XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.

Slides:



Advertisements
Similar presentations
EPIC Calibration Meeting, Mallorca Update of EPIC pn long-term monitoring K. Dennerl, 2009 March 31 Update of EPIC pn long-term monitoring Mallorca, Spain,
Advertisements

EPIC Calibration Meeting, Mallorca Low energy calibration with the Vela SNR K. Dennerl, 2009 March 31 Low energy calibration with the Vela SNR Mallorca,
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2003 Mar Temporal variation of the energy response determined with the internal calibration source.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM EPIC MOS Andy Read 2 nd EPIC BG WG Meeting MPE, Germany 24/11/05-25/11/05.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 EPIC pn at low energies: LW mode Properties of EPIC pn at low energies: LW mode.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
The problem with double event patterns (M. Brusa, K. Dennerl – MPE) EPIC CAL/OPS meeting - MPE.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept offset map correction Spatial variation of the energy scale Energy correction for pixels.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM EPIC MOS Steve Sembay MPE 04/05/06 The Effective Area of EPIC A comparison of MOS1, MOS2 and PN derived fluxes of 17 on-axis AGN.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Tuebingen 03/02/03-06/02/03 MOS Cooling Results and Current Response Both MOS Cameras.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
Mallorca EPIC Cal Meeting - February 2005 Darren Baskill: XMM project: MOS monitoring.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept Spatial variation of the energy scale Energy correction for pixels with an incorrect.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 CTI.. update for EPIC pn EPIC pn: Update on the CTI, the absolute energy scale and the energy.
MPE EPIC Cal Meeting – May 2006 Darren Baskill: XMM project: MOS gain monitoring MOS.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
XMM Calibration/Ops Meeting Mallorca 1-3 Feb MOS2 CCD2 & CCD5 noise problems Tony Abbey, Leicester University.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2004 March Detector noise & Vela observations application to Vela observations EPIC pn detector.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Correct treatment of fast mode ARFs Marcus G. F. Kirsch, G. Schoenherr, E. Kendziorra,
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Column rejection in the MOS  The core of soft sources is removed by the standard emchain.  Due to very large fluctuations in count rate from one column.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
Bit flips in the MOS offset tables  First detected in 0640_ MOS 1, CCD 6 by M. Ceballos in routine screening. RAWY=303 had its offset increased.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
EPIC Calibration Meeting, Mallorca Origin of gain offsets K. Dennerl, 2008 April 8 Origin of gain offsets: new insights from eROSITA calibration Mallorca,
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Experience with combined Fe55 / Tycho SNR calibration
EPIC Calibration & Operations Meeting
Update of EPIC pn long-term monitoring
Long-term trends in EPIC pn energy response
Presentation transcript:

XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006

XMM-Newton 2 Michael Smith, ESAC Hot Pixels

XMM-Newton 3 Michael Smith, ESAC Noisy Pixels

XMM-Newton 4 Michael Smith, ESAC Noisy Pixels FF 50-Iteration Offset Introduction

XMM-Newton 5 Michael Smith, ESAC Noisy Pixels

XMM-Newton 6 Michael Smith, ESAC Offset Median

XMM-Newton 7 Michael Smith, ESAC Offset Variance

XMM-Newton 8 Michael Smith, ESAC Offset Variance First Observations per Revolution Eclipse Season Boundaries

XMM-Newton 9 Michael Smith, ESAC Offset Maps Normal Variance Excessive Variance

XMM-Newton 10 Michael Smith, ESAC Mean Row Offset vs RAWY Normal Variance

XMM-Newton 11 Michael Smith, ESAC Mean Row Offset vs RAWY Excessive Q0 & Q2 Variance

XMM-Newton 12 Michael Smith, ESAC Mean Row Offset vs RAWY Excessive Q1 & Q3 Variance

XMM-Newton 13 Michael Smith, ESAC CalClosed Line Widths vs Offset Map Variance Quadrant 0Quadrant 1

XMM-Newton 14 Michael Smith, ESAC Rev 1114 Temperature Excursions Rev 1114: 07/01/ :48z SEU causes spurious switch-on of EPIC substitution heater during observation Resulted in PN CCD temperature excursions of +3.6 to –2.7 deg C with respect to nominal value of –89.8 deg C

XMM-Newton 15 Michael Smith, ESAC

XMM-Newton 16 Michael Smith, ESAC

XMM-Newton 17 Michael Smith, ESAC

XMM-Newton 18 Michael Smith, ESAC

XMM-Newton 19 Michael Smith, ESAC

XMM-Newton 20 Michael Smith, ESAC

XMM-Newton 21 Michael Smith, ESAC

XMM-Newton 22 Michael Smith, ESAC

XMM-Newton 23 Michael Smith, ESAC

XMM-Newton 24 Michael Smith, ESAC

XMM-Newton 25 Michael Smith, ESAC

XMM-Newton 26 Michael Smith, ESAC

XMM-Newton 27 Michael Smith, ESAC Individual noisy pixel spectrum at warm, cool and nominal T

XMM-Newton 28 Michael Smith, ESAC CCD 11 Column 63 segment spectrum at warm, cool and nominal T

XMM-Newton 29 Michael Smith, ESAC Overall spectrum: warm w.r.t. nominal T

XMM-Newton 30 Michael Smith, ESAC Overall spectrum: cool w.r.t. nominal T

XMM-Newton 31 Michael Smith, ESAC Energy Scale vs Time very good, esp. for FF mode. Still slight over-correction for EFF mode. SW mode under-correction, esp. at Mn (Result of SAS 6.1 Processing) M. Kirsch

XMM-Newton 32 Michael Smith, ESAC Line width trend is stable ~0.5 ADU/year increase at Mn (Result of SAS 6.1 Processing) M. Kirsch

XMM-Newton 33 Michael Smith, ESAC MOS Monitoring MPE, May 2006

XMM-Newton 34 Michael Smith, ESAC MOS1 Bad Pixels MOS2

XMM-Newton 35 Michael Smith, ESAC