UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

DPA and Gas Production from Protons on W and Be Brian Hartsell.
UCN Beamline Shielding, Target & Remote-Handling UCN CDR (Sept/2010) L.Lee.
Run Plan Document E04-007: Threshold Pion Production.
Tony Gabriel University of Tennessee April 19, 2013
EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
A Muon Veto for the Ultra-Cold Neutron Asymmetry Experiment Vince Bagnulo LANL Symposium 2006 Outline ● UCNA Experiment ● Muon background ● Proposed Veto.
A Muon Veto for the Ultra Cold Neutron Asymmetry Experiment Vince Bagnulo with Dr. Jeff Martin Electrons Ultra Cold Neutrons Cosmic Ray Muons Protons Pions.
The Beta-Asymmetry in Neutron Decay Jeffery W. Martin W. K. Kellogg Radiation Laboratory, California Institute of Technology, Pasadena, CA for the.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
MC/NF TARGET SHIELDING STUDIES. NICHOLAS SOUCHLAS (10/29/2010)‏ 1.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
KT McDonald Target Studies Meeting June 14, Mechanical Issues for the Target System K. McDonald Princeton U. (June 14, 2011) Target Studies Meeting.
Accurate  Spectroscopy for Ultracold Neutrons Jeff Martin University of Winnipeg See also: J.W. Martin et al, Phys. Rev. C (2006) J.W. Martin.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
MCTF C. Johnstone MUTAC Meeting 8-10 April Debut of the MTA beamline Description, status and commissioning plans.
Mitglied der Helmholtz-Gemeinschaft Petersburg Nuclear Physics Institute, Russia Storage cells for internal experiments with Atomic Beam Source at the.
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
20to2T5m100cm Images Van Graves February 13, 2014.
BL1U at TRIUMF UCN Beamline Spallation Target & Remote-Handling System (Aug/2010) L.Lee.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
Separate production cell. Geometry and dimensions If the filling time is much shorter then the accumulation time then maximum of UCN density in the measurement.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Precision measurement of the neutron β-asymmetry A with spin-polarized ultracold neutrons B.W. Filippone, K.P. Hickerson, T.M. Ito, J. Liu, J.W. Martin,
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
Linac Status June 16, 2015 Time Meeting D. Raparia.
1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee.
COMPASS polarized target for Drell-Yan Michael Pesek Charles University in Prague On behalf of COMPASS PT group PSPT, Charlottesville, Virginia
N_TOF spallation target upgrade Discussion with d’Huart Industrie 24 th September 2015 M. Calviani, A. Perillo-Marcone, S. Sgobba for the n_TOF target.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Kinetic Energy Spectra of pi +, pi -, mu +, mu - and sum of all from the 20to4T5m Configuration X. Ding Front End Meeting June 23,
The Polarized Internal Target at ANKE: First Results Kirill Grigoryev Institut für Kernphysik, Forschungszentrum Jülich PhD student from Petersburg Nuclear.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
The Science Program at the Los Alamos Ultra-cold Neutron Source Alexander Saunders Los Alamos National Lab 3 rd PSI Workshop Sep LA-UR
The IsoDAR Target at KamLAND for NBI2014 and now for something completely different… L. Bartoszek BARTOSZEK ENGINEERING With contributions from the DAEdALUS/IsoDAR.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
Christos Lamboudis HEP April. Athens Study of MDT response to neutrons and possible ageing effects Do we really need to worry about neutrons? Do.
Prompt dose upstream the 12-ft concrete shielding blocks Igor Rakhno May 4, 2007.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Nuclear Physics LOS ALAMOS NATIONAL LABORATORY 1 Line B preparations Hardware issues Install Fast Kicker (up to 200  C/sec). Reinstall Line B transport.
FHI experimental opportunities? FHI meeting 17/9/14.
TRIUMF plans: Discussion Points 1.What is this group's opinion of the TRIUMF technique? (Spallation+He-II) 2.Are there developments around the world on.
Positron production rate vs incident electron beam energy for a tungsten target
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
Improvement of beam current in KIRAMS-13 using upgrade of
Spectrometer Magnetic Field for Neutron Beta Decay at the SNS
R. Young, M. Makela, G. Muhrer, C. Morris, A. Saunders
Additional Upstream Coil Shielding
Polarized Internal Gas Target in a Strong Toroidal Magnetic Field
neutron lifetime experiments
Additional Upstream Coil Shielding
MERIT Beam Collimator Design
Presentation transcript:

UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current is 4 uA. Source is designed to take 10 uA time-averaged. Spallation target is tungsten, 2cm diameter, 10 cm long. Cooling of spallation target achieved by flowing compressed He gas. The length of the red “beta spectrometer” at bottom center of next slide is about 5.5 m long Shielding is 9’ of steel and 6’ of concrete. People can walk around area when beam is on (provided shielding is all in place) Remote extraction handled by removing one shield block, then pulling out a package from custom-made block. (see picture) Thanks to M. Makela and A. Saunders from LANL for providing the numbers

Layout in Area B 800 MeV protons UCN Source beta- spectrometer polarizer magnet

proton beam direction shield package UCN port remote extraction

UCN to expt “prepolarizer” magnet polarizer magnet beta-spectrometer magnet UCN guide insertion future UCN guide path Status