20 Feb. 2001 LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.

Slides:



Advertisements
Similar presentations
ALICE TOF FESTIVAL Offline tools and GRID scenario for the ALICE TOF detector A. De Caro (University of Salerno and INFN) CERN – Bdg.29, October 20 th.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon.
Inefficiencies in the feet region 40 GeV muons selection efficiency   Barrel – End Cap transition 10th International Conference on Advanced Technology.
27 Oct. 2000TGC Simulation video meeting1 Trigger Simulation Hisaya Kurashige KOBE Univ.
Current status of LVL1 Muon-Endcap Trigger simulation Tadashi MAENO ( CERN ) for the developers of TGC simulation code TDAQ-week in LISBON ( 23th Oct.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
8th Workshop on Electronics for LHC Experiment, Colmar, France, 10 Sep R.Ichimiya, ATLAS Japan 1 Sector Logic Implementation for the ATLAS Endcap.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Neutron Background Simulation R. Wilkinson. 2 Neutron Background Simulation Long-lived neutrons created, diffuse around collision hall They get captured.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Trigger processor John Huth Harvard. NSW + TGC of BW’s track fitting track position (R,  ) d  : deviation of incidence angle from infinite pT muons.
BESIII MC Release notes & planned development Dengzy, Hem, Liuhm, Youzy, Yuany Nov. 23, 2005.
MOORE MOORE (Muon Object Oriented REconstruction) Track reconstruction in the Muon Spectrometer MuonIdentification MuonIdentification Reconstruction and.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
Muon Trigger Slice Report Sergio Grancagnolo for the Muon Trigger group INFN-University of Lecce CERN Jan 23, 2007.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Hi-pT Board Hi-pT ASIC Board Type Endcap-wire Endcap-Strip Forward Chikara Fukunaga (TMU)
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
Status of BESIII Event Reconstruction System Zepu Mao IHEP BESIII Annual Meeting 2005/05/29.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
/MuID status report on behalf of the Moore/MuID group. Status in the releases ( Units Migrations DC1/G3 MuonGeoModel Migration DC2/G4) MuID updates Trig.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
GAUDI Muon Software  Algorithms : Muon Digitization MuonL0Trigger MuonIdentification  Detector Description Database  Transient Detector Store  Detector.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
Design Studies of the ATLAS Muon Level-1 Trigger based on the MDT Detector for the LHC Upgrade O.Sasaki, Y.Suzuki, K.Nagano, M.Ishino, M.Ikeno (KEK), K.Bendtz,
CBM Simulation Walter F.J. Müller, GSI CBM Simulation Week, May 10-14, 2004 Tasks and Concepts.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Claudio Grandi INFN-Bologna CHEP 2000Abstract B 029 Object Oriented simulation of the Level 1 Trigger system of a CMS muon chamber Claudio Grandi INFN-Bologna.
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
S t a t u s a n d u pd a t e s Gabriella Cataldi (INFN Lecce) & the group Moore … in the H8 test-beam … in the HLT(Pesa environment) … work in progress.
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
Status of the ATLAS first-level Central Trigger and the Muon Barrel Trigger and First Results from Cosmic-Ray Data David Berge (CERN-PH) for the ATLAS.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
1 OO Muon Reconstruction in ATLAS Michela Biglietti Univ. of Naples INFN/Naples Atlas offline software MuonSpectrometer reconstruction (Moore) Atlas combined.
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
BESIII offline software group Status of BESIII Event Reconstruction System.
1 Plans for the Muon Trigger CSC Note. 2 Muon Trigger CSC Studies General performance studies and trigger rate evalution for the full slice Evaluation.
Object-Oriented Track Reconstruction in the PHENIX Detector at RHIC Outline The PHENIX Detector Tracking in PHENIX Overview Algorithms Object-Oriented.
FTK high level simulation & the physics case The FTK simulation problem G. Volpi Laboratori Nazionali Frascati, CERN Associate FP07 MC Fellow.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Sector logic firmware and G-link Merger board designs
Japan Participation in Phase-II TDAQ Upgrade
CMS EMU TRIGGER ELECTRONICS
OO Muon Reconstruction in ATLAS
Silicon Tracking with GENFIT
STAR Detector Event selection and triggers Corrections to data
MOORE (Muon Object Oriented REconstruction) MuonIdentification
Muon Group Software Report
MUC simulation and reconstruction
BES III Software: Short-term Plan ( )
Presentation transcript:

20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.

20 Feb. 2001LVL1 muon trigger simulation meeting2 Objective Simulate 1st level Trigger using TGC As a part of MC production in ATLAS to evaluate Trigger Performance to filter events  On the frame of Athena For design of Trigger electronics to evaluate Implementation of logic to study Timing calibration and Diagnosis procedures  Stand-alone environment

20 Feb. 2001LVL1 muon trigger simulation meeting3 TGC Level-1 simulation Input (same as current DICE) Hit information of TGC chambers Chamber number Hit Position/Time Momentum information of incoming particles Output Raw Data Hit pattern of chambers Trigger Information RoI information to MUCTPI Test vectors at each stage of trigger logic

20 Feb. 2001LVL1 muon trigger simulation meeting4 Schematic

20 Feb. 2001LVL1 muon trigger simulation meeting5 Design policy Detailed trigger simulation based on real electronics design Can describe logic according to real implementation of ASIC Can describe individual module Can describe connection between modules Can treat multi-bunch simulation

20 Feb. 2001LVL1 muon trigger simulation meeting6 Design Electronics System “ Main ” class (management) Database Keep information of connection between modules ASD/Digi Detector simulation outputs Sector Trigger simulator

20 Feb. 2001LVL1 muon trigger simulation meeting7 Class: Database Information used in simulation Cable Connection Table ASD --> PP PP --> SB SB --> HPt HPt --> Sector Logic Connection on PC board PP Coincidence map Mask information

20 Feb. 2001LVL1 muon trigger simulation meeting8 Class: Sector Simulate a trigger sector Describe trigger logics Consisits of PP, SB, HPt, and SL Timing manager controles multi-bunch signals

20 Feb. 2001LVL1 muon trigger simulation meeting9 Class: Slave Board Simulate a SB

20 Feb. 2001LVL1 muon trigger simulation meeting10 Current Status -1 Prototype Code was finished on Mar ’ 00 Simulate  R,  in a High Pt Board for muon tracks These are very preliminary results and we found some bugs exist  R,  in a High Pt Board for muon tracks

20 Feb. 2001LVL1 muon trigger simulation meeting11 Current Status -2 Comparison of simulation results with Yoji ’ s results starts But, there are some problems Geometry in DICE is different from the final one We have changed TGC numbering scheme (sector No, chamber No etc.) for production/electronics/simulation from one used in DICE.

20 Feb. 2001LVL1 muon trigger simulation meeting12 Migration on ATHENA/PESA scheme Trigger Simulation is a “ algorithm ” in ATHENA framework Framework Change 1. Use TDS (Transient Data Storage) for Digitizer input (DICE Hit output equivalent) Digitizer output (RAW data equivalent) Trigger output (MUCTPI input equivalent) Test Vectors 2. Create/Use Detector Data Service For both trigger and detector simulation Geometry Connection Table