MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS.

Slides:



Advertisements
Similar presentations
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
The ISOLDE robots upgrade JL GRENARD EN-HE ISOLDE Workshop and Users meeting
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Richard Catherall EN-STI CERN, 3rd July 2012 ISOLDE Technical Report for the ISCC.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Update on the Laser Beam Line
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
HIE-ISOLDE Design Study Richard Catherall EN-STI-RBS ISOLDE Workshop and Users Meeting th – 27 th November 2013.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
ISCC/INTC 10-11Nov 2015T. Stora on behalf of R. Catherall EN/STI Technical news MENU Technical Issues: HRS coupling table piston - BTY Line water leak.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Status of n_TOF Facility
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
The HIE-ISOLDE Design Study Richard Catherall ISOLDE Technical Coordinator CATHI Final Review Meeting Marina H10 Hotel, Barcelona 22 nd – 26 th September.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
A summary of the SPES Safety Technical Advisory Committee SSTAC Richard Catherall ISOLDE Technical Coordinator 5 th December 2014 INFN, Legnaro.
CERN-MEDICIS: Production d’isotopes selon l’approche « ISOLDE » pour la recherche médicale Thierry Stora EN-STI EN-GMS 5 th March 2013.
PAD-MAD requirements for Access in ISOLDE target area
I. Bergevoet - Training preparation
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Richard Catherall EN-STI 2nd February 2011
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
MEDICIS Facility Isotope Separator Controls and HMI
HIE-ISOLDE Project: Planning & Resources
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS

ISOLDE – ISCC 13 February 2015 - S.Marzari Outline: Introduction Time line Up to now Next steps Conclusions ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE experimental hall ISOLDE Class A laboratory ISOLDE Area ISOLDE experimental hall ISOLDE Target area Swiss – French border ISOLDE Class A laboratory CERN-MEDICIS project

CERN-MEDICIS principle: MEDICIS Target station Use protons (~90%) normally lost into the Beam Dump ZOOM Isotopes for ISOLDE ISOLDE Target station Protons 1.4 GeV Radio Isotopes production Beam dump MEDICIS Target station

CERN-MEDICIS day - 15 October 2014 - S.Marzari D=50 / L=100 D=20 / L=200 Simulations from R.Augusto EDMS 1289889 CERN-MEDICIS day - 15 October 2014 - S.Marzari

MEDICIS general layout Existing ISOLDE buildings Extension for MEDICIS ISOLDE and MEDICIS irradiation points Laboratory Monorail transport Robot Hot cell Mass separator Chemical lab Radioactive target storage Additional shielding New nuclear ventilation Fire doors (new fire sector) Quality control and shipping

What we already did in this time… 2. Time line (up to now): Building Shielding Irradiation point Ventilation Integration What we already did in this time… 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Ground breaking ceremony 4.9.2013 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari Earth works: earth samples analysis, move electrical services & 4000 m3 earth removal Drilling machine for soil analysis by RP 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Building: concrete foundations & walls 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Building: Magnetite concrete walls for shielding Magnetite concrete high density 3.9 kg/dm3 (normal concrete 2.2 kg/dm3) Magnetite ore Preparation 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari Building: Concrete roof , technical room for CV (ventilation) & laser for MEDICIS CV & laser 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Building: Earth recover ~3000 m3 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Internal: irradiation point and RCS (rail conveyor system) Proton Beam Cover earthed 60 kV Tests with protons: Done successfully ! Design by M. Vagnoni Test 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Internal: shielding (temporary and permanent) <0.5 uSv/h during 2014/15 Isolde operation 22m3 blocks (magnetite, iron, concrete and barite). Shielding Fluka optimization by Ricardo Augusto 42m3 of Magnetite ore temporary (by blowing) 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari Building: external finishing and doors (fire, ventilation & sound insulation for CV technical room) Many thanks to: GS-SE-DOP 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Next steps in this time period 2. Time line (next steps) : Ventilation Handling (Robot & monorail) Integration Shielded doors Off-line separator Next steps in this time period 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Ventilation, airlock SAS, access & connection Ventilation design & optimization EN-CV by A.Polato and A.Broche. Coring & connection Airlock SAS creation Piping… 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Robot, shielded doors and storage shelves (for 112 Targets) Storage shelves (V. Barozier & Y. Garvrikov) Robot Rail mounted (J-L. Grenard) Shielded doors: Delivery starts in March (K. Kershaw) Rail mounting 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Frontend, separator, collection box and services (HT, control, vacuum) Gas storage Power supply & HV Controls FE & separator 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Rail Conveyor System and shielding completion & 2nd air lock SAS HRS line and MEDICIS GPS line STATION Recovery shuttle & camera inspection Radiation Hard Wagon Conveyor Design by M. Vagnoni 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari Laboratory equipment Fume hoods Glove boxes 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

Final commissioning & start up… Tests: Handling (robot & conveyor) Off line device (Frontend, separator, collection) Access system Safety monitoring (environment, radioprotection) General safety (power cut, fire, ventilation…) Start up in 2016 ! 9 10 11 12 1 2 3 4 5 6 7 8 2013 2014 2015 2016 ISOLDE – ISCC 13 February 2015 - S.Marzari

3. Conclusion : Civil engineering schedule in LS1 was extremely tight => but we achieved it on time ! This shut down is also challenging with the new ventilation system and building integration The 2015 schedule is also extremely tight ! Luckily for this project we benefit from previous experience: Industrial Kuka robots and failure risk analysis (like ISOLDE) Storage shelves and movable shielding (like ISOLDE) Front End and separator design (like ISOLDE) ISOLDE operation and maintenance (50 years of operation) ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari What are the ISOLDE benefits from MEDICIS ? Upgrade of the nuclear ventilation system (safety) Upgrade of the access system (safety) Use of the RCS like a “RABIT” (for irradiation samples) Use of the RCS for camera inspection (during handling and recovery operations) Use of the RCS for ISOLDE targets handling (in and out) New hot target storage 112 targets (80% for ISOLDE, more flexibility for reusing old targets) Connection between new storage and new ISOLDE hot cell for target dismantling (remote handling without human intervention) Use of the buffer area 37 m2 (80% for ISOLDE) ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari THANKS for your Attention ! Acknowledgements ! Roland Arnoul, Ricardo Augusto, Roger Barlow, Vincent Barozier, Michele Battistin, Ana-Paula Bernardes, Michel Bonnet, Francesco Canepa, Richard Catherall, Michal Czech, Mathieu Deschamps, Alexandre Dorsival, Jean-Louis Grenard, Keith Kershaw, Ielyzaveta Kobzeva, Camille Lemesre, Roberto Losito, Christophe Loup, Christophe Mitifiot, Rene Necca, Julien Parra-Lopez, Eliseo Perez-Duenas, Andrea Polato, Giacomo Potuto, Silvain Samson, Eva Sanchez, Christelle Saury, Alexander Stadler, Thierry Stora, Matteo Vagnoni, Francesco Venturini, Joachim Vollaire, Thijs Wijnands ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari

ISOLDE – ISCC 13 February 2015 - S.Marzari Last integration view ISOLDE – ISCC 13 February 2015 - S.Marzari

CERN-MEDICIS day - 15 October 2014 - S.Marzari Ventilation network CERN-MEDICIS day - 15 October 2014 - S.Marzari