LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC 9 & 10 May :50: Start ramp for de-squeeze optics measurements 10:15: Measured squeezed optics 12:00: Dump 13:00: Start local aperture measurements.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Goal of the week: Stable beams with bunch trains … not quite achieved ! 1 OP summary of week 37 M. Lamont & J. Wenninger.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Pevatron status Sunday 29 th November 2015 Coordination: John Jowett, Mike Lamont, Jan Uythoven Access Loss maps Physics.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 13 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Wednesday 8.9 External crossing angles:
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Status of LHC Operations
Tuesday TOTEM and transverse loss map (1) OK
LHC commissioning Week 38
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Friday morning 10:30 Optics measurements and corrections.
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Summary for LPC (March 7th, Ralph Assmann)
Plan for 1 m b* J. Uythoven & J. Wenninger
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Daniel, Gianluca and Belen (for the Collimator team)
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont

Week 19 11/05/ Monday 4thOptics measurements curtailed Power cut P4 - BY08 – access – BLM issues part II Tuesday 5thPrep for collisions – SPS dipole Wednesday 6th15:00 beam back in SPS Collisions Thursday 7thQPS/S78 TDI set-up, 450 GeV loss maps Friday 8thCurtailed optics meas. FT ROF.A45B2 Injection kicker - oil Transfer line collimators ADT Set-up Saturday 9thSnapback De-squeeze Local aperture (PS POPS) RB67… cooling station BA6 – S12 cryo down Sunday 10thOut all day – cryogenics recovery

Availability 11/05/ NOT GOOD

Faults 11/05/ Total fault time 79 h 45 m 48% down-time

Friday 8th May 12:45: Transfer line collimators – In parallel gated BBQ for tune measurements commissioned – BLM latency measurement OK 19:00: Interlocked BPMs re-checked 19:30: Set-up of transfer damper (ADT) 11/05/2015 5

Saturday 9 th May 01:15: Ramp for snapback measurement 7:50: de-squeeze and optics measurements 13:00: Start local aperture measurements at the IPs 18:15: Beam used, no new beam from PS 19:45: Start pre-cycle – RB.A67 tripped at 230A – problem with one of the redundant power supplies on QPS crate removed the power permit. Probably a breaker has tripped. Access required… 22:45: …..cryo lost S12 due to water fault, water pumping station of BA6 is down….. 11/05/2015 6

Sunday 10 th to Monday 11 th 23:15 Cryogenics back (fault time: 24h22m) 01:30 Ramp nominal – Losses around 20 s – horizontal Q’ 03:00 Trip of the inner triplet due to loss of cryo in XL2. – After the recovery the cryo has been unstable and we have been loosing the cryo start regularly for IT2, this time cryo maintain as well. 05:40 SPS injection septum in fault 11/05/ Now: optic measurements and correction: flat-top and squeeze many thanks to Rogelio and OMC for their flexibility

HIGHLIGHTS 11/05/2015 8

TDI set up and validated Put TDIs at measured settings and cross-checked hierarchy wrt TCP (X- measurement) Validated also for injected beam in I&D with pilot applying different kicks to the injected beam Final settings: 11/05/ B1 TDI Angle (200 and 234 urad) B2 TDI Angle (281 and -429 urad Chiara, Wolfgang, Linda & Florian

Ring Collimators Nominal injection settings deployed for all ring collimators in the injection beam process These are good for up to ~50 nominal bunches at 450-GeV Ramped up to coarse settings at flat top 11/05/ Collimation team

Loss maps With injection protection in and out Full set and asynch dumps – Example of off-momentum loss map, Hz Looks good 11/05/ Collimation team Momentum collimation

Collisions Decided after Tuesday 8:30 meeting that for 450 GeV collisions the tertiary collimators TCT should be moved in and verified by loss maps – Collisions found with 2 nominal – Use collision tunes – TCTs 13  11/05/ Eventually after an SPS dipole change…

Transfer Line Collimators Started with steering the lines and establishing golden trajectories Had some issues with collimator controls to change settings of TCDIs - was solved with SW release New combined SPS cycle for pilot and nominal is not working for automatic scan application, have to use the pilot cycle for this measurement Will come back to proceed with the measurement of TCDI centres 11/05/ Chiara, Wolfgang and ABT team

Transverse Damper Injection Oscillation fixed display works, it shows the first bunch of the injected batch Closed all 8 feedback loops with pilot bunches Closed all 8 feedback loops with nominal bunches Functions arrive correctly, minor changes in phase shifts, to be propagated to LSA Loops close/open at injection and beam dump events Still some work left 11/05/

Local Aperture Measurements IR1: – First losses observed on MQX with half crossing -430urad (due to B2). However, this step must be repeated because not clear losses were observed – First losses observed on MQX with half crossing 500urad. Clear losses observed on C3R1 due to B2. – Regarding the separation plane, losses were observed with bumps of -400urad and +320urad. IR 2 only separation plane B1 due to limited beam availability – Regarding the separation plane, losses were observed with bumps of -490urad and +320urad. IR5: – Regarding the separation plane, losses were observed with bumps of +340urad. DM, PH, GV + OP crew 11/05/

Gated BBQ for Tune measurement Aligned gate of B1 & B2 gated BBQ The pilot is not seen by the gated BBQ - as predicted by Marek 11/05/ Wire scanners and K- modulation measurements continues – Maria Kuhn

Snapback and Q’ Start with pre-cycle – chroma injection Expert comes in to look at tune signal  change settings which were ‘lost’ 11/05/ Tune signal with freq. modulation over the ramp Matteo

De-Squeeze: Smooth Played the full de-squeeze to collisions: Ran the tune change QCHANGE BP to move to collision tunes Ran the de-squeeze in one step with collision tunes Ran the BP to adapt the crossing angles – IR5 from 145 to 0, IR8 from 230 to 320 microrad Ran the collision BP (all separations off) Measured optics When the optics is corrected (if needed) the sequence is ready for nominal bunches and setup of collisions (and TCTs) 11/05/ Laurette, Ron, Jorg

Status – quick summary Optics – Measured at intermediate squeeze points – in progress, corrections to be applied Collimation – Good to go at 450 GeV – Coarse settings in ramp and at 6.5 TeV Nearly ready for higher intensities at 450 GeV – quick test of the BETS-TCDQ to validate Nominal ramp – Work in progress ULO stable 11/05/

Incoming Finish optics measurements and corrections High intensity at injection (up to 40 nominal) Nominal ramp Pilot ramp with constant collimators centres - check at 6.5 TeV ULO monitoring … 11/05/ This week’s coordinators: Jorg Wenninger, Jan Uythoven