09.12.2014. Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team 09-12-2014.

Slides:



Advertisements
Similar presentations
Interpretation and Summary 1 Interpretation of Images and Summary Professor Mark Sims and Dr. Jim Clemmet Space Research Centre University of Leicester.
Advertisements

Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
The BepiColombo Mission
Overview of the Data Archive Plan by Luc Joudrier & Dave Heather
Michel Denis, ExoMars Ground Segment Manager, HSO-OPM
Instrument Adron-RM for ExoMars 2018
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
Russian contribution to ExoMars and the outline of further Mars Exploration programme NPOL TEAM IKI TEAMS COORDINATOR DANIIL RODIONOV
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
Chapter 1 Current Space Missions. Cassini-Huygens Website: Launch date: October 1997 Mission: This.
TARANIS a CNES Scientific Mission – C. Bastien-Thiry Workshop on Coupling of Thunderstorms and Lightning Discharges to Near-Earth Space – Corte 2008 TARANIS.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
1 ExoMars Programmatic situation December 2014 Rolf de Groot Head of Robotic Exploration Coordination Office ESWT#7 meeting, 9-10 December 2014, Altec,
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Slide: 1EUM/PPS/08/VWG/ October 2008 Programme Preparation 2 nd Post-EPS User Consultation Workshop Darmstadt, 3-4 February 2009 Lorenzo Sarlo.
Design of a Science Operations Centre for the ExoMars 2016 Trace Gas Orbiter Mission A. Cardesin Moinelo, D. Frew, L. Metcalfe, P. Martin, N. Manaud, A.
Status of ESA’s Mars Activities MEPAG meeting Washington DC, May 2014
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Status of the ESA Earth Observation Programmes Dr. Simonetta Cheli Head of Earth Observation.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
ExoMars LSEC 2018 Landing Site Engineering Constraints LSSWS# December 2014 L. Lorenzoni and ExoMars Project.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
DOC-TAS-EN-002 ALTEC Auditorium - Torino - Italy December 9-10, 2014 Bruno MUSETTI ESWT#7 – ESWT#7.
DEEP IMPACT The Mission Now
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Mars Exploration Rovers (MER) Entry, Descent, Landing, and Deployment.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
ESWT # Rover operations concept
Artist’s render of MSL on Mars.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Presentation to SCC Scrutiny Committee Audit Commission Inspection Monday 19 th January 2009.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
ESA UNCLASSIFIED – For Official Use ExoMars Pasteur Payload Status ExoMars Project Team Albert Haldemann ExoMars Payload and AIV Manager.
FEDERAL SPACE AGENCY OF RUSSIAN FEDERATION LAVOCHKIN ASSOCIATION "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT IKI, 13 October.
Exec/Board Paris February 2008 WP3.1 Infrastructure Roadmap: Progress Report.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Turin. ALTEC. DESCENT MODULE AND SURFACE PLATFORM ExoMars Science Working Team
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
By Maia :). Mission Profile page 1  Mars 3 was launched towards Mars from a Tyazheliy Sputnik Earth orbiting platform. A mid-course correction.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
K. Mercier, Shanghai meeting, 19th-22 May 2014 CNES, 5 th June 2014 Karine MERCIER EUSO Balloon Key Point Flight Acceptance Organisation.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
PDS Geosciences Node Page 1 PDS Geosciences Node Archiving Status Report Ray Arvidson PDS Management Council Washington, DC Nov , 2006.
Korea Responsible Care Council RESPONSIBLE CARE ® in KOREA March 2001 By KOREA RESPONSIBLE CARE COUNCIL.
Russian contribution to ExoMars TGO: Atmospheric Chemistry Suite (ACS) Alexey Shakun and ACS Team Berlin May 31, 2016.
ASI Science Programme Barbara Negri - Italian Space Agency (ASI) Head of Exploration and Observation of the Universe Department 10 Years of PAMELA.
Status of the MICE Construction Project
Soviet Venera Program.
Management Council Meeting, UCLA November 2012
ECSS-E-ST-50-15C Adoption Notice
The RSP Archive System RSP Archive Concept Review 28 September 2017
Update on WE Space-based GOS for Weather
Project Steering Committee Meeting 27 May 2015 :14h00 – 16h00
Project progress report WP2
EagleSat 2 – Program Overview
Memorandum of Understanding
Xoserve IX Refresh Customer Update 03/01/2019.
Status of U.S.-EU Bilateral Agreement
5. Conclusions and future work
CONSTITUENT BODY REFORM (CBR)
2015 January February March April May June July August September
Presentation transcript:

Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team

Turin. ALTEC. ESA ESTRACK 2016 Mission Carrier Module (CM) Surface Platform NASA DSN Rover Descent Module (DM) 2 Schiaparelli EDL Demonstrator Module (EDM) ESOC Spacecraft Operations Science Operations Centre ESAC ROS Antennas ROCC Science Archive Back-up Centre IKI LPOCC Programme Overview Two missions launched in 2016 and 2018  The 2016 mission consists of a Trace Gas Orbiter (TGO) and an EDL Demonstrator Module (EDM)  The 2018 mission consists of a Carrier Module (CM) and a Descent Module (DM) with a Rover and a stationary Landing Platform Trace Gas Orbiter (TGO) Proton M 2018 Mission. Proton M

Turin. ALTEC. 3 Main Organisation Documents & Activity Document & activityStatus Cooperation AgreementSigned Joint Management PlanSigned 2018 mission Responsibility MatrixSigned in 2013 and 2014 (update) 2016 mission Responsibility MatrixSigned in 2014 Planning Agreement Signed in 2013 and 2014 (update) 2016 and 2018 missions Master SchedulesUnder revision Joint Configuration Control Management DocumentSigned ExoMars Joint Programme Objectives DocumentSigned Joint ExoMars Steering BoardFormed Chief Designers‘ BoardFormed Standards Review Working GroupFormed and operational Landing Site Selection Working GroupFormed and operational

Turin. ALTEC. 4 TGO Science Instruments.  ACS – Atmospheric Chemistry Suite. The three spectrometers cover respectively the bands 0.7–1.7 µm, 2.3–4.6 µm., and 1.7–17.0 µm. ACS will study trace gases, profile isotope ratios, and contribute to atmospheric escape studies. Status: ACS-STM delivered to TAS-F. Flight hardware is scheduled for delivery at the end of March  FREND - Fine Resolution Epithermal Neutron Detector Neutron detector with a collimation module to significantly narrow the instrument’s field of view, thus allowing the creation of higher resolution maps of hydrogen distribution. Status: FREND-QM delivered to TAS-F. Flight hardware is scheduled for delivery at the end of February 2015.

Turin. ALTEC. 5 Progress on the 2018 Mission MISSION & SYSTEM  Joint DM Design Review  2018 DM DR Board Close-out took place on 13 October 2014  Several issues remained open however it was agreed to forward the open RIDs and issues to the S-PDR panels for disposition  System PDR  S-PDR Board session was held on November 6, 2014, with equal co-chairing of the European and the Russian participants  After the session the conclusion was made that S-PDR objectives has not been fully achieved  Final session of S-PDR Board is planned on May 5, March 2015 May 2015 April 2015 February 2015 December 2014 January 2014 Actions Closure Actions Acceptance #1 Actions Acceptance #2 2 Actions Acceptance #2 2 Responsibility Matrix Draft Close-Out Package Delivery Co-location Panel Endorsement S-PDR CO Board

Turin. ALTEC. 6 Progress on the 2018 Mission DESCENT MODULE  The DM baseline configuration is updated based on the DM DR outcome  DM de-scoping  re-distribution of functions of the Russian OBC-2 between the other Russian Units and European OBC-1  decrease of mass of the European RM  decrease of mass of the Russian scientific equipment on Landing Platform  Increase of clearance of landing platform  Optimization of power supply/ power consumption system  It is necessary to finalize PAS baseline configuration (number of stages, number of fixation points, loads at deployment etc.) CARRIER MODULE  A Carrier Module Design Review (Industry Level Review) completed  It is necessary to solve the issues on Power Supply System, thruster impact on DM, avoidance of collision with DM after separation

Turin. ALTEC. Descent Module (DM) 2018 SCC Overview – Cruise Configuration Adapter with separation system Carrier Module (CM)

Turin. ALTEC. 8 Parachute system Back Shield Rover 2018 DM Configuration Lander Front Shield

Turin. ALTEC. 9 Rover Landed Platform with Rover – latest configuration Lander

Turin. ALTEC. 10 MilestoneDate ESA Council at Min. Level2 December FM FREND and ACS deliveries to ESAFebruary – March Mission CD/E1 Rider 2 signature1 April Mission C/D Kick-OffTBD 2018 Mission S-PDR CO Board4 May Mission SCC Adaptor and Separation Mechanism Test June Mission EDM/TGO Mating for SCC Test11 June Mission FARSeptember 2015 (TBC) 2016 Missions start Launch Campaign in Baikonur26 October 2015 Major Short Term Milestones