TARGET HALL OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.

Slides:



Advertisements
Similar presentations
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
Advertisements

Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
Accelerator Science and Technology
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
Ian Bailey University of Liverpool / Cockcroft Institute UK EUROTeV Photon Conversion Target Project EUROTeV: WP4 (polarised positron source) PTCD task.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Accelerator Science and Technology Centre Abstract The baseline design of the positron source for the International Linear Collider (ILC)
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Status of the HELICAL contribution to the polarised positron source for the International Linear Collider The positron source for the International Linear.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Target Wheel Prototype Progress Zeuthen meeting – Apr 7-9 Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Ian Bailey University of Liverpool / Cockcroft Institute Positron Source Target Development Update Collaborators STFC Daresbury Laboratory, STFC Rutherford.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Ian Bailey University of Liverpool / Cockcroft Institute ILC Baseline Target Collaborators STFC Daresbury Laboratory, STFC Rutherforord Appleton Laboratory,
Key luminosity issues of the positron source Wei Gai.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Positron Source Target Update Tom Piggott Jeff Gronberg Lisle Hagler Dain Holdener Marty Roeben This work was performed under the auspices of the U.S.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
Possible Layout of Positron Target Region Peter Sievers and Kaoru Yokoya MiniWS, KEK 2016/4/19 Target Region Layout, Yokoya 1.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LC-ABD WP2.3 (robust spin polarisation) and WP5.1 (helical undulator) form the heLiCal collaboration. Ian Bailey on behalf of the Helical Collaboration.
November 12, 2007 J.C. Sheppard/SLAC Slide 1 Thoughts on Remote Handling (taken largely [almost entirely] from Vinod Bharadwaj) (also a RIA movie from.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Photon Collimator and Conversion Target Status I. Bailey University of Liverpool / Cockcroft Institiute Cockcroft Institiute.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Polarised Positron Source Target and Collimator
Depolarisation Effects at the ILC Damping Ring
University of Liverpool / Cockcroft Institute
MICE CM28 Engineering Session Summary (On behalf of Wing)
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
UK RFD Pre-Series cryomodule
J. C. Sheppard SLAC September 29, 2006
Presentation transcript:

TARGET HALL OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool

Recap of Talks from RAL Positron Source Meeting, Sep Andriy Ushakov, DESY FLUKA simulations with simple target geometry. For baseline design, equivalent dose rate for a Ti ( W) alloy target wheel, 1 week after shutdown, after 5000 hours of running, 1m from wheel is ~170 (120) mSv/h NB 65m (43m) of undulator assumed (shorter than baseline). Reduction to level of 0.03mSv/h requires ~15cm of Pb shielding EU exposure limit is 20mSv/year See presentation in tomorrow’s target session. Remote-handling needed (c.f. 20mSv/h manual worker limit at LHC)

Tim Broome, RAL –Remote-handling orientation (vertical / horizontal) –Replacement strategy (modular / component) –Required time for exchanging targets? Recap of Talks from RAL Positron Source Meeting, Sep 2006.

Handling Concepts - Horizontal Services remain connected, target moved to an integral remote handling cell for replacement. T. Broome, RAL, Sep 2006

Handling Concepts - Vertical Services disconnected and target removed to a storage facility. Later can be worked on in a separate remote handling facility Smaller footprint than horizontal but transfer flasks are required T. Broome, RAL, Sep 2006

Comments on the proposed target design Remote Handling must be considered from the outset All service connections have to be remotely handled so choose a system with a minimum of connections Consider radiation cooling (to eliminate problems with the water systems (seals etc) If water cooling is used why not drive the wheel with the water and eliminate the motor Instrumentation is often a key item and can be the life limiting and present a significant remote handling challenge It looks like remote vacuum connections will be required. For a mbar vacuum this will require development Definition of end of life of the target assembly is useful but very difficult T. Broome, RAL, Sep 2006

Chris Densham, RAL –The ISIS Horizontal layout used as starting point –Complete target and services system to be on rails and moved in and out of the beam –Vertical installation may have some advantages (space, cost) but likely to be slower to change targets (days or weeks - not hours) Recap of Talks from RAL Positron Source Meeting, Sep 2006.

Single Target Station - Side View Target module Remote handling cell Services trolley (target cooling, cryogenics for solenoids) Service lines C. Densham, RAL, Sep 2006

Target hall layout 50 m UPT Target AMD Pre- Acceleration system A (Target module withdrawn into hot cell) Target AMD Pre- Acceleration system B (in operation) Electron linac C. Densham, RAL, Sep 2006

Topic Action Items: D.Target Hall Vinod Bharadwaj More activation/damage calculations Identify what numbers are needed from the calculations Figure how to do the simulation – which program(s) etc. identify people to do the simulations include detailed layout of hardware: OMD, SW RF, TW RF, solenoids, shielding Define target hall dimension requirements target hall occupancy needs needed shielding what is in the hall and what is on the surface scenarios for all the needed repair/replacement operations KAS target hall Does ILC plan to have a central hot cell facility? e+, dumps etc. will it be useful for the positron stuff Re-visit two/one target requirement (availability, R&R time,……) Topic Summary - RAL positron source meeting, Sep 2006.

Progress Since RAL meeting More sophisticated activation simulations interfacing FLUKA to ASTRA, etc (see Andriy Ushakov’s presentation) More sophisticated FLUKA input geometry (L. Fernandez-Hernando, ASTeC, DL) Cost driven decision to adopt smaller target hall Vertical remote-handling concept (c.f. SNS and PSI) developed by RAL Fortnightly remote-handling and activation phone meetings started.

5 cell rf cavity. e.g. s/c OMD Target wheel (includes water channel) L. Fernandez-Hernando,DL, 25/01/2007 Drive shaft (includes water channel) Target Geometry Drawn in SimpleGEO A few glitches found in exporting geometries between SimpleGEO and FLUKA. Should be able to begin simulations in a few weeks.

Alternative Target Hall Layout Mini target hall 2 target stations Surface reprocessing ~25% of full target hall size (~250m 2 ) V. Bharadwaj, 17 th October 2006

Alternative Target Hall Layout V. Bharadwaj, 17 th October 2006 Micro target hall 1 target station Surface reprocessing ~8% of full target-hall size (~100m 2 ) New baseline.

Remote Handling and Target Removal EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L. Zang (Cockcroft Institute / University of Liverpool) D. Clarke, K. Davies, N. Krumpa, J. Strachan (CCLRC Daresbury Laboratory) C. Densham, J. Rochford, B. Smith, M. Woodward (CCLRC Rutherford Appleton Laboratory) J.L. Fernandez-Hernando, D.J. Scott (CCLRC ASTeC Daresbury Laboratory / Cockcroft Institute) P. Cooke, P. Sutcliffe (University of Liverpool) In collaboration with Jeff Gronberg, David Mayhall, Tom Piggott, Werner Stein (LLNL) Vinod Bharadwaj, John Sheppard (SLAC)

Target Removal/Replacement Showing Storage Cell M. Woodward, 24 th Jan 2007 Beam Pipe

M. Woodward, 24 th Jan 2007 Target Module and Plug with Support Services Cryocooler (if required) + vacuum pump + water pump Details of vertical drive for target wheel not yet considered.

M. Woodward, 24 th Jan 2007 Target Module and Plug with Support Services (2)

Estimated Target Changeover Times Remove 1.Switch off and isolate electric power to magnets (overhead cable system) 8 2.Switch off and isolate power to Target Wheel motor 8 3.Stop Target Wheel coolant pump 4.Blow out Target Wheel 5.Remove/disconnect water supply 6.Close actuated vac valves on beam line each side of target station. 1 7.Close actuated vac valve on AMD side of target station 2 8.Close actuated vac valve on NC Accelerating Cavity side of target station. 9.De-pressurise both pillow seal units2 10.Attach lifting rods4 11.Attach lifting beam 12.Lift target station complete with shielding, vac pump running and cryocooler running 2 13.Place into parking enclosure 14.Disconnect from crane1 ~28 Hours Removal M. Woodward, 24 th Jan 2007

Estimated Target Changeover Times ~25 Hours Replacement Replacement 15.Connect lifting rods and beam to new unit with shielding, vac pump and cryocooler running – already under vacuum and cold 2 16.Lower into position – locate2 17.Pressurise and activate both pillow seal units4 18.Open actuated vac valve on NC Accelerating cavity side of target station 2 19.Open actuated vac valve on AMD side of target station 20.Test target station vacuum for leaks1 21.Open actuated vac valves on beam line each side of target station 2 22.Replace/reconnect water supply1 23.Reconnect power to target wheel motor1 24.Test wheel motor. Test water flow through target wheel 2 25.Connect electric power supply to magnets8 TOTAL REMOVAL + REPLACEMENT 53 M. Woodward, 24 th Jan 2007

Discussion Topic Action Items: D.Target Hall Vinod Bharadwaj More activation/damage calculations Identify what numbers are needed from the calculations Figure how to do the simulation – which program(s) etc. identify people to do the simulations include detailed layout of hardware: OMD, SW RF, TW RF, solenoids, shielding Define target hall dimension requirements target hall occupancy needs needed shielding what is in the hall and what is on the surface scenarios for all the needed repair/replacement operations KAS target hall Does ILC plan to have a central hot cell facility? e+, dumps etc. will it be useful for the positron stuff Re-visit two/one target requirement (availability, R&R time,……) Sufficiently understood? FLUKA + …? Regular meetings between DESY, DL, Liverpool, ANL, SLAC Underway between DL and DESY Started this process Any progress?