Critical Design Review. Intimidator 5: 5” diameter, 10’ length, 45 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5715- RockSim.

Slides:



Advertisements
Similar presentations
University of Florida Hybrid Rocket Team’s Mile High Club
Advertisements

University of Florida PDR Presentation. Vehicle Design Diameter: 5.86 Length: 135 Static Stability Margin: 1.4 Total Weight: 23.6 lbs.
BYU Rocket Team Special thanks to:
Preliminary Design Review. Rocket & Payload Schematic.
Northwestern University Space Technology and Rocketry Society (NUSTARS) NASA Student Launch Flight Readiness Review March 16, 2015.
U NIVERSITY OF F LORIDA T HE M OST I NTERESTING R OCKET IN THE W ORLD.
P RELIMINARY D ESIGN R EVIEW University of North Dakota Frozen Fury Rockety Team.
Critical Design Review NASA University Student Launch Initiative University of Nebraska–Lincoln
Student Launch Project Preliminary Design Review January 10, 2014.
Illinois Space Society Tech Team USLI CDR Presentation.
Project Λscension. Vehicle Dimensions Weight: 19.6 Ib Length: in (9 ft. 4.5 in) Diameter: 6 in Fin Semi-Span: 6 in.
St. Vincent – St. Mary CDR Presentation NASA Student Launch Initiative.
Our Mission Statement  Launch a high-power rocket to an altitude of one mile carrying the Operation: Epic Beep payload package. At lift off, the rocket’s.
NASA CDR Presentation Spring Grove Area High School.
St. Vincent – St. Mary FRR Presentation NASA Student Launch Initiative.
UAA Rocketry Critical Design Review Presentation.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
Student Launch Project Critical Design Review February 28, 2014.
Flight Readiness Review. Intimidator 5: 5” diameter, 10’ length, 47 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5203’- RockSim.
November 7,  Length: inches  Diameter: 6.00 inches  Mass: oz. / 17.34lbs.  Span: inches  Center of Gravity: inches.
The effect of gravitational stress on the diffusion of liquids. New team SLI 2012.
Flight Readiness Review Atomic Aggies. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC.
Launch Vehicle  Launch Vehicle Summary  The length of the rocked is inches, and the mass is ounces.  We have a dual Deployment Recovery.
Illinois Space Society Tech Team USLI FRR Presentation.
CDR Clear Lake's Team Rocket 2929 Bay Area Blvd. Houston, TX
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Preliminary Design Review “Analysis of Atmospheric Cosmic Radiation Distribution as a Function of Altitude” Steven Schroeder-Program Manager Damon Emerson-Rocket.
Student Launch Project Flight Readiness Review April 21, 2014.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
Flight Readiness Review Team Hawaii. Vehicle Properties Diameter (in)6 inches Length (in)127 inches Gross Liftoff Weight (lb)50.25 lb Launch Lug/button.
3/19/09. Animal Motor Works (AMW) K475WW High Power Rocket Motor. 54 mm casing, 40.3 cm long, 2.9 seconds burn time, 1394 N-sec total impulse, and
The Rocket Men Project One Giant Leap. Final Launch Vehicle Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom.
The Comparative Analysis of Airflow Around a Rocket.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
The Effect of Acceleration on the Crystallization of Sodium Acetate.
The Comparative Analysis of Airflow Around a Rocket.
The Efficiency of Flexible Solar Panels and Changes in the Earth’s Magnetic Field at Altitude.
University of Florida Rocket Team Critical Design Review Presentation.
Critical Design Review Presentation Jan. 20, 2011.
Harvard-Westlake Rocketry Club SLI FRR.
Atomic Aggies CDR. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Project Ares University of Central Florida NASA Student Launch 1/28/2015.
Preliminary Design Review “The Distribution of Ionizing Radiation with Altitude” Left to Right: Tom L.- Payload James Z.-Construction Izzy S.- Audio Visual.
The Rocket Men Project One Giant Leap. Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom Body Tube Length-
D EPARTMENT OF M ECHANICAL AND A EROSPACE E NGINEERING HIGH POWERED ROCKETRY CLUB PDR PRESENTATION 1.
Hemodynamics Star Splitters 4-H Club Two Rivers, WI Hemodynamics.
HARDING UNIVERSITY FLYING BISONS A Study of Atmospheric Properties as a Function of Altitude Flight Readiness Review.
University Student Launch Initiative Preliminary Design Review University of Illinois at Urbana-Champaign Team Rocket.
NUSTA RS NASA Student Launch MAV Challenge 2016 Preliminary Design Review 6 November 2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
NUSTA RS NASA Student Launch MAV Challenge 2016 Critical Design Review 15 Janurary2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
Critical Design Review Presentation Project Nova.
Flight Readiness Review UNIVERSITY OF SOUTH ALABAMA CONNER DENTON, JOHN FAULK, NGHIA HUYNH, KENT LINO, PHILLIP RUSCHMYER, & ANDREW TINDELL MENTOR : RICHARD.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
Project Aegis Preliminary Design Review Team Members:
Rocketry.
Critical Design Review Presentation
2018 First Nation Launch - Flight Readiness Review
November 7, 2014.
November 7, 2014.
Final Readiness Review
2019 First Nation Launch – FRR Virtual Review
2019 First Nation Launch – PDR Virtual Review
2019 First Nation Launch – Oral Presentation
2019 First Nation Launch – CDR Virtual Review
2019 First Nation Launch – Oral Presentation
Presentation transcript:

Critical Design Review

Intimidator 5: 5” diameter, 10’ length, 45 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude RockSim AeroDRAG  Altitude reached can be reduced by adding weight and deploying airbrakes. With brakes deployed for entire flight ~ 3,300 ft

 Thrust to weight ratio= 6.5:1 Well above the suggested 5:1  Launch Rail: 12 ft high Exit velocity - 65 ft/s - RockSim

 Parachute sizes Drogue – 3 ft Main – 12 ft  Parachute descent rates Drogue: Must be between 50 and 100 ft/s  ft/s– RockSim  ft/s – Mathcad Main: Must be between 17 and 22 ft/s  21.1 ft/s– RockSim  ft/s– Mathcad

 Static Stability Margin: 2.88 overstable

 Vacuum chamber testing of the R-DAS system and recovery altimeter completed  Scale model launch completed  Static testing of scale model motor completed

 Remaining tests: Verify all R-DAS components in rocket (January 30) Bench Test UVA, relative humidity, and solar irradiance sensors (January 26 – 31) Verify airbrake deployment using vacuum chamber (February 24 – March 3) Vibration Test (February 28 – March 3) Static tests:  Ejection charges (February 20)  Thrust curve of Aerotech L1300R (February 20) Full scale launch (March 5, March 26)

 Results Two altimeter readings: 2556 ft and ~2700 ft Predicted altitude from RockSim: ft Predicted altitude from AeroDRAG: ft  Predictions match results within reason  Successful launch, partially successful recovery system

 Vacuum chamber used to verify deployment of drogue parachute at apogee and main parachute at predetermined height. Drop in pressure causes altimeter to detect a change in “altitude”

 Aerotech K805 G  S-load cell used  Results matched closely to expected values Maximum thrusts of 190 lbs (static test) vs 210 lbs (Aerotech)  Further calibration necessary

 Ejection charge amount determined from Modern High Power Rocketry 2 by Mark Canepa Drogue amount – 2.5 grams (redundant charge will be 3.75 grams) Main amount – 7.5 grams (redundant charge will be grams)  To verify that the charges will provide adequate force, the rocket will be fully assembled with charges  Following similar procedures to vacuum testing, the charges will be ignited to verify performance

 Payload bay acts as coupler for attaching body tubes Dimensions sized with this in mind  Materials used will ensure integrity of bay  Pressure seal will guarantee accuracy of measurements

 11 Local businesses were contacted One possible sponsor  Local middle school students will build and launch small rockets A class motors will be used Presentation on rocketry will be given  Lafayette hosts an afterschool program for underprivileged children Water bottle rockets will be launched with them