Chapter 18 Synchronous Manufacturing and the Theory of Constraints

Slides:



Advertisements
Similar presentations
THEORY OF CONSTRAINTS & DRUM – BUFFER - ROPE
Advertisements

Constraint Management
Optimized Production Technology (OPT)
© 2007 Pearson Education Constraint Management Chapter 7.
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
1 Session 17 Theory of Constraint (TOC) Scheduling Theory of Constraint (TOC) Principles Determining Bottleneck Operations Information Flow in TOC Scheduling.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Theory of Constraints Part II: TOC Concepts
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
1 Presentation by: Tim Sullivan CIRAS (Center for Industrial Research and Service) Iowa State University Extension.
Systems Thinking and the Theory of Constraints Any intelligent fool can make things bigger, more complex, and more violent. It takes a touch of genius.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Practice; Follow the 5 Steps Process Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Managing Process Flows
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
8/27/04 Cut the Lot Size What can we do if the bottleneck has moved outside the plant?
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: –what levels should be maintained.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Introduction to Theory of Constraints Competitive Manufacturing Management.
Ricardo Ernst Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 6: Theory of Constraints.
Dependent Events and Statistical Fluctuations
THEORY OF CONSTRAINTS (TOC) BY AMAR P. NARKHEDE. INTRODUCTION The theory of constraints is an overall management philosophy that aims at continually achieving.
OPSM 501: Operations Management Week 6: The Goal Koç University Graduate School of Business MBA Program Zeynep Aksin
Operations and Production Management
Introduction to Theory of Constraints
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
 Copyright, Ansari, Bell, Klammer and Lawrence, Management Accounting: A Strategic Focus, Irwin-McGraw-Hill, THE THEORY OF CONSTRAINTS AND THROUGHPUT.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
The Theory of Constraints
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
1 Theory of Constraints Short-term Capacity Optimization.
Performance Measurement Financial
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE. Traditional Approach: Divide and Conquer Division of Labor breaks down linkages complex systems into.
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE. Traditional Approach: Divide and Conquer Division of Labor breaks down linkages complex systems into.
The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
Module 10: Theory of Constraints Operations Management as a Competitive Weapon.
Georgijs Buklovskis Member of the Board Association for Business Efficiency, Latvia Plant manager Brabantia Latvia Ltd. BMDA conference, Rīga, May, 8th,
Constraint Management Chapter 7 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
MEL751: Module on Theory of Constraints
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
MODULE 3 Manufacturing Methodologies
Synchronous Manufacturing and Theory of Constraints
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Introduction to Theory of Constraints
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: what levels should be maintained when.
The Theory of Constraints
Synchronous Manufacturing
Constraint Management
The Goal.
Outline Introduction to Constraints
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
SE503 Advanced Project Management
Goldratt's Theory of Constraints (TOC)
Drum –Buffer-Rope Based on : R. Holt, Ph.D., PE.
Theory of Constraints Part II: TOC Concepts
Theory of Constraint.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Chapter 18 Synchronous Manufacturing and the Theory of Constraints Goldratt’s Rules Goldratt’s Goal of the Firm Performance Measurement 2

Goldratt’s Rules of Production Scheduling Do not balance capacity balance the flow. The level utilization of a nonbottleneck resource is not determined by its own potential but by some other constraint in the system. Utilization and activation of a resource are not the same. An hour lost at a bottleneck is an hour lost for the entire system. An hour saved at a nonbottleneck is a mirage. 5

Goldratt’s Rules of Production Scheduling (Continued) Bottlenecks govern both throughput and inventory in the system. Transfer batch may not and many times should not be equal to the process batch. A process batch should be variable both along its route and in time. Priorities can be set only by examining the system’s constraints. Lead time is a derivative of the schedule. 5

Goldratt’s Theory of Constraints (TOC) Identify the system constraints. Decide how to exploit the system constraints. Subordinate everything else to that decision. Elevate the system constraints. If, in the previous steps, the constraints have been broken, go back to Step 1, but do not let inertia become the system constraint. 5

Goldratt’s Goal of the Firm The goal of a firm is to make money. 4

Performance Measurement: Financial Net profit Return on investment Cash flow 5

Performance Measurement: Operational 1. Throughput 2. Inventory 3. Operating expenses 6

Productivity Does not guarantee profitability Has throughput increased? Has inventory decreased? Have operational expenses decreased? 7

Unbalanced Capacity In earlier chapters, we discussed balancing assembly lines. Synchronous manufacturing views constant workstation capacity as a bad decision. 8

The Statistics of Dependent Events Process Time (A) Process Time (B) Rather than balancing capacities, the flow of product through the system should be balanced. 9

Capacity Related Terminology Capacity is the available time for production. Bottleneck is what happens if capacity is less than demand placed on resource. Nonbottleneck is what happens when capacity is greater than demand placed on resource. Capacity-constrained resource (CCR) is a resource where the capacity is close to demand placed on the resource. 10

Time Components of Production Cycle Setup time is the time that a part spends waiting for a resource to be set up to work on this same part. Process time is the time that the part is being processed. Queue time is the time that a part waits for a resource while the resource is busy with something else. 15

Time Components of Production Cycle (Continued) Wait time is the time that a part waits not for a resource but for another part so that they can be assembled together. Idle time is the unused time. It represents the cycle time less the sum of the setup time, processing time, queue time, and wait time. 16

Drum, Buffer, Rope A B C D E F Bottleneck (Drum) Market Inventory Exhibit 17.9 Drum, Buffer, Rope A B C D E F Bottleneck (Drum) Inventory buffer (time buffer) Communication (rope) Market 18

Quality Implications More tolerant than JIT systems Except for the bottleneck 19