Earned Value Management made Simple Keith Lee, SAP Systems Integration America Jay Wilson, SAP Labs Session 3802 Monday May 19, 2003 11:20 AM to 12:50.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
Module 8: Government Required Reports
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
Copyright © 2003 Americas’ SAP Users’ Group Custom Archiving 101 Session Code 108 Karin Tillotson Sr. Basis Administrator Tuesday, May 20 th, 2003.
Project Systems & BW Out of the Box Session xxxx Gerald B. Steele, SAP America, Inc.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Monitoring and Controlling
Gantt Charts Trisha Cummings. The History Henry Laurence Gantt's legacy to management is the Gantt chart. Henry Laurence Gantt ( ) was a mechanical.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Chapter 10 Project Monitoring and Control
Project Evaluation and Control
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Eleanor Haupt Aeronautical Systems Center Lloyd Carter
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
Managing Project Through Information System.  Monitoring is collecting, recording, and reporting information concerning any and all aspects of project.
Earned Value JOEL VIRAY TOPICS What is Earned Value Management? –Why do I need it? –How do I do it? Earned Value Reporting Earned.
Earned Value Management Tutorial Module 5: EVMS Concepts and Methods Prepared by:
Chapter 15 Cost Control.
Microsoft Project Association Building an EV System using MS Project (and Excel) Kirsty C. McLean, MBA, PMP Project Controller, Photonics Division General.
9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
1 Alternative EVM Applications Not a One-Size-Fits-All.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Project Cost Management
Brookhaven Science Associates U.S. Department of Energy Facility Managers Meeting DOE-OECM Certification of Earned Value Management Systems April 27-28,
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Chapter 7: Project Cost Management
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Felix Sanchez and Don Cole
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
TOPIC-8B- PROJECT COST CONTROL
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Earned Value Management
Earned Value Management
Dave Bachman DAU / CDSC September 9, 2004
Linac Coherent Light Source (LCLS)
Presentation transcript:

Earned Value Management made Simple Keith Lee, SAP Systems Integration America Jay Wilson, SAP Labs Session 3802 Monday May 19, :20 AM to 12:50 PM Content Area: Project Systems

Objectives Understand Basics of Earned Value Management Systems (EVMS) Understand SAP/R3 approach to EVMS Learn Simple steps to configure EVMS in SAP/R3 Become Aware of Options to approaching EVMS in SAP/R3

Earned Value Management is the analysis of work completed compared compared to the amount of work planned and the cost of the work. Simple example: The task is creating a 10 foot Wall and takes $1000 (material and labor) 1. Prepare Ground – 10% 2. Pour Concrete Base – 20% 3. Every foot of wall – 7% In this example, when completed with the first 2 steps and 3 feet of wall the amount of work complete is 30% + 21% = $510. What is Earned Value?

There are lots of ways to measure Earned Value. The wall example uses a combination of milestones (first 2 steps) and counts (feet of wall) The simplest approach is to use “estimate”. I am 70% complete because I say so.

Why use EVMS? Given: –total budget of $1000 –5 months effort –produce 10’ brick wall Status: –spent to date: $700 –time elapsed: 4 months –Wall in process How are you doing, and how do you know how you are doing? How far along are you? (75%, 50%, >40%) Life without EVMS

Why use EVMS? Early and accurate identification of trends and problems Accurate picture of contract status –cost, schedule, and technical Basis for course correction Supports mutual goals of contractor and customer –bring project in on schedule and cost

Five Basic Elements

A Spectrum of Implementation Where When Core EV Principles ANSI/EIA (32 criteria) Tailored Applications Small Companies Larger Companies Major Defense Contractors as desired Government Organic Reports Foreign Countries streamlined, no paper? corporate policy, “enterprise wide” DoD Non-Major Contracts (>12 months) <$6M*>$6M DoD Major Contracts >$70M RDT&E >$300M Prod tailored to needs C/SSR CPR FFP contracts? Commercial or Defense

SAP Approach to EVMS Integrated with all financials and schedule.

SAP Approach to EVMS Calculate both BCWS and BCWP based on a “Baseline” cost Plan using an Earned Value Method.

SAP Approach to EVMS Calculate ALL elements of cost for an object using the same percentage

CONFIGURATION Statistical Key Figures (SKF’s) –Use SKF’s to store the planned and actual percent complete Versions – Baseline, Progress, EAC, … EV Methods –Methods can be tailored and named to suite the client EV Cost Elements –Create cost elements that summarize the planned cost elements into groups (ex: Engineering labor, Manufacturing Labor, Materials, G&A, …) Value Categories –Make Value categories consistent with the EV cost elements for ease of reporting

3 different SKF’s are required Aggrigated – Summary of all percents up the structure based on weighting Non-Aggrigated – the individual object’s percent complete Results Analysis – Percent complete used in results analysis (revenue recognition based on EV) SKF Configuration

Version Configuration

EV Methods Configuration

EV Cost Elements

Value Categories Cost Element group should contain All normal cost elements AND The earned value cost element This is the same cost element group as associated with the EV cost element

A Simple Example With these few basic configuration settings it is now possible to do Earned Value. Now let’s see a simple example –A project with 1 network activity that is 40% complete –Run EV using CNE1 (Calculate Progress) –See the results

Project Example

Calculate Earned Value

Report

40% of BCWS Report What is the good news? What is the bad news?

Questions

Thank you for attending! Please remember to complete and return your evaluation form following this session. Session Code: 3802 Keith Lee – Jay Wilson –