Modification Review Proposal 0166 Review of necessary reform of NTS Offtake Arrangements Thursday 6th September 2007.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

EU 3 rd Package Clarification of points raised at Transmission Workstream 3/12/2009.
Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
1 Review Group 166 Review of necessary reform of NTS Offtake Arrangements Exit reform from an interconnector perspective Avian Egan 20 th September 2007.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
UNC Modification 0050 – Storage Monitor Adjustment.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Proposer: Matthew Hatch Panel Date: 20/10/16
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
EU/GB Charging Project – Delivery Timescales
Transmission Workgroup 6th March 2014
MOD0166 – Reform of the NTS Offtake Arrangements Storage Perspective
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
Flow Swaps at NTS / LDZ offtakes
Review Group /09/2007.
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Consideration of issues raised by UNC Modification Proposal 0244
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism
Information Provision for Transitional Exit Capacity
Review Group 221: Review of Questions from Session 2
195AV “Future work” – system flexibility
Presentation transcript:

Modification Review Proposal 0166 Review of necessary reform of NTS Offtake Arrangements Thursday 6th September 2007

Agenda for First Meeting Confirm Terms of Reference Identification of tasks to be undertaken Programme of work and timetable for proposals Any Other Issues/Business

Terms of Reference Any proposed amendments to Draft ToR published Recommendation to Modification Panel to confirm ToR

Identification of Tasks to be undertaken From Review Proposal:- Arrangements for User Commitment by NTS Connectees for acquiring incremental capacity and capacity surrender. Arrangements for the management and monitoring of linepack depletion (Flexibility) and particularly on this point; as there is not currently any scarcity of this nature, to identify the likelihood and timescale of such a scarcity occuring. Arrangements for Interruption for NTS Connectees.

User Commitment Extent of User Commitment required n years capacity charge 50% project cost Duration of User Commitment required 1 year (ARCA) 4 years (0116V etc.) Staged User Commitment in line with project development and investment Identical process for incremental and new connections? Potential impact of Under/Over recovery (TO Commodity)

Management and monitoring of linepack depletion What is being measured? Linepack depletion Flexibility Is 16/24 fit for purpose in demonstrating stress on system? Mechanisms for measurement and reporting Analysis of observation Trigger for consideration of further measures

Arrangements for Interruption Universal Firm on NTS? Long-Term Interruptible contracts EU obligation satisfied? How much Interruption is required by NGG? Mechanism for allocation of necessary interruption Buy-back Parallel to Modification 0090

Programme of work Addressing each of the issues Whole RG in sequence? Sub-group per issue? Frequency of meetings of Review Group Twice per month (1st and 3rd Thursdays)? Should any Modification Proposals be required:- Implemented by end Q1/08 Raised by end Q4/07

Any Other Issues/Business ?