Class 21: Bidding Strategy and Simulation What is a “bidding strategy”? –System of determining what to bid –For example: signal with winner’s curse subtracted.

Slides:



Advertisements
Similar presentations
1 Project 2 Bidding on an Oil lease. 2 Project 2- Description Bidding on an Oil lease Business Background Class Project.
Advertisements

Statistics Estimates and Sample Sizes
Simulation Operations -- Prof. Juran.
Sampling Distributions
McGraw-Hill Ryerson Copyright © 2011 McGraw-Hill Ryerson Limited. Adapted by Peter Au, George Brown College.
Consider the graphs of f(x) = x – 1 and f(x) = lnx. x y y = x – 1 y = lnx (1.0) Sections 2.6, 2.7, 2.8 We find that for any x > 0, x – 1 > lnx Now, suppose.
Chapter 8 Estimating Single Population Parameters
Topics-NOV. Recall-Project Assumptions Assumption 1. The same 19 companies will each bid on future similar leases only bidders for the tracts(This assumption.
Project: – Several options for bid: Bid our signal Develop several strategies Develop stable bidding strategy Simulating Normal Random Variables.
1 Difference Between the Means of Two Populations.
Tycoon Oil Team 6 Theresa Kayzar Zach Pendley James Rohret Sample pages from report.
Simulating Normal Random Variables Simulation can provide a great deal of information about the behavior of a random variable.
Project 2 Introduction. Auctions Common way to sell Different types: - First-price sealed-bid - Second-price sealed-bid - English (open outcry) - Dutch.
Example 12.1 Operations Models: Bidding on Contract.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 7-1 Chapter 7 Confidence Interval Estimation Statistics for Managers.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 10 th Edition.
1 Business 90: Business Statistics Professor David Mease Sec 03, T R 7:30-8:45AM BBC 204 Lecture 23 = Finish Chapter “Confidence Interval Estimation” (CIE)
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 7-1 Introduction to Statistics: Chapter 8 Estimation.
MISC.. 2 Integration Formula for consumer surplus Income stream - revenue enters as a stream - take integral of income stream to get total revenue.
Simulations There will be an extra office hour this afternoon (Monday), 1-2 pm. Stop by if you want to get a head start on the homework. Math 710 There.
Monte Carlo Methods A Monte Carlo simulation creates samples from a known distribution For example, if you know that a coin is weighted so that heads will.
Probability Distributions Random Variables: Finite and Continuous A review MAT174, Spring 2004.
Fall 2006 – Fundamentals of Business Statistics 1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter 7 Estimating Population Values.
Strategy 1-Bid $264.9M - Bid your signal. What will happen? Give reasoning for your analysis Had all companies bid their signals, the losses would have.
Chapter 7 Estimating Population Values
Project 2-Guidelines. Recall- Class Project-Goals  Determine what would be expected to happen if each company bid the same amount as its signal.  Determine.
Silly Putty™ Petroleum Mandy Gunville Cody Scott Matt Shucker Catherine Strickland Sample pages from report.
Sections 2.1, 2.2, 2.3, 2.4, 2.5 Interest problems generally involve four quantities: principal(s), investment period length(s), interest rate(s), accumulated.
Random Sampling  In the real world, most R.V.’s for practical applications are continuous, and have no generalized formula for f X (x) and F X (x). 
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Business Statistics, A First Course.
Simulation.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 7-1 Chapter 7 Confidence Interval Estimation Statistics for Managers.
Monte Carlo Methods A Monte Carlo simulation creates samples from a known distribution For example, if you know that a coin is weighted so that heads will.
Spreadsheet Demonstration
Example 12.6 A Financial Planning Model | 12.2 | 12.3 | 12.4 | 12.5 | 12.7 |12.8 | 12.9 | | | | | | |
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 7-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
Confidence Interval Estimation
+ DO NOW What conditions do you need to check before constructing a confidence interval for the population proportion? (hint: there are three)
597 APPLICATIONS OF PARAMETERIZATION OF VARIABLES FOR MONTE-CARLO RISK ANALYSIS Teaching Note (MS-Excel)
Chapter 8: Confidence Intervals
Chap 8-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Chapter 8 Confidence Interval Estimation Business Statistics: A First Course.
Estimation of Statistical Parameters
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 11 th Edition.
Understanding Basic Statistics Chapter Seven Normal Distributions.
1 Estimation From Sample Data Chapter 08. Chapter 8 - Learning Objectives Explain the difference between a point and an interval estimate. Construct and.
Sullivan – Fundamentals of Statistics – 2 nd Edition – Chapter 3 Section 2 – Slide 1 of 27 Chapter 3 Section 2 Measures of Dispersion.
Chap 7-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition Chapter 7 Estimating Population Values.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Confidence Interval Estimation.
ESD.70J Engineering Economy Module - Session 21 ESD.70J Engineering Economy Fall 2009 Session Two Michel-Alexandre Cardin – Prof. Richard.
Agresti/Franklin Statistics, 1 of 87  Section 7.2 How Can We Construct a Confidence Interval to Estimate a Population Proportion?
Simulation Using computers to simulate real- world observations.
Simulation is the process of studying the behavior of a real system by using a model that replicates the system under different scenarios. A simulation.
Risk Analysis Simulate a scenario of possible input values that could occur and observe key impacts Pick many input scenarios according to their likelihood.
Chap 7-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition Chapter 7 Estimating Population Values.
+ The Practice of Statistics, 4 th edition – For AP* STARNES, YATES, MOORE Unit 5: Estimating with Confidence Section 11.1 Estimating a Population Mean.
Risk Analysis Simulate a scenario of possible input values that could occur and observe key financial impacts Pick many different input scenarios according.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 7-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
Auctions serve the dual purpose of eliciting preferences and allocating resources between competing uses. A less fundamental but more practical reason.
1 Chapter 8 Interval Estimation. 2 Chapter Outline  Population Mean: Known  Population Mean: Unknown  Population Proportion.
Department of Quantitative Methods & Information Systems
HAWKES LEARNING SYSTEMS Students Matter. Success Counts. Copyright © 2013 by Hawkes Learning Systems/Quant Systems, Inc. All rights reserved. Section 8.3.
HAWKES LEARNING SYSTEMS Students Matter. Success Counts. Copyright © 2013 by Hawkes Learning Systems/Quant Systems, Inc. All rights reserved. Section 8.1.
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Business Statistics: A First Course 5 th Edition.
Statistics for Business and Economics 8 th Edition Chapter 7 Estimation: Single Population Copyright © 2013 Pearson Education, Inc. Publishing as Prentice.
Monte Carlo Simulation
Confidence Intervals for a Population Mean, Standard Deviation Known
Confidence intervals for the difference between two means: Independent samples Section 10.1.
2/5/ Estimating a Population Mean.
Presentation transcript:

Class 21: Bidding Strategy and Simulation What is a “bidding strategy”? –System of determining what to bid –For example: signal with winner’s curse subtracted How do we determine what is a good strategy? –Do simulation and see what would happen in the long run

Bidding Strategies We May Consider 1.Bid our signal 2.Bid our signal minus Winner’s Curse 3.Bid our signal minus both the Winner’s Curse and the Winner’s Blessing 4.Optimize our bid if all others subtract WC + WB 5.Optimize our bid if all others subtract WC 6.Find stable equilibrium Today: Strategy 2 and 3: Simulation to estimate the Winner’s Curse and Winner’s Blessing

Strategy 1-Bid $264.9M - Bid your signal. What will happen? Give reasoning for your analysis Had all companies bid their signals, the losses would have been huge, ranging from 14.1 to 37.3 million dollars! Evidently, bidding one’s signal is a disastrous strategy. Strategy 1 not optimal because the extra profit values for the historic auctions are all negative, indicating that each winner paid more for the lease than it was worth to the company.

Strategy 1-Bid $264.9M

“Winner’s Extra Profit” is almost always negative. That is, the winning company will not get its needed fair return on the lease. Strategy 1 is not optimal because, the highest signal will almost always be well above the value of the lease and the winning company will have paid too much for the drilling rights. This is called the winner’s curse(we will learn how to calculate after simulation of Normal Errors).

Winner’s Curse Average amount of money lost by the company that wins the bid if all companies bid their signals Estimate the winner’s curse by finding the average amount by which the highest signal exceeds the proven value Winner’s curse is the average maximum error

Strategy 2: Remove Winner’s Curse Strategy: All companies bid their signal reduced by winner’s curse Company with highest signal wins On average, winner does not loose money But on average winner does not make money

Winner’s Blessing Average amount paid by winner above the second highest bid; this money is wasted Estimate the winner’s blessing as the difference between the highest and second highest signals Winner’s blessing is the difference between the largest and second largest errors

Strategy 3: Remove Winner’s Curse AND Winner’s Blessing Strategy: All companies bid their signal reduced by the winner’s curse plus the winner’s blessing Company with the highest signal wins On average, the winner makes an amount equal to the winner’s blessing

Strategy 4- Find a optimal adjustment for company 1. Assume all other companies Subtract Winner’s curse and Winner’s blessing from their signals to obtain their bids.

on the project Probability, Mathematics, Tests, Homework, Computers Bidding on an Oil Lease for Company 1 must find the maximum expected value of adjustment(assuming that all other companies subtract both the curse and blessing) this best adjustment, a cb Strategy 4-Constructing f(a) function

 copy from the sheet Strategy in Auction Focus.xls to a new book  Let f(a) be the expected value for Company 1 for subtracting a million dollars from its signal, assuming that all other companies adjust their signals by both the curse and blessing.  Fit a 4 th degree polynomial trend line, which we will use as an approximate formula for the unknown function f.  Use solver to find the best adjustment f(a) function Strategy 4-

Strategy 4- Company 1 will Bid=$264.9M-$21.28M=$243.62M

Is Strategy 4 optimal ? No This is the real world of business, where we expect our competitors to be well-managed companies other 18 companies are sitting in their offices and boardrooms making the same calculations that we have just performed. Given the results, other companies will also elect to subtract less than 31.38million dollars from their signals. It is worth noting that the 21.28million dollar adjustment that is our appropriate response to a larger reduction by the other companies, is not itself a stable strategy. Since this is less than the winner’s curse of 25 million dollars, there would be a negative expected value for extra profit if all companies adjusted downward by 21.28million dollars.

Strategy 5 -Find a optimal adjustment for company 1. Assume all other companies Subtract Winner’s curse from their signals to obtain their bids.

Strategy 5- Company 1 will Bid=$264.9M-$30.81M=$234.09M

on the project Probability, Mathematics, Tests, Homework, Computers Bidding on an Oil Lease Simulating, Focus  TI Auction Focus.xls (material continues) Class Project C for Company 1 must find the maximum expected value of adjustment(assuming that all other companies subtract both the curse and blessing) this best adjustment, a c Strategy 5- Constructing g(a) function

 USE the sheet Strategy in Auction Focus.xls.  Let g(a) be the expected value for Company 1 for subtracting a million dollars from its signal, assuming that all other companies adjust their signals by curse.  Fit a 4 th degree polynomial trend line, which we will use as an approximate formula for the unknown function g.  Use solver to find the best adjustment the use of Solver in Strategy shows that g(30.8) = 0. Hence, a c = 30.8 million dollars. Company 1’s best response to an adjustment of 25 million dollars by all other companies is to lower its signal by the considerably larger amount of $30.8M Strategy 5 -g(a) function

Is Strategy 5 optimal? if we know what all other companies plan to do. Moreover, this same information is available to all of the bidders. Need a stable strategy??? If all companies made such a stable adjustment to their signals, then there would be no incentive for anyone to alter the strategy. A stable bidding strategy is also called a Nash equilibrium

Strategy 6 Finally, each team should experiment with Auction Equilibrium.xls to determine a stable Nash equilibrium bidding strategy for its auction scenario. This will lead to a modification of your team’s signal and a specific bid in the upcoming auction. Need to enter different values for the blue cell and experiment until the two cells are equal(this will take a LONG time. We will use 10 iterations and get the average $27.031M

Strategy 6

(2wc+wb)/2

Excel method for Strategy 6 How? (a)Use Auction Equilibrium.xls(. (b)FOLLOW THE INSTRUCTIONS IN THIS FILE! (c)Enter appropriate values in cells B10 through E10. (d)Enter a logical value in cell E39. Run the macro Optimize. (the first logical value to use- (2wc+wb)/2 (e)Enter another logical value in cell E39 and press the key F9.. record numbers in a table. (f)See table (g)Find the stable adj for strategy 6

Excel method for Strategy 6 Company 1 Optimal Adjustment, a max (use 4 decimals) All Other Companies Adjustment Subtracted From Signal New logical value ( )/2= Avg of a max =final stable adj for strategy 6 first logical value to use for class project- (2wc+wb)/2=28.19

Strategy 6- Company 1 will Bid=$264.9M-$27.031M=$ M Using Auction Equilibrium.xls to determine 10 stable strategy values, and averaging the results, we find a signal adjustment of million dollars. This provides our Nash equilibrium and is the final answer to our bidding strategy problem. If each company reduced its signal by $27,031,000 then there would be no expected gain for any one company, if it deviated from this plan. Specifically, we will reduce our signal of $264,900,000 by $27,031,000 and submit a bid of $237,869,000.

Strategy 6-Stable because it uses Nash Concept Signal Adj for the Error Results Of Adjustment WCWBCompany 1 All other companies(2- 19)Company 1 Average For All Other Companies Probability of Winning Mean Extra Profit If Company Wins Expected Value Of Adjustment

Summary of other Strategies Strategy 4 Strategy 5 Strategy 2 Strategy 3

Recall-Project Assumptions Assumption 1. The same 19 companies will each bid on future similar leases only bidders for the tracts(This assumption is important for the Nash concept) Assumption 2. The geologists employed by companies equally expert (evidence- the Mean of errors of all historical leases is 0 ) on average, they can estimate the correct values of leases. evidence each signal for the value of an undeveloped tract is an observation of a continuous random variable, S v,

Recall-Project Assumptions Assumption 3. Except for their means, the distributions of the S v ’s are all identical (The shape /The Spread)-This allows us to treat all the 20 historical leases as one sample -> We use the sample to show that mean of errors is 0 & find the standard deviation of errors) Assumption 4. All of the companies act in their own best interests, have the same profit margins, and have the same needs for business. Thus, the fair value of a lease is the same for all 19 companies.

Simulation: Why? To estimate Winner’s Curse, why not just look at historical data? We could, but get a better estimate with more data We need more error data! We can do Monte Carlo simulation if we know the distribution of errors Plot normal distribution (with mean 0 and standard deviation you found) alongside your errors

How We Know the Errors are Approximately Normally Distributed: Graphs from Class Project Make similar graphs for your errors; use mean 0 and your standard deviation (see Normal page of Auction Focus)

Simulation: Use Normal CDF Simulation: Use Normal CDF The simulation creates a large number of errors, coming from the same normal distribution as the ones in our historical data CDF standard normal CDF normal mean = 0, st dev =13.5 Use = NORMINV(Rand(), 0, StDev). Gives a random value from a normal distribution with mean of 0 and your team’s standard deviation

Doing the Simulation for Your Team’s Data Redo the graphs using a mean of 0 and your standard deviation; check that your errors are approximately normal Make new simulation of errors for the Error Simulation page. You should have 10,000 sets of as many companies as you have. Each entry should be = NORMINV(Rand(), µ, σ) Check that the maximum and minimum errors are reasonable; if not press F9 “Freeze” by doing Copy and Paste Special