1 Long Range Decision Support System - Design Overview - Institutional Knowledge -Issues unresolved Transport Modeling & Software Development 8 th April.

Slides:



Advertisements
Similar presentations
Network II.5 simulator ..
Advertisements

Use GIS-T to Synchronize Land and Infrastructure Development Principle Investigator: Yingling Fan Humphrey Institute of Public Affairs Co-Investigator:
A Decision Support System for Improving Railway Line Capacity G Raghuram VV Rao Indian Institute of Management, Ahmedabad.
Capacity Studies on Transportation Network Presented by Rakesh Ambre ( ) Under Guidance Of Prof. Narayan Rangaraj.
Logistics Network Configuration
Blue print for throughput enhancement on HDN B.V.L.Narayana SPTM/ RSC/ BRC.
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
GEOG 111 & 211A Transportation Planning Traffic Assignment.
SimWalk PRO – Pedestrian simulation software for urban planning, evacuation and traffic management Savannah Simulations AG / 2010.
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Chapter 4 1 Chapter 4. Modeling Transportation Demand and Supply 1.List the four steps of transportation demand analysis 2.List the four steps of travel.
Traffic Engineering With Traditional IP Routing Protocols
Agenda Overview Why TransCAD Challenges/tips Initiatives Applications.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Customized Simulation Modeling Using PARAMICS Application Programming Interface Henry Liu, Lianyu Chu & Will Recker.
Strategic Project Alignment With Team Expert Choice
Working With Databases. Questions to Answer about a Database System What functions the marketing database is expected to perform? What is the initial.
Shipper/Carrier Network Strategies. Purpose of Network Strategies Shipper Strategy –Purchase/Manage transportation services to meet customers’ needs Carrier.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Decision for the location of Intermodal terminals in a rail-road network Anupam Kulshreshtha IIM - Lucknow.
1 Freight Operations Information System COM/CCM’s Conference
Rail Related Research at IIT Madras
Source: NHI course on Travel Demand Forecasting (152054A) Session 10 Traffic (Trip) Assignment Trip Generation Trip Distribution Transit Estimation & Mode.
An inland rail route between Melbourne and Brisbane? The North-South rail corridor study 14 June 2007 BTRE Transport Colloquium.
Project Planning and Capital Budgeting
TRANSPORTATION MANAGEMENT
SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process A Web Presentation to the Technical.
Transportation Infrastructure
Capacity analysis of complex materials handling systems.
MODULE -7 IT IN THE SUPPLY CHAIN
Florida Multimodal Statewide Freight Model
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
Some network flow problems in urban road networks Michael Zhang Civil and Environmental Engineering University of California Davis.
Dark Light Dark Light Accent Accent Accent Accent
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
Bangkok September, Economic Integration 2 Bangkok September, 2012.
Transportation leadership you can trust. presented to FHWA “Talking Freight” Seminar Series presented by Lance Neumann Cambridge Systematics, Inc. August.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
KIT – University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association INSTITUTE FOR ECONOMIC POLICY RESEARCH (IWW),
Logistics McGraw-Hill/Irwin
Overview Freight Modeling Overview Tianjia Tang, PE., Ph.D FHWA, Office of Freight Management and Operations Phone:
Getting to Know Cube.
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
An ENIF Image Is Worth A Thousand Lines of EMME/2 Output By Steve Hayto, PEng, S5 Services Carlos M Perez, PEng, Delcan Corporation 19 th Annual International.
Integrated Travel Demand Model Challenges and Successes Tim Padgett, P.E., Kimley-Horn Scott Thomson, P.E., KYTC Saleem Salameh, Ph.D., P.E., KYOVA IPC.
Exploring Cube Base and Cube Voyager. Exploring Cube Base and Cube Voyager Use Cube Base and Cube Voyager to develop data, run scenarios, and examine.
FDOT Transit Office Modeling Initiatives The Transit Office has undertaken a number of initiatives in collaboration with the Systems Planning Office and.
FINANCE MODULE. The various subsystems Financial Accounting Investment management Controlling Treasury Enterprise controlling.
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
Strategic Planning of National/Regional Freight Transportation Systems : An Analysis TG Crainic, J Damay, M Gendreau, R Namboothiri June 15, 2009.
IT Applications for Decision Making. Operations Research Initiated in England during the world war II Make scientifically based decisions regarding the.
 An Information System (IS) is a collection of interrelated components that collect, process, store, and provide as output the information needed to.
Capacity Planning Pertemuan 04
3-1 Chapter 3: Network Planning CMB 8050 Matthew J. Liberatore.
Travel Demand Forecasting: Traffic Assignment CE331 Transportation Engineering.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
METRO Dynamic Traffic Assignment in Action COST Presentation ODOT Region 4 April 1,
IE 8580 Module 2: Transportation in the Supply Chain
Chapter 9 Optimizing Network Performance
LOGISTICS NETWORK.
A Modeling Framework for Flight Schedule Planning
Chapter 4. Modeling Transportation Demand and Supply
World-Views of Simulation
Stevenson 5 Capacity Planning.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Overview of Intermodal (Multimodal) Supply Chain Optimization and Logistics Scott J. Mason, Ph.D. Fluor Endowed Chair in Supply Chain Optimization and.
Presentation transcript:

1 Long Range Decision Support System - Design Overview - Institutional Knowledge -Issues unresolved Transport Modeling & Software Development 8 th April 2005 Bharat Salhotra

2 Transportation & IR Key Facets –Network Industry System wide view is critical –Diversity of Traffic / Operations Capacity Implications –Dynamic Need for databases to be updated –Large # of Interrelated variables

3 ANSWERING QUESTIONS IN SEQUENTIAL ORDER IS NOT POSSIBLE DUE TO INTERDEPENDENCIES Interdependent variables of network planning Solution: Develop a DSS with three objectives Model interdependencies at micro levels Generalize interdependencies at Macro Level Assess bundle of Investments based on environment Traffic /Train Mix Train speed differential Capacity of network Introduction of high-speed trains # of yards/ traction change points Network quality Throughput Complexity in Route structure of freight trains Quality Standards for freight traffic/ passenger traffic Capacity increase of marshalling yards # of stops for passenger trains Deterioration of infrastructure Types of Locos/Wagons Market Demand

4 System Optimization vs. Subsystem Optimization

5 Need for LRDSS Provides important desktop information for planners / decision-makers for: –Investment planning/project screening –Market analysis –Financial impact analysis –Funds Requirement

6 LRDSS: Salient Features Integrative Character : –Interdisciplinary –System wide Analysis –Simultaneous /Sequential Analysis Improvements in Technology/ Operating Policy Commodity Flows Routing Plans

7 LRDSS: Salient Features Customized GIS Interface –Integration of different data by location –Evaluate alternative routes –Exhibit pattern of traffic flows Strong Decision Support –Prioritize Investments –Position Services to optimize market share. –Analyze Funds required by key year

8 LRDSS : Salient Features Strong Decision Support –Strategic Level Tool –“What-if” Analysis (“With/Without”) –“Sensitivity” Analysis –Information based & Data Driven. –Iterative Evaluation –Modular Design

9 LRDSS for Decision Support PLANNING PROCESS Models to support different time horizons Five Year Plans Strategic Level Annual Plans Integrated LRDSS... BCAM DAF, FPM FPM

10 Broad Structure of Model Traffic Assignment Market Analysis Traffic Forecasting Cost Benefit Analysis Supply Analysis Demand Analysis Financial Forecasting Facility Performance

11

12 Facility Performance LINKS TERMINALS SUPPLY SIDE + NETWORK

13 Rail Performance Model Determine ability to carry traffic LINK TYPE TRAIN TYPE Cost Curve SPEED & COST CALCULATOR TRAFFIC OPERATING RULE Speed Curve

14

15 RAILS Overview Two Modules : –Train Performance Calculator (TPC) –Train Dispatch Simulator (TDS) TPC : –Single Train running on a section –Level of interference = 0 –Running determined by track profile and train

16 Train Performance Calculator –Uses empirical formulae –Follows TE/Speed Curve, braking curves of locomotives –Rolling resistance of coaches –Train resistance, grade resistance, air resistance based on Davis Co-efficient –Train treated as a series of points

17 Train Performance Calculator TRAIN PERFORMANCE CALCULATOR TRACK PROFILE TRAIN PROFILE LOCOMOTIVE COACH WAGON RUN TIMES Fuel Consumption Speed Profile

18 TPC Output (Track Profile)

19 Train Performance

20 TRAIN DESPATCH SIMULATOR Scenario Train Types File Station File Run Times File Schedule File Special Events File Track File Set of Trains Parameter File Simulation results

21 Train Dispatch Simulator Simulates actual train operations –Dispatches trains to resolve conflicts –Allocates resources dynamically –Non priority based, route seeking dispatch –Non Optimizing algorithm

22

23 Train Dispatch Simulator Event based Useful for analyzing alternative line configurations –location of LOOPS, CROSSINGS Establishment of Train schedules –departure/arrival/halts of trains Examination of Capacity Issues –Identification of Conflicts –Meets and Overtakes

24 Simulation Calibration: Within 5% of actual situation on field. Congestion & Capacity Modeling –Traffic increased incrementally to obtain Congestion Graphs Estimated Line Capacity Scenario Analysis: Impact of failures Horsepower to Trailing Load ratios Passenger Train Halts

25 Output from FPM Simulation results of 17 links –transit times & congestion curves by train type & Link Type –impact of failures (track, signaling, wagons) –capacity based on simulation (not charting) Cost Data –working expenses by train type

26 CONVERSION INTO COST FUNCTION

27

28 Market Analysis and Traffic Forecast DEMAND SIDE MODELING

29 Mode Share: Key Determinants (from SURVEY) Volumes High volumes (>1 lakh TPA) = high rail share if few destinations Channel Structure Flat distribution channels, bulk buyers favor rail movement. Flow rate Raw materials Production line Finished goods Consumption Center. Lead length Long lead traffic favors Rail Business Service Requirements JIT,Reduced Order Quantity, Reliability Single to multiple suppliers

30 Key Factors to Success Core Factors –Reliability, Availability, Price and Transit Time Desirable Factors –Connectivity, Product Suitability, Loss/Damage, Customer Information –Adaptability, Customer Friendliness, Negotiability, Access to Decision Makers –Ease of Payment & Claim Processing Time

31 Market Share Analysis

32 Traffic Forecasting Module Objectives: –Determine Production & Consumption Functions by Commodity for TAZs –Forecast Origin Destination Flows by Commodity Key Years ( & ) –Identify high growth areas loading unloading terminals Origin Destination Routes

33 Traffic Analysis Zones

34 Methodology Different models used for different commodities –GAMS Linear Programming Model Assigns traffic by minimizing transportation cost. –“Furness” Trip Generation Model Generates OD flows based on movement pattern in the base year –Factoring OD flows are projected based on growth rates.

35

36 Traffic Assignment Module DEMAND + SUPPLY MODELING

37 Traffic Assignment Module Operation Research based Freight Network Equilibrium Model. Objective function: Minimize total cost of carrying traffic – Assign OD flows on paths using least impedance. (= Σ congestion cost on links/nodes ) –Each path consists of series of links and nodes. –Path Cost = aggregated cost of traffic movement over each link and node.

38 Traffic Assignment Module Basic Inputs to the Model: –I : Demand Side Existing and Future Traffic –Commodity wise flows between pairs of points –Traffic for 2001’02, 2006-’07, 2011-’12 –II: Supply Side Existing and Future Network –Sections as well as their Cost Characteristics –Stations as well as their Cost Characteristics

39 Network Databases Two distinct database representing IR network –Railline Database –Railnode database 1796 links & 1531 nodes for base case Nodes Database contains information like TAZ, Transshipment point, Rail terminal/yard, Traction change point, reversal etc.

40 Attributes of a Section

41 Methodology for Assignment Base Year: Assignment on Preferred Paths Future Years: –Assignment on both Preferred & Shortest Paths –Assignment with committed works Sequential/Simultaneous

42 Analysis of TAM Results Outputs –Commodity wise traffic on each link. –ODs that use a particular link. –Lowest Cost Route path between pairs of points. –Utilization of each Traction Point. These reports can be compared for alternative scenarios.

43

44

45 Variables Handled Data Size & Spread –900 * 900 * 10 OD matrix elements –15,000 Rail Paths Each Path has average of 50 links –Each link has commodity wise congestion function –3 sets of data, by key year

46 TAM-Conceptual design Replicate Shipper’s Behavior –What commodity from where to where? Replicate Carriers Behavior –What commodity, what route, what train type Non Linear Programming Optimization Solver –MINOS

47 Sub Modules of TAM Network Processor –create a logical multi modal network access /egress links, transshipment links, traction change points, nodes –Output consists of Forward star data structure to be used as input to k path algorithm Path generator (K-Short) –creates shortest paths between two O-D Pairs –Input to Solver

48 Carrier Input Processor –Generates MINOS input file –Represents full specifications of carrier model with unit costs specified as a ‘real valued’ function of path flows (non linear) Post processor –Interprets MINOS solution file. –Interfaces with GIS –Query based GIS interface allows graphical display of bottleneck links, flows etc. Sub Modules of TAM

49 GIS & LRDSS Avenue based Path Editor used to check paths generated by “kshort” algorithm transshipments, traction change, reversals create new paths via certain given stations User Interface to facilitate Data Analysis through –Data browser –Query Builder –Chart generator

50 Path Editor to display/define routes

51 Path Editor

52

53 Cost Benefit Analysis & Investment Planning

54 Utility of LRDSS LRDSS is a powerful tool for enabling a pre-feasibility analysis. Results are only indicative –micro modeling to gauge impact of specific investment/policy initiatives. –availability of financial resources needs to be matched with priority of projects.

55 Phase III Strengthen existing model with –Terminal Analysis –Multi-Modal Traffic Analysis –Benchmarking Operations Improve Information availability on desktop of decision-makers Interconnect

56 Terminal Analysis Module –Objective Develop a better understanding of terminal operations Use Process modeling to estimate detentions and impact of such detentions Evaluate investment options to minimize detentions and improve efficiency at terminals –Simulation Model instead of a Numerical Model

57 Stylized Diagrams Terminal representation using six standard features –Entry Exit Points –Support Yards –Customer Sidings –Platforms –Intersections –Connections

58 Facilities Database Associated with a Facility are 3 types of fields Time related fields Capacity related fields Resource related fields E.g. a support yard would have fields specifying Examination Time (Average, Minimum, Maximum) Shunting Engine Attach/Detach TimeTIME “Waiting for Train Engine” TimeTIME Number of TracksCAPACITY Number of examination gangs RESOURCE

59 Trains Database –Brain Train Trains have an ID, type and commodity associated Arrival Day and Time Predefined Route assigned to the train –Route Descriptions START at ENTRY POINT Sequence of FACILITIES a train has to USE Quantum of RESOURCE & TIME required END at EXIT point

60

61TKD

62 Simulation Terminal Process model simulates –Movement of trains on routes through Terminal –Delays of trains due to limited resources –Delays due to crew change –Loading/unloading at customer siding –Interaction with passenger trains sharing facilities with goods trains –Disruptions at facilities User Interface

63 Model Outputs Train delays (process times and non- process times) by train Assignment of delay to –facility –resource Activity summary of utilization of all of the facilities and resources, including time spent in examination, loading/unloading track usage Feed investment analysis

64 Traffic Growth Rate by Commodity & OD Freight Flows in Corridor Mode Split Model Target Year Total Flows Qualitative Preference data Target Year Rail Container Flows Operational Statistics Infrastructure Requirements Cost Benefit Analysis Multimodal Corridor Analysis Model

65 Mode Split Model Parameters –Price –Transit Time –Service Quality Index (Reliability, Availability, Frequency, Loss & Damage) –Product Suitability Form –Cobb Douglas

66 Multimodal Corridor Analysis Model –Estimate Total Traffic –Estimate Operational Requirements (Throughput, Trains, Lifts etc.) –Estimate Capital Requirements (Infrastructure, Rolling Stock, Equipment) –Estimate Cash Flows –Calculate IRR

67 Resource Requirements Terminal Resources –Land –Rail Lines –Equipment (stackers, trailers, gantry cranes) –Gates –C&W Rolling Stock

68 Scenario Analysis Assess different Investment alternatives –Do minimum (only soft changes) –De-Bottlenecking –Full Fledged Corridor Assess Pricing Strategies Assess Impact of Service Levels

69 Interconnect-LRDSS & Other IR Databases MIS (annual summaries e.g. Traffic) FOIS (annual summaries e.g. op. stats) Planning Data (Project Data) Engineering Data (Improvements and Unit Costs) Railway Board/ LRDSS Databases (Scenario Data) Financial Data (e.g. budgets) Zonal Railway Data (Line and Section Data)

70

71

72

73 KEY AREAS FOR COLLABORATION LINE CAPACITY SIMULATOR TRAFFIC ASSIGNMENT MODEL –PATH GENERATOR –OPTIMIZATION ALGORITHM PASSENGER TERMINAL DESIGN

74 THANK YOU