University.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
1 Daya Bay collaboration meeting, IHEP, Beijing, Aug. 1-3, 2007 Test OPERA gas mixture on IHEP RPC w/ 8m long strip C. Lu Princeton University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
ITOP carrier amplifier test at Indiana University G. Visser 4/27/2015 (latest update) I use the recently (here) characterized JT0947 ch3 as input source.
Semiconductor detectors
PROFIBUS wiring/installation can be done with:
09/16/2010© 2010 NTUST Today Course overview and information.
Electromagnetic shielding of the SQUID in the nEDM Experiment: Bolts and Nuts Andrei Matlashov, Michelle Espy, LANL, P What happens when SQUID is.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
Current & Circuits February ‘08
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
ECE 342 – Jose Schutt-Aine 1 ECE 342 Solid-State Devices & Circuits 18. Operational Amplifiers Jose E. Schutt-Aine Electrical & Computer Engineering University.
Transmission Lines No. 1  Seattle Pacific University Transmission Lines Kevin Bolding Electrical Engineering Seattle Pacific University.
Bits (0s and 1s) need to be transmitted from one host to another. Each bit is placed on the cable as an electrical signal or pulse. On copper cable the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
CMS Calorimeter HB- HB+ HE- HE+ HF- HF+ HO-2 HO-1 HO0 HO+1 HO+2
Design of a readout system for RPCs Olu Amoda2 The LODEN Group The group is an association of Fermilab scientists who teamed up to build a cosmic ray.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
1 Muon Veto System and Expected Backgrounds at Dayabay Hongshan (Kevin) Zhang, BNL DayaBay Collaboration DNP08, Oakland.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
The requirements of Ideal pulse-type counter :  1 Every particle entering the detector should produce a pulse at the exit of the counter,
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
Small, fast, low-pressure gas detector E. Norbeck, J. E. Olson, and Y. Onel University of Iowa For DNP04 at Chicago October 2004.
The Working Theory of an RC Coupled Amplifier in Electronics.
Basics of Bypass Capacitor, Its Functions and Applications.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
A systematic study of cross-talk limitations in RPC timing
RPC with strip readout Last results from test of timing glass
Setup for Cosmic Ray Test of VPA panel, using MiniDAQ
Chamber Design and Integration RE3/1 and RE4/1
News on second coordinate readout
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC Front End Electronics
Presentation transcript:

1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)

Compare TYPEIM_R_IIM_R_IIIM_H_IIM_H_IIIM_RH_IIM_RH_II Cross talk? Thickness (mm) Matching Assemble Ground IM_R_I Maybe the best choice Least materials, thinness, compact, less cross talk, should be tested Module Design of RPC Yu guang Xie, 10 July, 2007 Shielding box, grounded.

3Daya Bay RPC HV FDR 6/17/2008 Signal propagation on graphite coating Because of the large surface resistance the pickup noise from HV cable via graphite coating is negligible. Consider two surfaces of RPC graphite coating as a transmission line, 1cm wide transmission line, dR=2  dx/L 0, dC=  L 0 dx/g, dL=  0 gdx/L 0, Signal propagation constant  :  =((R+i  L)i  C) 1/2. Signal V(x) at x: V(x)e i  t =V(0)e -  x+i  t. Assume  =1M  /, g=0.006m, L 0 =1cm, and  =8.85x F/m,  =4  x H/m,  =2  x10 8 Hz, the real part of e -  x at 3.6cm would drop to 3%,  the signal attenuation length is very short, the graphite contribution to the noise pickup is negligible. A parallel plate transmission line model: (m)

4Daya Bay RPC HV FDR 6/17/2008 Noise pickup on the strips The arrangement of the IHEP RPC readout strips and HV tape on the graphite surface can have following two configurations: (1) The strip covers up to the edge of the RPC, there will be a direct coupling between strip #0 and HV tape (only a Mylar film for DC insulation); (2) Cut off small section of the strip, no direct coupling between strip #0 and HV tape. (1) (2) Cut off this small section of the strip HV copper tape on the graphite film

Test arrangement Top shielding Bottom shielding RPC chamber Read out strip Read out ground HV copper tape Read out strip Black graphite coating, covered by a Mylar film

6Daya Bay RPC HV FDR 6/17/2008 Test result for configuration (1) 200mV input pulse on HV tape, reflection at the unterminated end of the cable can be clearly seen. Strip #0 pick-up Strip #1 pick-up Strip #-1 pick-up Input signal on HV tape The pick-up noise is ~5% of the source noise on HV cable (the negative pulse is ~-20mV).

7Daya Bay RPC HV FDR 6/17/2008 Test result for configuration (2) Strip #0 pick-up Strip #1 pick-up Strip #-1 pick-up Input signal on HV tape The pick-up noise is ~1% of the source noise on HV cable.

8Daya Bay RPC HV FDR 6/17/2008 Induced signal on HV tape As Jon suggested I also tested the induced signal on the HV tape when connect the pulse signal to strip #0: Source pulse on strip #0, 50mv/div Induced signal on HV tape, 10mv/div The induced signal on strip #0 is ~10mV, the source signal on HV tape is ~ 130mV, the ratio is ~ 8%. This pick-up signal will distribute to all other HV tapes on same branch of HV distribution system, then picked up by #0 strips on other RPCs. The overall pick-up signal on other RPCs is only 5%*8%=0.4%. Completely negligible!

9Daya Bay RPC HV FDR 6/17/2008 For the muon right punching through the HV tape For the very small chance of the muon punching through the HV tape (~1cm 2 out of 2m 2 ), the induced signal on the HV tape will reach other RPC HV tapes that are on the same HV branch. In this case ~5% of this induced signal will be generated on the relevant strips. These signals will be too small to be concerned.

10Daya Bay RPC HV FDR 6/17/2008 Pick-up noise when HV cables are connected RPC strip ground Single lead LEMO cable >10m long cable The room is using fluorescent light. The following two slides show the pick-up noise on strip #0 for two grounding schemes: (1)two ends grounded separately; (2)only HV supply (Bertan power supply) side is grounded (through AC power plug). There is no difference between them.

11Daya Bay RPC HV FDR 6/17/2008 Ground two ends separately Strip #0 pick-up Strip #1 pick-up Strip #-1 pick-up

12Daya Bay RPC HV FDR 6/17/2008 Ground at HV supply side only Strip #0 pick-up Strip #1 pick-up Strip #-1 pick-up

13Daya Bay RPC HV FDR 6/17/2008 Conclusion The preliminary test results show: The readout strip direct above the HV contact tape will pick-up ~5% of the noise on the HV cable, if cut off small end section of this strip to avoid the direct pick-up, this number can drop to 1%; The HV cable ground scheme (single end ground or both ends are separately grounded) won’t introduce large noise (compared to streamer signal) to the readout strip, thus for streamer RPC this is not critical.

14Daya Bay RPC HV FDR 6/17/2008 Real noise pulse on HV cable 20mv/div, 20ns/div R2(Hz)R3(Hz)R1(Hz) (strip#8) Rate Vth=30mV

15Daya Bay RPC HV FDR 6/17/2008 Isolate sub-branches from each other Kirk suggested to add a resistor into each sub-branch, such as 10k , to isolate the sub-branches from each other, we may can eliminate this cross talk. My test shows it works! Put the resistor here 20mv/div 2mv/div

16Daya Bay RPC HV FDR 6/17/2008 Comments The source of the pulse on HV cable is not completely studied yet. At least it tells us the HV power supply output line is not virtual zero impedance. Part of these pulses might be due to (1) The streamer developed at the HV copper tape area, (2) The discharge between HV copper tape and strip, (3) Streamer current drawn from HV supply, (4) Pick up RF noise (but the shape looks not likely). (5) etc. Further study is needed.

17Daya Bay RPC HV FDR 6/17/2008 Coincidence pulse We would like to see the noise on the working RPCs. Use two 50 x 50 cm 2 prototype RPCs in this study. Two RPCs are connected to same HV channel, one RPC is directly connected to HV, the other RPC is through a capacitor. For the later one although the DC HV is isolated, the AC pulse still can propagate to this RPC from anywhere in HV line.

18Daya Bay RPC HV FDR 6/17/2008 Test arrangement Co-60 source RPC #2 RPC #1 Readout strip Readout ground There is no additional shielding for the test RPCs, outside noise source may enter the readout transmission line.

Noise pulse S2 S1 S1 strip #S2 strip #S1 rate (Hz)S2 rate (Hz) S1  S2 rate (Hz) Rate(Hz) Not accidental coincidence Co-60

20Daya Bay RPC HV FDR 6/17/2008 Coincident pulse (S2 strip #6, S1 strip #8) 400ns/div S2 S1 coincidence

21Daya Bay RPC HV FDR 6/17/2008 Coincident signals (S2 strip #8, S1 strip #8) 400ns/div S2 S1 coincidence

22Daya Bay RPC HV FDR 6/17/2008 Coincident signals (S2 strip #7, S1 strip #7) S2 S1 coincidence 80ns/div

23Daya Bay RPC HV FDR 6/17/2008 Coincident signals (S2 strip #7, S1 strip #8) 400ns/div S2 S1 coincidence

24Daya Bay RPC HV FDR 6/17/2008 Coincident signals (S2 strip #3+2, S1 strip #8) 400ns/div S2 S1 coincidence

25Daya Bay RPC HV FDR 6/17/2008 Comments The source of the coincident events between two RPCs (placed side by side, one is connected to HV, the other is AC coupling to HV line, but DC isolated) could be (1)Common RF noise source; (2)Huge RPC #1 signal induces noise pulse on RPC #2 strip. Compared to strip signal rate (>1kHz) the coincidence rate (~0.1Hz) is very low. Add additional shielding surrounding the test chambers might be able to remove most of these coincident events.

26Daya Bay RPC HV FDR 6/17/2008 Where does the signal on HV cable come from? Triggered on ch1, record both ch1 and ch2. Co-60 is on the location of strip #1, ch2 records strip #8, #7 and #6 separately.

Scope signals Ch2: stp#8 200mv/div Ch1: HV cable 50mv/div Ch2: stp#7 200mv/div Ch2: stp#6 200mv/div Ch1: HV cable 50mv/div It is clear that when triggered by the pulse on HV cable, the rate of the coincident pulse on strip strongly depends on the strip position: the highest is strip #8, which is overlap the HV copper tape, then strip #7. Strip #6 almost sees nothing.

Scope signals (cont’d) Ratio = 24/408 = 5.9%Ratio = 26/322 = 8%Ratio = 35/618 = 5.6% The coupling ratio between HV cable and strip signal is ~ 5.6 – 8% (consistent with previous observation – slide #8). Now we can identify the source of these pulses on HV cable: they come from the coupling between HV copper tape and strips. If the streamer signal on strip very big, >600mv, the pickup signal on HV cable can be >30mv.

29Daya Bay RPC HV FDR 6/17/2008 Scope signals (cont’d) Although the signal on HV cable can be large enough to cross 30mv threshold, in order to be able to produce a fake signal, they must be picked up by the strip on other RPC. This is another fact of 20 reduction (5%) as we mentioned on slide #6. Overall reduction is 0.4% (slide #8). It means that the original strip signal needs >7.5v, the pickup signal on other strip might be >30mv, that chance is very rare. So we may not need to worry about this problem.