Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the.

Slides:



Advertisements
Similar presentations
Microwave Instability : Importance of impedance model
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
1 NEG films: recent R&D progress Paolo Chiggiato (for the EST-SM-DA section) Vacuum Issues of the LHCb Vertex Detector 28 November NEG films: choice.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Manufacturing Processes  Rotational Moulding  Compression Moulding  Turning  Blow Moulding  Die Casting  Injection Moulding  Forging  Vacuum Forming.
AS Materials & Processes Design Section - Camera.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Vacuum and mechanical design of ILC DR O. B. Malyshev ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK Low Emittance Ring Workshop
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
Scientific support Scientific laboratories have the qualified specialists in fields of accelerator physics and technique. They calculate and model the.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Cornell ERL Vacuum System as a Model for ILC Damping Vacuum System Conceptual Design Yulin Li & Joe Conway C ornell L aboratory for A ccelerator-based.
KOPEX SCREENFORCE SYSTEMS. Applications: 1. Nuclear power plants and installations. 2. Military applications, naval frigate refurbishment. 3. Military.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
JUAS Vacuum Technology – Paolo Chiggiato & Roberto Kersevan
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
Facility to coat the SPS magnets with carbon Objective: coat at least 90% of the SPS with a carbon thin film with low secondary electron emission in order.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
ELENA installation progress F. Butin / ELENA collaboration.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
5-7/11/2007 DR KOM ILC2007,CI, Daresbury, UK Vacuum Design Oleg B. Malyshev ASTeC Daresbury Laboratory.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
First ideas on particle free installation of BESSY VSR
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
Vacuum Problems in the ILC Damping Ring
International Linear Collider R&D on electron cloud (SLAC)
R. Kersevan, TE/VSC-VSM – CERN, Geneva
General remarks about the HESR and PANDA vacuum system
Low Emittance Rings 2014 Workshop
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
CEPC Vacuum System Dong Haiyi 2017/11/5.
FCC-ee: coupling impedances and collective effects
Disabling Rules.
Stainless Steel Water Well Casing.
Challenges for FCC-ee MDI mechanical design
SuperB RF and Other Components
Accelerator R&D Results from the B-factory
Electron Clouds at SLAC
Vacuum status at KEKB Junji Haba.
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the requirements for ultra high-vacuum equipment. 80 compensators, 70 absorbers, 100 contacts were successfully installed to the BESSY-II ring in 1997 and have ensured vacuum better than Pa. SR crotch absorber Compensator RF tapers and contacts

Vacuum chambers for LHC injection transfer line Vacuum Equipment Dipole magnet vacuum chamber Quadrupole magnet vacuum chamber from stainless steel

Vacuum Equipment 4 m long copper absorber 4.5 m long copper vacuum chamber for KEK-B from copper

Vacuum Equipment by extrusion from aluminium alloy coated by NEG

Vacuum Equipment