Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Designing for Nonmotorists: Highway and Street Facilities Designing for All.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Louisiana Safe Routes To School Program
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Transportation Annual In-Service Training.
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
Safety at Signalized Intersections. Signalized Intersections FHWA Safety Focus Areas 2.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Designing for Nonmotorists Policy, Planning, Programs, and Provisions for.
Traffic Signs The general principle of traffic signs is to make a message known quickly, (70mph) accurately, with minimum reading skills required. This.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Lane Width Reallocations Based on 5-Year Crash Data Richard C. Moeur, PE ADOT Traffic Design March 2007 edition.
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Florida Department of Transportation, November 2009
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Fundamental Methods for Building More Walkable Communities Mark Fenton Pedestrian and Bicycle Information Center University of North Carolina.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Module 13: Highway-Rail Grade Crossings (HRGC)
1 Bicycle and Pedestrian Planning and Design U.S. Department of Transportation Federal Highway Administration FHWA Course on Bicycle and Pedestrian Transportation.
Designing Streets for Pedestrian Safety - Introduction 1-1 Designing Roads for Multimodal Safety & Access.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
1 Section III Day 2 DMV Manual p. 5-6, Write a scenario about how the driver of the white truck managed to keep his truck on the edge of the.
Rules and Regulations for Safe Driving
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
2010 Wisconsin Safe Routes to School Funding SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
Vegetation Control For Safety Russ Johnson – Maintenance Supervisor - WSDOT Don Petersen – Safety/Design Engineer - FHWA.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Greenways and Shared-Use Paths Lesson 19 Publication No. FHWA-HRT
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
Introduction to Complete Streets in Wisconsin 1. What are Complete Streets?What are Complete Streets? 2 Complete Streets are safe, comfortable, and convenient.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Rural Transportation Planning Eunice Fitzpatrick Transportation Planner Kentucky River ADD Hazard, KY.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
5/8/02FHWA Office of Safety1 FHWA Safety Core Business Unit Office-Level Structure Develops and manages programs for the safe operation of roadways, bicycle.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Complete Streets Training
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Active Transportation Program California Transportation Commission Mitch Weiss 01/14/141.
2016 Active Transportation Plan Goals, Objectives & Criteria Bicycle and Pedestrian Facilities Advisory Committee March 2, 2016 meeting.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Complete Streets Training Module 4b – Designing for All Users.
Draft Transportation Element September 6, 2017
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Emily Guenther Zach Olson Laura Scott Cameron Wein
HERO UNIT Training Module
Federal-aid Highway Program
Presentation transcript:

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Designing for Nonmotorists: Highway and Street Facilities Designing for All Users Christopher Douwes, Trails and Enhancements Program Manager, Federal Highway Administration CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Designing for Nonmotorists Course Overview Part 2: Highway and Street Facilities Complete Streets Road Diets Bicycle Facilities Pedestrian Facilities: Go to the Accessible Design course. Bridges CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 2

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 What’s Wrong with these Pictures? From Bus to the Airport Transit Access CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 3

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Complete Streets What are complete streets? Complete streets are designed and operated to enable safe access for all users. Pedestrians, bicyclists, motorists, and transit riders of all ages and abilities may move safely along and across a complete street. Complete Streets Policy: Transportation agencies routinely design and operate the entire right of way to enable safe access for all users. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 4

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Complete Streets The primary goal of a transportation system is to safely and efficiently move people and goods. Walking and bicycling are efficient transportation modes for most short trips. Walking and bicycling provide transportation for children, elderly, people who cannot drive, and people who choose not to drive. 124 jurisdictions have adopted policies or have made a written commitment to do so. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 5

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Complete Streets Improve safety. Offer transportation choice. Promote “livable” communities. Allow transportation connectivity. Reduce short distance motor vehicle trips: –Save fuel; –Reduce emissions; –Free up highway capacity for long distance trips. Can reduce overall transportation cost. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 6

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Is this a Complete Street? From Perils for Pedestrians: Reprinted with permission of the artist. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 7

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Is this a Complete Street? Charlotte NC, from CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 8

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Complete Streets We don’t need new standards. The AASHTO Green Book already allows designs consistent with Complete Streets. Complete Streets are consistent with Context Sensitive Solutions. See Flexibility in Highway Design. Consider all the users. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 9

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Complete Streets: Connectivity More direct routes for pedestrians, bicyclists, and transit. Shorter travel distances. Reduced vehicle miles of travel. Reduced traffic congestion on arterials and collectors. Greater emergency vehicle access; reduced response times. Easier maintenance. Improved utility connections; more efficient trash pick up. Virginia Secondary Street Acceptance Requirements: CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 10

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Complete Streets: Connectivity From Virginia DOT Secondary Street Acceptance Requirements Cul-de-sac pattern Interconnected pattern CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 11 With connections, trips would not need to use the highway. Any local trip requires drivers to use the major highway to get to their destinations.

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Complete Streets: Connectivity From Virginia DOT Secondary Street Acceptance Requirements Cul-de-sac pattern What can be connected? Interconnected pattern Connectivity Index CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 12

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diets Concept: Reduce lanes to improve traffic flow. Concept: Design from right-of-way line toward the center, not from the centerline out. FHWA Evaluation: Evaluation of Lane Reduction "Road Diet" Measures and Their Effects on Crashes and Injuries, FHWA-HRT : of Lane Reduction "Road Diet" Measures and Their Effects on Crashes and Injuries Examples from FHWA Bicycle Design Course: CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 13

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet Street and location criteria: –Moderate volumes (8,000–15,000 ADT). –Roads with safety issues. –Main streets; commercial reinvestment areas. –Economic enterprise zones. –Entertainment districts. –Historic streets, scenic roads. –Transit corridors. –Popular or essential bicycle routes or links. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 14

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet Convert 4-lane undivided to 3-lane. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 15

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet From FHWA’s A Resident's Guide for Creating Safe and Walkable Communities, Resource Sheet 7: Engineering Solutions to Improve Pedestrian Safety Before After CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 16

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet Examples from National Complete Streets Coalition: CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 17

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet Examples from National Complete Streets Coalition: CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 18

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet Examples from National Complete Streets Coalition: Examples CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 19

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet On-Street Parking: Reduce Lane Width. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 20

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Road Diet? We will have to work in stages to get the recreational motorists off the road. Initially, we may have to provide separated areas for them to drive. Something like this: CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 21 A recent recreation survey for North Carolina found that nearly 60% of the State’s population drives for pleasure... I envision a letter to the editor: “Get those [recreational] motorists off the road! I’m trying to bike to work and they are hogging the road just driving around for fun!”

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 On-Road Bicycle Facilities What are the Standards? National Highway System: Use AASHTO. –AASHTO Guide for the Development of Bicycle Facilities –The 2010 Guide is under final review. Everything else on-road: We recommend using AASHTO, but we can’t enforce it. Don’t use only minimum design standards. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 22

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Shared Lanes Generally on lower volume roads. Wide outside curb lanes. Often enhanced with “Bike Route” signs. Bicyclists may need to “take the lane” to avoid debris, potholes, bumps, etc. Need to maintain smooth pavement. Need bicycle-safe grates. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 23

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Highway Shoulders Allow motor vehicles and bicycles to coexist. Shoulders wider than 6 feet usually can handle bicyclists: prefer 8 or 10 feet on busier highways. Need to maintain smooth pavement. Need bicycle-safe grates. Need to remove debris. Conflict with some State laws that prohibit using shoulders as travel lanes. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 24

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Rumble Strips Can be hazardous to bicyclists. Need “escape” spaces: AASHTO will propose: CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 25

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Bicycle Lanes: On-street lane for bicyclists. Usually same direction. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 26

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Bicycle Lanes Sometimes left side. Sometimes contraflow. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 27

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Intersections need special treatments. Caution with “Door Zones”. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 28

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Cycle Tracks: Controversial A bicycle facility next to roadway (1 or 2 way). More popular in Europe (Netherlands, Denmark) AASHTO Guide will address. May be grade separated from motor and pedestrian traffic. Intersection conflicts. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 29

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Bike Boulevards Interconnected routes favoring bicycle travel. Can be a mix of on-street, shared lanes, bicycle lanes, and trail connections. Relatively common in “college towns”. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 30

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities Roundabouts Ongoing discussion about bicyclists traveling through roundabouts. See the Bicycle Countermeasure Selection System (BIKESAFE): CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 31

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Facilities on Bridges Possible Bicycle Treatment for Bridges and Roundabouts: Olympia WA. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 32

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bicycle Amenities Bike racks on buses Bike racks on trains Bike parking for transit Public bike parking CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 33

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Pedestrian Facilities Go to the Accessible Design Course! Consider pedestrian amenities. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 34

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Pedestrian Amenities Eligible: Facilities related to transportation. Benches Bus shelters Trees Water Restrooms Trailside and trailhead facilities. Lighting: Don’t overdo! See CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 35

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Pedestrian Amenities Not Eligible Transportation funds should not substitute for park funds. Not eligible: –Picnic areas –Ball fields; bleachers –Running tracks around school fields –Park restrooms* –Other examples… * Unless primarily a trailhead for a transportation trail. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 36

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bridges Bridges: Essential Links. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 37

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bridges A bridge may be the “make or break” link for an interconnected nonmotorized transportation system. DOT Policy: DOT encourages bicycle and pedestrian accommodation on bridge projects including facilities on limited-access bridges with connections to streets or paths. –This includes potential connections to facilities on parallel or intersecting streets or paths. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 38

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Highway Bridges Design bridges for all potential users. Design highway bridges to accommodate emergency breakdowns. Consider possibilities for nonmotorized users at both ends: are there possible connections to local streets or paths? Motorists can handle several-mile detours; nonmotorized users cannot. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 39

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bridges Think about the context!!! Consider emergency needs. Bridges should account for vehicle breakdowns. Consider emergency access needs, but: You don’t need tractor trailer standards for most trail bridges. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 40

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Interstate Highway Bridge Woodrow Wilson Bridge: I-95 VA, MD, DC No previous nonmotorized connection. Connects to streets and trails. 1.1 mile, 12-foot wide. Barrier separated. Three “bump-out” areas. Displays, telescopes. Many awards. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 41

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Bridge Retrofit Steel Bridge, Portland OR Lift Bridge: Connects downtown Portland with the east side of the Willamette River. Highway on top Railroad below Trail connection added below. Gates for lift section. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 42

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Old Railroad Bridges Osage Prairie Trail Tulsa, OK Soo Line "S" Bridge Eau Claire WI CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 43

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Trail Bridges Farmington Canal Linear Park, Cheshire CT If there is good emergency access, you don’t need to design for heavy emergency vehicles. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 44

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Trail Bridges Ohio & Erie Canal Towpath Trail, Akron OH Bridge to extend the trail over the canal and under an active railroad track (hauling stone). Length: 130 feet. Metal-pitched roof protects trail users from debris. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 45

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Rail Bridge to Trail Bridge Walkway Over the Hudson Poughkeepsie – Highland NY CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 46

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Tunnels and Underpasses Design for the tallest likely user: –Maintenance vehicles? –Equestrians? CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 47

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Tunnels and Underpasses Design for Perception of Security –Good visibility through the underpass –Lighting if needed. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 48

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Traffic Control Devices The Manual on Uniform Traffic Control Devices applies to nonmotorized transportation facilities: See MUTCD Part 9 - Traffic Control for Bicycle Facilities (1.25MB)Part 9 - Traffic Control for Bicycle Facilities Avoid motorist and bicyclist confusion. MUTCD has bicyclist guide signs. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 49

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Maintenance and Operations If it is transportation, it should be: –Open for use just like local streets. –Open with no restricted hours of operation. –Open with no closures except for rare events (similar to local streets). –Maintained for use just like local streets. –YES, this includes snow and debris removal. If you build it: maintain it. CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 50

Field Engineers Learning & Development Seminar Dallas, TX — April 19-23, 2010 Questions, Comments, etc. ?????? CONSTRUCTION & PROJECT MANAGEMENT DESIGN GENERALIST PAVEMENT & MATERIALS 51