Current status of LVL1 Muon-Endcap Trigger simulation Tadashi MAENO ( CERN ) for the developers of TGC simulation code TDAQ-week in LISBON ( 23th Oct.

Slides:



Advertisements
Similar presentations
GCT Software ESR - 10th May 2006 Jim Brooke. Jim Brooke, 10 th May 2006 HAL/CAEN Overview GCT Driver GCT GUI Trigger Supervisor Config DB Test scripts.
Advertisements

Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
TRT LAr Tilecal MDT-RPC BOS Pixels&SCT 1 The Atlas combined testbeam Thijs Cornelissen, NIKHEF Jamboree, Nijmegen, December 2004.
27 Oct. 2000TGC Simulation video meeting1 Trigger Simulation Hisaya Kurashige KOBE Univ.
Report from the Muon Trigger WG Aleandro Nisati On behalf of the Muon Trigger Slice Community Muon Week, April 18° 2007.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
Stefania.Spagnolo, Dip. Fisica, Univ. Lecce CERN, Nov. 2006, ATLAS Trigger and Physics week Muon Event Filter Stefania Spagnolo Dip. Fisica, Univ. Lecce.
RBX Integration Review Dec 18, Readout Integration Lab 5 Jim Freeman Overview Dec 18, 2001.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
RPC timing in simulation Current Situation MC Geant4 RPCSensitiveDetector.cxx Or RPCSensitiveDetectorCosmics.cxx RPC_Digitization RPC_digit_To_RDO RPC_RDO_To_Prep:
Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
The Pixel Detector ByteStream Converter M.Cobal (1), L. Santi (2) (1) University of Udine and INFN Trieste, Italy (2) University of Trieste and INFN Trieste,
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
MOORE MOORE (Muon Object Oriented REconstruction) Track reconstruction in the Muon Spectrometer MuonIdentification MuonIdentification Reconstruction and.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
HEP 2005 WorkShop, Thessaloniki April, 21 st – 24 th 2005 Efstathios (Stathis) Stefanidis Studies on the High.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
To make ByteStream Data There is a plan that the High Level Trigger (HLT) software uses the offline framework (Athena). HLT group wants to read in ByteStream.
24/06/03 ATLAS WeekAlexandre Solodkov1 Status of TileCal software.
1 “Steering the ATLAS High Level Trigger” COMUNE, G. (Michigan State University ) GEORGE, S. (Royal Holloway, University of London) HALLER, J. (CERN) MORETTINI,
Cern -April 24, 2007Atlas Data Quality Workshop M. Primavera1 Muon EF Data Quality Muon EF Data Quality M. Primavera - I.N.F.N. Lecce on behalf of Muon.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
Muon Trigger Slice Report Sergio Grancagnolo for the Muon Trigger group INFN-University of Lecce CERN Jan 23, 2007.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
Lisbon, 23/10/03TSS: ATLAS L1 Simulation / CTP1 From CTP-D to CTP Ideas from the top of my head Th. Schörner-Sadenius, U Hamburg I basically looked through.
September 2007CHEP 07 Conference 1 A software framework for Data Quality Monitoring in ATLAS S.Kolos, A.Corso-Radu University of California, Irvine, M.Hauschild.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
Muon Reconstruction with Moore and MuonIdentification The Moore/MUID group Atlas Physics Workshop Athens, May 2003.
/MuID status report on behalf of the Moore/MuID group. Status in the releases ( Units Migrations DC1/G3 MuonGeoModel Migration DC2/G4) MuID updates Trig.
9/12/99R. Moore1 Level 2 Trigger Software Interface R. Moore, Michigan State University.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Claudio Grandi INFN-Bologna CHEP 2000Abstract B 029 Object Oriented simulation of the Level 1 Trigger system of a CMS muon chamber Claudio Grandi INFN-Bologna.
4/9/2007RPC converter1/18 RPC bytestream converter: Brainstorming a summary of discussions involving M.Bianco, G.Cataldi, G.Chiodini, E.Gorini, A.Guida,
S t a t u s a n d u pd a t e s Gabriella Cataldi (INFN Lecce) & the group Moore … in the H8 test-beam … in the HLT(Pesa environment) … work in progress.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
1 OO Muon Reconstruction in ATLAS Michela Biglietti Univ. of Naples INFN/Naples Atlas offline software MuonSpectrometer reconstruction (Moore) Atlas combined.
RpcPrepRawData 1 The conversion from the online RPC data structure (trigger-driven) to offline RpcPrepRawData is not trivial: generally, one online hit.
Pavel Nevski DDM Workshop BNL, September 27, 2006 JOB DEFINITION as a part of Production.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
A Level-2 trigger algorithm for the identification of muons in the ATLAS Muon Spectrometer Alessandro Di Mattia on behalf of the Atlas TDAQ group Computing.
Status report for LVL2 e/  ESD/AOD Aims and constraints Tracking status Calorimetry status (Monika) Monika Wielers Ricardo Gonçalo.
1 Plans for the Muon Trigger CSC Note. 2 Muon Trigger CSC Studies General performance studies and trigger rate evalution for the full slice Evaluation.
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
1 TrigMoore: Status, Plans, Possible Milestones. 2 Moore in HLT- status and ongoing work Package under the CVS directory: Trigger/TrigAlgorithms/TrigMoore.
CP Athena Monitoring Status as of 20/05/08 Revised directory structure (again!). Phi scale configurable in degrees, radians or channels. Existing plots.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Beam test Analysis Micromegas TPC by Wenxin Wang.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Measuring the B+→J/ψ (μμ) K+ Channel with the first LHC data in Atlas
U.S. ATLAS TDAQ FY06 M&O Planning
The University of Manchester
Rich Occupancies and Bandwidth in Minimal Upgrade Layout
OO Muon Reconstruction in ATLAS
The First-Level Trigger of ATLAS
Preparation of the CLAS12 First Experiment Status and Time-Line
MOORE (Muon Object Oriented REconstruction) MuonIdentification
Muon Trigger Software Status
integration in HLT-status and prospects
ATLAS DC2 & Continuous production
Combine Test Beam 2004 SCT Modules in Space Draft
M.Biglietti (Univ. Naples and INFN Naples)
Presentation transcript:

current status of LVL1 Muon-Endcap Trigger simulation Tadashi MAENO ( CERN ) for the developers of TGC simulation code TDAQ-week in LISBON ( 23th Oct. 03 )

Development of TrigT1TGC TrigT1TGC is based on the standalone software for TGC electronics. The simulator has been used for verification of hardware, so fully reliable. Since end of 2002, we started to integrate our simulator with other components on Athena framework. TrigT1TGC Hardware check Test-beam verification Standalone simulator Athena

Current status of TrigT1TGC TrigT1TGC has all the functionality appeared in the electronics  it allows us to compare the result in all the step. SlaveBoard PatchPanel HighPtBoard SectorLogic StarSwitch ReadOutDriver Components of TrigT1TGC Digit ROI, pT ByteStream Readout part Trigger part

Requirements of TrigT1TGC TrigT1TGC on Athena framework TrigT1TGC TrigT1CTP TrigT1MuctpiDC1 Zebra HLT Digit ByteStream ROI, pT pT threshold RoiSvc Blue line: done Red line: on going

Development of Readout part Bytestream format, bare-RDO and prepared-RDO were defined with help of Ketevi, thanks ! Preparation of converter is going on (~ end of Oct.). TrigT1TGC ByteStreamCnv Prepare-RDOByteStream HLT Bare-RDO Hit data Trigger data (SLB coincidence)

Development of CablingSvc On-line ID is private electronics ID. Converter to/from official Identifier (Offline-ID) was prepared. TGCcablingSvc [ MuonSpectrometer/MuonCablings/TGCcabling ] RDO DIGI For HLT TrigT1TGC DC1 Zebra Digitized input TGCcabling

Development of RoiSvc for “ Trigger Part “, one missing thing is “ RoiSvc “, it should be appeared soon for ( HLT study ) TrigT1TGCTrigT1Muctpi ROI RoiSvc HLT TGCcablingSvc DetectorDiscription Region of Roi eta, phi Roi

what will come using these tools ? DIGI recorded in DC1 zebra-file ( MuonId ) CablingSvc ( offline  online ) TrigT1TGC ( Trigger Simulation ) bare and/or prepared -RDO ROI SL output to Muctpi for HLT study Trigger map refinement Trigger efficiency study ( Pt vs efficiency,... ) for input data of HLT

Schedule before end of this year ( target release ) –all the function mentioned in last slide should be appeared Application to the Test Beam analysis of this framework is foreseen (~ Dec.)

Conclusion TrigT1TGC will have full functionality for both readout part and trigger part, before Muon-Endcap Trigger study starts soon.  Trigger efficiency  pT threshold  R-Phi map for SectorLogic