Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

EXTRACTION BEAM LOSS AT 1 TEV CM WITH TDR PARAMETERS Y. Nosochkov, G. White August 25, 2014.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
Beam Loss in the Extraction Line for 2 mrad Crossing Angle A.Drozhdin, N.Mokhov, X.Yang.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
IPBI 6 April 05Ken Moffeit Polarimetry Design Updates - Dispersion in upstream chicane - 20mrad extraction line 0.75 mrad beam stay clear location of Synchrotron.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC.
ALPHA Storage Ring Indiana University Xiaoying Pang.
The Detector and Interaction Region for a Photon Collider at TESLA
Brain Gestorme: Status of the LHeC Ring-Ring / Linac- Ring Basic Parameters I appologise to talk about things you already know...
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
Overview of Extraction Line Designs and Issues
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle HH-Zeuthen-LC-Meeting Zeuthen September.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle LCWS 2004 Paris April 19 th 2004.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Oct. 6, Summary of the Polarisation Session J. Clarke, G. Moortgat-Pick, S. Riemann 10 November 2006, ECFA Workshop, Valencia.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
L. Keller 3/18/02 Beam-Gas-Bremsstrahlung and Coulomb Scattering in the NLC Beam Delivery System Conditions for Calculation: 1. Program is DECAY TURTLE.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
LCWS Paris – April 19-23, 2004 Polarimeter Issues K. Peter Schüler Polarimeter Issues 1 Polarimeter Studies for TESLA O General Considerations O.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
1 Updated comparison of feedback implementation for e + e - and e - e - modes of operation with realistic errors in the BDS M. Alabau Pons, P. Bambade,
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
FCC-ee Interaction Region design
Update of the SR studies for the FCCee Interaction Region
M. Sullivan International Review Committee November 12-13, 2007
LHeC interaction region
The Interaction Region
Final Focus Synchrotron Radiation
The small crossing angle layout - where are we and what do we do now?
AD & I : BDS Lattice Design Changes
ILC BDS Emittance Diagnostics: Design and Requirements
The PEP-II Interaction e+e- Factories Workshop
The 2mrad horizontal crossing angle IR layout for the ILC
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
MEBT1&2 design study for C-ADS
IR Lattice with Detector Solenoid
ILC Beam Switchyard: Issues and Plans
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree crossing angle a la the TESLA TDR. Problems with the TDR: 1.Dipole, thin copper septum absorbed several kW of beamstrahlung radiation under some steering conditions. Proposed solution: Extract in the horizontal plane to get the dipole septum completely outside the beamstrahlung cone. 2.Too much beam loss on a synchrotron radiation mask between the separators. Proposed solution: Move the mask closer to the IP and the separator further from the IP, add another mask inboard from the separator for the outgoing synchrotron radiation. 3.Large electric field (≈100 kV/cm) needed for 1 TeV CM probably not realistic. Proposed solution: Reduce the maximum electric field to 50 kV/cm at 1 TeV CM ( GeV CM). L. Keller Aug. 2005

Plan View of Zero Degree Extraction from IP to Charged Beam Dump

Plan View of Zero Degree Extraction Showing Beamstrahlung Collimation sep PC B1 B2 QF3 septum QD2A QD2B 5 mr dipole septum γ dump

sep PC B1B2 QD2A QF3 QD2B Elevation View of Zero Degree Extraction Showing Beamstrahlung Collimation Beamstr. Dump

Cross Section of the PEPII/BaBar IR Septum Quad QF3 modeled after this design Incoming beam Outgoing beam, core is 4 cm from the septum (units cm) B ≈ 0

LEP and SPS Electrostatic Separator Experience* 1.At an operating field of 30 kV/cm the breakdown rate was <0.01/hr for 3 ma, 100 GeV beams. With no beam, the breakdown rate at 50 kV/cm was ~0.2/hr. In SPS, the breakdown rate was 10/hr at 110 kV/cm. 2.The separators operated successfully in a “high” flux of synchrotron radiation which drew several hundred µamp from the high voltage power supply. Estimated /sec unmasked synchrotron photons w/ critical energy 70 KeV hit the plates. 3.LEP operated for many years with 40, four meter long separator modules. 4.The required pressure is less than mbar, LEP had mbar or better. 5.CERN has experience supporting the separator plates in the orientation required for bending in the horizontal plane. * CERN SL-Note MS and private communication with Brennan Goddard, CERN

Separator Issues a)Need a 10 cm gap between plates to keep dispersed beam from hitting the plates on the low energy side. Offset the separator toward the low energy side. b) Need pressure ≈ 1 nT in the separator, ideally ≈ 0.1 nT. c)Does scattered synchrotron radiation from the upbeam mask cause breakdown? d)Do radiative bhabha’s hitting the plates cause breakdown? e)At 1 TEV CM, to keep the electric field and maximum voltage within the bounds of CERN experience, the total separator length must increase from 20 to 25 m; and a collimator must be inserted approximately halfway through the separator module chain to keep low energy disrupted beam tail from hitting the plates directly. What is the effect of this collimator?

End View of a LEP 4 m Electrostatic Separator Tank

Analysis Steps Charged Beam: Given: existing FF optics, look at possible modifications later. 1.Use GUINEA-PIG disrupted beam rays for head-on and worst-case vertical offset for two CM energies and two parameter sets including radiative bhabha’s. 2.Input the rays to TURTLE and track the beam to the charged dump. 3.Record hits on collimators. Beamstrahlung: Use the GUINEA-PIG photon trajectories for the same conditions as above and track each photon until it hits an aperture in the system or reaches the beamstrahlung dump.

Collimators in the Zero Degree Extraction Line

Magnets – 500 GeV CM = incoming and outgoing beams = outgoing beam only = incoming beam only

Power Lost on Beam Line Elements in Zero Degree Extraction Line (Units Kilowatts) 500 GeV CM, “Nominal” Parameter Set* *Twenty meter long separator chain begins 15 m from the IP

Changes for 1 TeV CM 1. Longer final doublet – separator moves 2 m further from the IP. 2.Longer separator to keep the same gap (10 cm) and stay within reasonable maximum voltage (250 kV) – leads to an intermediate collimator halfway along the separator chain.

Power Lost on Beam Line Elements in Zero Degree Extraction Line (Units Kilowatts) 1 TeV CM, “Nominal” Parameter Set* *Twenty-five meter long separator chain begins 17 m from the IP

Machine Protection, Fault Examples Separator breakdown during the bunch train: (dipole remains on) Outgoing bunches: 0.5 mrad bend becomes 0.25 mrad bend. Bunches hit QF3 low-Z septum collimator. Incoming bunches: 0 mrad bend becomes 0.25 mrad bend. Bunches pass cleanly through the IP region and hit AB7, 450 m from the IP. The low-Z protection collimators which intercept these errant bunches have to survive ≈ 30 bunches before the machine protection system takes the beam to the linac dump.

Next Steps if this is to Become a Viable Alternative to the 2 mrad Baseline Configuration Need more collaborators to: 1. Design higher order optics to limit beam losses beyond the 5 mrad dipole. 2. Design optics for the energy spectrometer and Compton polarimeter (can the spot be made small enough at the laser IP)? 3. Modify the FF optics to create space within the dipole string for protection collimators at QD2A and QF3 at 500 GeV and 1TeV CM. 4. Look at the optimum position of QD2A to minimize the separator bend angle (already started by Andrei => the bend can be reduced by more than 20%, i.e TeV CM => 40 kV/cm). 5. Design the septum quadrupole QF3 and the 5 mrad septum dipole. 6. Simulate radiative bhabha’s hitting the separator plates. Preliminary indications are that these contribute less than one microamp of separator current at 500 GeV CM. 7. Simulate the scattered synchrotron radiation from the mask which protects the separator and estimate the photon flux hitting the separator plates. 8. Continue beam loss simulations with all parameter sets.

Conclusions: To show that head-on collisions are a viable option, a level of effort comparable to that expended on the 2 mrad crossing angle must be started soon if this option could be considered as part of the baseline configuration by the end of At 500 GeV CM, “nominal” parameter set: The separator requirements are well within the LEP experience. The charged beam and beamstrahlung losses appear tolerable pending design of the full extraction line Required pressure less than mbar, LEP had mbar or better. Simulations of scattered synchrotron radiation and radiative bhabha’s need to be finished. It has yet to be shown that energy and polarization measurements in the extraction line are possible. At 500 GeV CM, “high lum” parameter set: (show stopper)? Have to open the separator gap to 20 cm to avoid intolerable losses on the plates. In principle this is OK, but there are also several hundred kW of disrupted beam lost on the energy slit at QD2A.

At 1 TeV CM, “nominal” parameter set: The charged beam and beamstrahlung losses appear tolerable pending design of the full extraction line. The LEP group has tested separators at the required field of 50 kV/cm, but has little experience with long term operation in the accelerator environment. The separator needs to be lengthened from 20 to 25 m, and a new collimator introduced. The effect of this collimator on the breakdown rate must be understood. Conclusions (cont.) :