Bill SahrEVLA M&C Transition System Software CDR December 5-6, 2006 1 EVLA Monitor & Control Transition System Software Overview.

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
1 OBJECTIVES To generate a web-based system enables to assemble model configurations. to submit these configurations on different.
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 Alerts Rich Moeser.
Software for Science Support Systems EVLA Advisory Committee Meeting, March 19-20, 2009 David M. Harland & Bryan Butler.
MONITOR AND CONTROL EXECUTOR REAL TIME PROGRAM.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 11: Monitoring Server Performance.
11 MONITORING MICROSOFT WINDOWS SERVER 2003 Chapter 3.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 8 Introduction to Printers in a Windows Server 2008 Network.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
Maintaining and Updating Windows Server 2008
Configuring Print Services Lesson 7. Skills Matrix Technology SkillObjective DomainObjective # Deploying a Print ServerConfigure and monitor print services.
Slide 1 of 9 Presenting 24x7 Scheduler The art of computer automation Press PageDown key or click to advance.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
Input/OUTPUT [I/O Module structure].
Enterprise PI - How do I manage all of this? Robert Raesemann J Jacksonville, FL.
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 User Interfaces Rich Moeser.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
Cisco S2 C4 Router Components. Configure a Router You can configure a router from –from the console terminal (a computer connected to the router –through.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
Hichem Ben Frej 5-Dec-2006 EVLA M&C Transition Software CDR CMP: Control Monitor Processor 1 Hichem Ben Frej Kevin Ryan.
June 14, 2004EVLA Software Communications Infrastructure Kevin Ryan 1 EVLA Software Communications Infrastructure.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
Computer Emergency Notification System (CENS)
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Software Status Sonja Vrcic Socorro,
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
ICALEPCS’ GenevaACS in ALMA1 Allen Farris National Radio Astronomy Observatory Lead, ALMA Control System.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
EVLA Monitor & Control Transition System Software
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Introduction to Grids By: Fetahi Z. Wuhib [CSD2004-Team19]
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Configuring Print Services Lesson 7. Print Sharing Print device sharing is another one of the most basic applications for which local area networks were.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
Chapter 4: server services. The Complete Guide to Linux System Administration2 Objectives Configure network interfaces using command- line and graphical.
Software Overview Sonja Vrcic
Bryan Butler EVLA Computing Division Head
Monitor and Control Software
EVLA Overall Software Design
Obs2script Bryan Butler.
Antenna Monitor & Control Subsystem Engineering Requirements
EVLA M/C Software PDR, 14 May 2002
Bryan Butler (for Bill Sahr)
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Operations Software Bryan Butler.
Mark McKinnon EVLA Project Manager
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
Requirements Bryan Butler.
Presentation transcript:

Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Contents Presentation roughly follows the EVLA M&C Software Design document: –Scope of the M&C System –EVLA M&C Components –Transition System & Final System –Lifespan of the Transition System –Carryover from Transition System to Final System –Current State of the Transition System –Architecture & Dataflow –Selected Components

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Definitions The EVLA M & C Transition System Software is the software designed and implemented for the purpose of operating the hybrid array. The hybrid array is the VLA up to that point where it no longer contains either unconverted VLA antennas or the VLA correlator.

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Scope of the M&C System

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Scope of the M&C System The Real-Time Domain  Observation Executor  Antenna Monitor & Control (AMCS)  Correlator Monitor & Control (CMCS) Plus the following from the Online Domain  DCAF (Data Capture & Format)  Telcal (Telescope Calibration)  User Interfaces

Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA M&C Components

Bill SahrEVLA M&C Transition System Software CDR December 5-6, A Transition System and A Final System In broad terms, there will be two major versions of the EVLA Monitor & Control System – a Transition System and a Final System The Transition System bridges the gap between the old Modcomp-based VLA Control System and the final version of the EVLA Monitor & Control System, while maintaining operational capabilities The Transition System will be responsible for controlling a wide variety of old and new hardware – EVLA Antennas, VLA Antennas, the VLA Correlator, and the prototype WIDAR correlator The Transition System will incrementally shift its software architecture toward the desired architecture of the final system

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Lifespan of the Transition System First light on an EVLA antenna – 27Oct 2003 First fringes (EVLA ant 13 with an unmodified VLA antenna) – 24 Mar2004 WIDAR correlator scheduled to be operational – Q VLA correlator retired – a policy decision VLA antennas no longer used – also a policy decision. The last VLA antenna is scheduled to be converted to EVLA electronics in Q Last EVLA receiver installed – Q2 2012

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Carryover of Components Transition System to Final System

Current State of the Transition System 10

Next Step for the Transition System - Modcomps Retired 11

EVLA M&C Transition System: Data Flow & Status 12

Job Submission Normal operations A job is submitted via the SCRIPTS pane of the Array Operator Screen Either a VLA Observe file or a control script can be submitted Observe files are automatically routed through obs2script & converted to control scripts Needed observing parameters are obtained form the Parameters database The Interim Observation Executor directly configures – EVLA antennas – VLA Antennas (soon) – The VLA correlator via the new correlator controller (soon) 13

Hardware Configuration EVLA Antennas - MIBs Simplified diagram of MIB software structure 14

Bill SahrEVLA M&C Transition System Software CDR December 5-6, MIB Hardware & Software EVLA antennas are presented as a collection of modules containing one or more devices, each module implementing the MIB interface MIB interface includes a command port, a data port, and a port used for interactive telnet sessions The final version of an EVLA antenna is expected to contain approximately 30 to 34 MIBs MIB hardware and software were subjected to a critical design review on 20Oct2004

Hardware Configuration VLA Antennas – the CMP MIB IF requests DCS00 DCS28 DCS01 CMP DAEMON HTTP server (Servlet) S h ar e d M e m o r y DCSNN HTTP requests Multicast Alarm, Archive, Screen CMP-LX CMP-VX Tasks VxWorks Kernel CMP Ports and Interfaces 16

Bill SahrEVLA M&C Transition System Software CDR December 5-6, VLA Antennas – the CMP The CMP presents VLA antennas to the EVLA M & C System as virtual antennas implementing the MIB interface The VLA antenna MIB interface includes the same command, data, and telnet ports as the EVLA module MIB interface Uses the same basic “set …” & “get …” command format as is used for EVLA subsystems Interfaces to the VLA Serial Line Controller

Bill SahrEVLA M&C Transition System Software CDR December 5-6, CMP as Deployed

Visibility Data & Archive Records Properly formatted visibility data flows from the array processor into the Visibility Pipe via an ISA bus interface on a card in the new correlator controller The visibility data is transmitted from the Visibility Pipe to IDCAF over an Ethernet connection using TCP/IP IDCAF collects meta-data & alerts via multicast and forms VLA format archive records IDCAF flags the records as needed IDCAF multicasts the archive records and writes them to a staging disk ITelCal obtains the archive records from the staging disk 19

Bill SahrEVLA M&C Transition System Software CDR December 5-6, User Interfaces 01Nov2006 release of EVLA Operator software: –Array Operator Screen –Device Browser –Critical Functions Screen –Screenlets (Panes from the Array Operator Screen - Alerts, Antennas, Scripts, Weather) –Module Screens (ACU, FRM, F317, F320, L301, M302, M303) –Telcal screens (Calibrator Amplitude & Phase, Calibrator Complex Value, Pointing Record, Pointing Offset)

Bill SahrEVLA M&C Transition System Software CDR December 5-6, User Interface Releases Stable builds web page: / Accessible only from within an NRAO domain or via the NRAO VPN

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Array Operator Screen Chief Operator Screen –Scripts pane, including job submission popups –Antennas pane: Az, El, Az Error, El Error, + Icons for Computer Control, DPM, On Source, E-Stop –Thumbwheel scrollable display of the Wye –Message console –Time –Weather –Alerts

Array Operators Screen 23

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Device Browser Low level view of any device implementing the MIB interface Tree of all devices in a MIB (module) Selected device expands to show all monitor and command points Display of all properties and their values for selected monitor or command point Real-time plot of value of selected monitor point Real-time plots of multiple monitor points

Device Browser 25

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Critical Functions Will allow an E-Stop, ACU Reset, Critical Power Reset, Track (DPM), Stow, Park, or Standby command to be sent to any antenna, selected group of antennas, or to the entire array. Depends upon the installation of the M302 module in an antenna

Critical Functions Screen 27

Bill SahrEVLA M&C Transition System Software CDR December 5-6, Module Screens ACU – antenna control unit FRM – focus & rotation module F317 – front end (rcvr) controller F320 – front end transition module L301 – GHz synthesizer M302 – Utility module, includes critical functions M303 – Utility module

A module subsystem screen – the ACU Screen 29