1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.

Slides:



Advertisements
Similar presentations
The Power to Make a Difference PPL Electric Utilities April 2010.
Advertisements

Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
Platinum Energy, Inc. Slide No. 1 PROJECT EVALUATION Joseph A. Orlando, Ph.D, PE Platinum Energy, Inc. Springfield, Virginia
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
New Jersey Clean Energy Symposium Rowan University - June 18, 2004 New Jersey Clean Energy Program Renewable Energy Programs and Policies.
Small Wind and Solar Systems Kristi Robinson Steele-Waseca Cooperative Electric.
SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
WAL-MART STORES, INC. DEMAND RESPONSE. Wal-Mart in New York Supercenters45 Discount Stores45 Neighborhood Markets 0 Sam’s Clubs17 Distribution Centers4.
Cogeneration. Is the simultaneous production of electrical and thermal energy from a single fuel source.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Indiana’s Clean Energy Credit Program (Energy Efficiency & Renewable Energy Set-aside) Roger Letterman Sr. Environmental Manager Office of Air Quality.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Advanced Biomass-based Combined Heat and Power System Combined Heat & Power in the Pacific Northwest October 15, 2002 Nathan E. Carpenter Manager, Energy.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Neeharika Naik-Dhungel, EPA CHP Partnership Program Central Pennsylvania AEE Meeting January 26, 2012 Combined Heat and Power: CHP Partnership and the.
COGENERATION Allison M. Selk 12/8/04 CBE 562.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
GPAEE November 20, 2014 Combined Heat and Power Overview & CHP Technical Assistance Bill Valentine DOE Mid Atlantic CHP Technical Assistance Partnership.
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Physical Plant Department Physical Plant Department Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
NJ Clean Energy Program Noveda Technologies Liberty Science Center By: Joe Fiorella Information from the:
Air Emission Benefits of CHP Air Innovations Conference August 10, 2004 Joel Bluestein Energy and Environmental Analysis, Inc. Prepared under contract.
1 CHP – The Concept Presented At: Methane Recovery from Farm & Food Processing Waste Peru, Indiana June 6 th, 2006 Presented By: John Cuttica Midwest CHP.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
EE/RE in the 83 rd Texas Legislature Dub Taylor Director, SECO.
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
Technology details, potential and experiences of Trigeneration
Green Universities and Colleges Subcommittee March 16, 2011.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Efficient Power Generation Dick Munson Recycled Energy Development Midwest Media Project 10 July 2007.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
ECONOMIC DEVELOPMENT SERVICES SOUTHERN CALIFORNIA EDISON Leading the Way in Electricity | Business Customer Division 1 For External Use Economic Development.
Clean Energy Technologies Dick Munson Recycled Energy Development Congressional Distributed Energy Caucus 27 March 2007.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
2010 Massachusetts Energy Efficiency Programs July 1, 2010.
Cogeneration (CHP – Combined Heat & Power) October 2013 © Siemens AG All rights reserved.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Sixth Northwest Conservation & Electric Power Plan CHP in the Sixth Plan?? Jeff King Northwest Power and Conservation Council Generating Resources Advisory.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
California Solar Initiative Dian M. Grueneich, Commissioner California Public Utilities Commission March 30, 2006.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
CHP Project Costs Screening Public Utility Commission of Ohio Public Utility Commission of Ohio Combined Heat and Power: Financial.
Upstate New York Energy Efficiency Program Central Division Customer Meeting Genesee Grande November 5, 2009 Jim Stapleton – Manager C & I.
Michael A. Chowaniec, Legislative Director Connecticut Department of Public Utility Control Planning Conference on Maryland’s Energy Future July 26, 2007.
1 City of Palo Alto Utilities Large Commercial Customer Pilot Demand Response Program Customer Meeting March 8, 2012.
New Jersey Energy Efficiency, Generation & Resilience Funding Update
Self-Generation Incentive Program (SGIP)
Narragansett Electric Rate Classes
Energy Conservation CERD /12/2017
Plug & Play CHP? Is Your Pocket About to be Picked?
Presentation transcript:

1 EERMC Public Meeting on Combined Heat and Power September 17, 2013

2 Rhode Island Legislation “Beginning on November 1, 2012 or before, each electric distribution company shall support the installation and investment in clean and efficient combined heat and power installations at commercial, institutional, municipal, and industrial facilities….”

3 National Grid Electric’s 2013 CHP Program  System qualification  Must be an electric customer  System must provide electric and thermal output  Thermal leading or using waste hear to generate electricity  55% minimum system efficiency using HHV  Technology must be one of following: IC engine, GT, steam turbine, back pressure turbine, or fuel cell  Must be cost effective  Recruitment through vendor and customer education  Potential for prequalifying vendors  Align vendor presentations to customers with Company technical requirements  Scoped through engineering study  Measure thermal loads  Size CHP  Assemble cost estimate  Consider barriers to successful implementation  Cofunded by utility if done by preferred firm

4 National Grid Electric’s 2013 CHP Program  Must pass screening process and RI benefit cost test (BCR > 1)  Benefit cost test must include cost of all fuels and CHP maintenance  Economic development benefit  Air quality benefits  Adjusted distribution benefits

5 National Grid Electric’s 2013 CHP Program  Incentive available for eligible projects  $900/kW per net kW for projects 55% to 59.99% efficiency  Net kW is nameplate kW output minus auxiliary  $1,000/kW for projects 60% or greater efficiency  25% bonus for any efficiency if facility also implements (or has implemented energy efficiency in previous five years) of at least 5% of site energy use  Also eligible for Advanced Gas Technology Incentive  Total incentive package (EE, AGT and performance rebates) cannot exceed 70% of total project cost.  Incentives subject to budgetary limitations and caps  Large projects  Projects 1 MW or larger eligible for a performance incentive of $20/kW- year for metered load reduction  Projects 1 MW or larger commit to 10 years of operation or will have to refund prorate portion of incentive  Incentives greater than $3 million subject to PUC approval

6 National Grid Electric’s 2013 CHP Program  Other requirements  Compliance with Minimum Requirements Document  Thermal and electric metering required  Metering hardware and data collection services may be provided at little or no cost to the customer  O&M services contract required through first major overhaul  May not operate until Company provides authorization to interconnect  All systems require commissioning; 20% of incentive payment retained until commissioning is complete  ISO-NE capacity rights belong to National Grid  Customers will be billed on general services tariff, with a minimum customer charge, as opposed to backup service rate

7 AGT Program (Advanced Gas Technology)  The program is based upon adding natural gas load during the company’s off peak period, rather than reducing load through conservation efforts  To accomplish this, the company gives incentives to innovative projects that add non-heating load  Incentive is minimum of  the additional margin gain from the project, up to 75% of the project’s future margin  75% of the project cost  the amount needed to buy down the payback period to 1.5 years  remaining AGT fund balance  Any rebate over $250K needs PUC approval  Customers are allowed to participate in both EE and AGT programs as long as they meet both sets of requirements

8 RI CHP Target Markets  Markets that we found to be the best target segments are:  Hospitals  Universities/Colleges  With Central Heating Plants that have a continuous summer load  Industrial  Nursing Homes  These are all large users of hot water & electricity that are coincidentally used

9 How is the program performing this year? Successes:  A 12.5 MW cogeneration system being installed at a local plastics company.  A 60 kW unit being installed at a local multi-family site Ongoing:  Two projects being reviewed at RI universities Projects that didn’t go ahead:  CHP at (3) different Hospitals  A 1.1 MW at a local college

10 Current Barriers to CHP in RI  Economics don’t meet customer’s requirements  For example: Nationalgrid has done several TA studies on projects ranging from 700 kW to 1.5 MW and these have came back with paybacks ranging from 6.3 years to 13 years.  Low priority on customer’s radar (not their core business) Lack of Gas Distribution Problems found with past projects (and our solutions): Waste heat misstatements or incorrectly installed Lack of maintenance (Now require service contract) Fuel price fluctuation

11 Discussion

12 What do you think about National Grid’s 2013 CHP Initiative?

13 Have you noticed any differences in the receptiveness by potential host customers to CHP?

14 What more should National Grid be doing to support CHP development in Rhode Island?

15 What do you, your company, or your customers perceive the benefits of CHP to be?

16 What factors make CHP projects successful or unsuccessful?

17 What is your assessment of the potential for economic development of CHP in Rhode Island?

18 Summary of meeting discussion and next steps