MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
MICE SciFi-tracker prototype MICE experiment Tracker: alternative technologies SciFi tracker Single-station prototype – mechanical status Single-station.
1 Sci Fi Simulation and Reconstruction Status M.Ellis/C.Rogers Wednesday 31 st March 2004.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Julia Sedgbeer Mice Collaboration Meeting, June SciFi Tracker – SW Status & Plans General SW status Simulation & Reconstruction Performance Studies.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
Software parallel session summary MICE collaboration meeting INFN, Frascati 27/6-05.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
1 Recon tests, Sci Fi status and Sci Fi design iteration Malcolm Ellis MICE Software Phone Meeting Wednesday 28 th April 2004.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
MICE Phase 1 Koji Yoshimura KEK June
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE CMPB Alain Blondel 1 Highlights on MICE.
1 MICE Software Phone Conference Introduction 27 th July 2005 M. Ellis.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Prototype activities update
Tracker Software Status
Tagger Microscope Detector & Electronics Status
Efficiency Study of Prototype Scintillator for INGRID
Nov. 10th, Meeting INGRID T. Nakaya (Kyoto)
Presentation transcript:

MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated RF on VLPCs … OK Light yield, cross talk etc. to come Updated costing G4MICE: Progress on debugging new G4MICE

Stations: mechanical Prototype: All three stations shipped to FNAL

Lightguides All lightguides shipped to FNAL

Implementation at FNAL: D0 test stand: Trigger etc. ready, assembly in progress RF test done: effect at FULL power ~ 0.5 ADC count increase in width of pedestal i.e. an effect of less than 0.05 pe (i.e. OK for MICE)

Assembly:

Cost and schedule Updated cost and schedule in preparation: Mechanical: revised costing ~prepared. Shows saving and is based on experience with prototype A. Bross (FNAL) updating electronics costing: ‘Borrow’ D0 spares? Implies negotiation with D0 … Build new VLPC cassettes … cost being evaluated Schedule: Mechanical: revised following experience with prototype Electronics: being revised by A. Bross (D0 experience)

Software Present focus: Gridification: Done: Rapid generation of large data sets RF background generator: under test SciFi simulation: updated: under test SciFi reconstruction: updated: under test Schedule to provide results for collaboration meeting is tight … but probably will be met

Summary: Tight … but … still possible!