DYNAMO Cruise Info TOGA Radar Scanning Timothy Lang.

Slides:



Advertisements
Similar presentations
Online Postgraduate Admissions Update for Postgraduate Forum – 22 January 2010 Kate Ward.
Advertisements

DYnamical and Microphysical Evolution of Convective Storms Thorwald Stein, Robin Hogan, John Nicol DYMECS.
DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Planners help to keep you organized and focused!
Chubaka Producciones Presenta :.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Application Maintenance – Tips and Tricks for Keeping Your Application Current October 8, 9:30 AM USM Regional PeopleSoft Conference Cumberland,
Cabo Guasave S-Pol NAME Radar Data - Product Description & Quality Control.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
ASR Science Team Meeting, Bethesda, MD, 17 March 2010 R. Houze, C. Long, S. Medina, C. Zhang AMIE/CINDY/DYNAMO: Observations of the Madden-Julian Oscillation.
Lessons learned in field studies about weather radar observations in the western US and other mountainous regions Socorro Medina and Robert Houze Department.
Radar Operations during AMMA SOP Alain Protat  Benin mesosite : Scanning Polarimetric Doppler X-band radar (X-Port) + Scanning Polarimetric Doppler C-band.
RHB C-band radar scan strategy constraints Cloud top height less than 1.5 km altitude Features of interest < 5 km in scale Rapid evolution of cells  fast.
1 Radar Displays PPI - Plan position Indicator Maps the received signals on polar coordinates in plan view. The antenna scans 360° at fixed elevation angle.
Origins of MJO in central, equatorial Indian Ocean Mechanisms for initiation not well understood MJO affects: Monsoons (Onset and Intensity) TC activity.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
WSR‐88D Dynamic Scanning
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
Credentials Committee Orientation. Responsibilities of the Committee Review the credentials of all applicants to the Medical Staff and privileges requests.
Radar Observations During NAME 2004 EOP Timothy Lang Steve Rutledge Steve Nesbitt Rob Cifelli Lee Nelson Dave Lerach Gustavo Pereira Dave Ahijevych Rit.
Bachelors Degree from Bethel College Director of Academic Assessment & Testing Services Director – 4 years 10 Years working in testing.
S-Pol NAME Radar Network NAME radar network will allow characterization of gulf surge precipitation along coast and over Gulf of California Selected sectors.
Directions for Creating a Timeline Become a Historian. After reading about your topic, create a timeline that includes the key ideas or events, documenting.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Distributed Radar Networks Ray Greenwald JHU/APL.
The Benefit of Improved GOES Products in the NWS Forecast Offices Greg Mandt National Weather Service Director of the Office of Climate, Water, and Weather.
Plan ahead August and September  Write or colleges for catalogs, applications and financial aid forms applications  Check registration dates.
Going Google… Drive Eric Yamoah and Haris Azmi August 14, 2015.
Polarimetric radar analysis of convection in northwestern Mexico Timothy J. Lang, Angela Rowe, Steve Rutledge, Rob Cifelli Steve Nesbitt.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
RADAR METEOROLOGY Courtney Schumacher Texas A&M University ATMO 352.
Image structures: rain shafts, cold pools, gusts Separate rain fall velocity from air velocity – turbulence retrieval– microphysical retrieval Diurnal.
Hurricane Karl’s landfall as seen by high-resolution radar data and WRF Jennifer DeHart and Robert Houze Cyclone Workshop NASA grants: NNX13AG71G.
Tele-Conference with Lincoln Labs: Icing Hazard Level National Center for Atmospheric Research 29 April 2010.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Chasing April Showers Convective storms on Wednesday 11 th April, 2012 WCD Friday 4 th May, 2012 Thorwald Stein DYMECS research assistant *Not by running.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Mesoscale variability and drizzle in stratocumulus Kim Comstock General Exam 13 June 2003.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Where are my files? Discoveries in establishing a digital archive workflow Sally McDonald Archivist/Librarian Western History/Genealogy, Denver Public.
TOPSpro Special Topics I: Database Managemen t. Agenda for Module I: Database Management  TOPSpro Backup/Restore Wizard  TOPS-TOPS Import/Export Wizard.
 Signed by EPA Administrator on September 24,  EPA anticipates the final rule will be published in the Federal Register in October  Final.
Science Plan for Radar Observations During NAME NSF S-Pol Radar SMN C-Band Doppler Radars Shipborne Radar P-3 Aircraft Radar Steve Rutledge Timothy Lang.
Estimating Rainfall in Arizona - A Brief Overview of the WSR-88D Precipitation Processing Subsystem Jonathan J. Gourley National Severe Storms Laboratory.
Statistical Analysis of S-Pol Polarimetric Radar Data from NAME 2004 Timothy J. Lang, Robert Cifelli, Steven A. Rutledge, Angela Rowe, and Lee Nelson Colorado.
Karen Kosiba, Josh Wurman, Stacy Brodzik, Andrew Frambach
31 May UTC meeting John Hubbert and Angela Rowe
NPOL Olympex Located N/ W, 157 m ASL
YugNIRO Digitization Proposal 2012
Moistening Processes for the October-November 2011 MJO Events
Margaret Ferrell Debbie Gyorki Christina Ingram
Polarimetric radar analysis of convection in the complex topography
21st Century Online Exhibits:
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
PORT OF GALVESTON PORT DIRECTOR’S REPORT
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
TEAMWORKS TRAINING 101.
Proud As A Peacock! We are very proud of__________________
A film starts at 13:45 and lasts for 1 hour and 35 minutes
TGak November Closing Report
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

DYNAMO Cruise Info TOGA Radar Scanning Timothy Lang

Revelle Ship Schedule DYNAMO Leg 1 23 August Arrive Port Darwin Install TOGA Radar 29 August Depart Darwin, Australia Schedule as of 27 April 2011

Revelle Ship Schedule DYNAMO Leg 1 5 September Arrive/Depart Cocos (Keeling) Islands Staff exchange

Revelle Ship Schedule DYNAMO Leg 1 26 September Arrive Tuticorin, India (aka Thoothukudi)

DYNAMO Leg 2 29 September Depart Tuticorin Park at 80 E (or further east) on Equator 31 October Arrive Tuticorin DYNAMO Leg 3 5 November Depart Tuticorin Park at 80 E (or further east) on Equator 10 December Arrive Tuticorin DYNAMO Leg 4 14 December Depart Tuticorin Pinkel Cruise 5 January Arrive Tuticorin

TOGA Radar Scanning during DYNAMO

Major Scan Period - 30 minutes Three minor periods plus single low-PRF 0.5° sweep (300-km range) Minor Scan Period - 10 Minutes 8-10 minutes full 360° PPI volume 0-2 minutes RHIs Three Scan Types for PPI Volumes (150-km range) Scan A - SHALLOW: 5 minutes emphasize shallow angles, repeat Scan B - FAR: 8-9 minutes, top km beyond km range, emphasize vertical resolution Scan C – NEAR: 8-9 minutes, top km within km range, reduced vertical resolution One RHI set Scan D – 1-2 minutes, 2 ° s -1 rate, up to 40° elevation, 3-6 sweeps total 0 30 min 60 min PPI, then RHI PPI, then Surv

Scan A – Run when there is nothing but sea clutter, or extremely shallow echo Scan B – Default scan for 70-90% of raining periods Scan C – Run when tall convection is very close to ship Progress from Scans A to B to C as highest elevation angle becomes insufficient to top convection. Must anticipate as we change volumes on the 10s, not 5s. Progress from Scans C to B to A as the highest elevation angle of the next shallowest scan becomes sufficient to top convection Scan A will last 5 minutes and repeat (probably run a little shorter than 5 min to allow time for long-range single sweep every 30 minutes) Precip Scans (B & C) will last 8-9 minutes, timing and angles TBD The remaining time before the 10 minute mark will be filled with preset RHI sweeps (Scan D) Every third minor period, RHIs will be replaced by single long-range sweep Will make use of timing capabilities in IRIS scan controller software

Timothy Lang will work with Steve Rutledge, Brenda Dolan, and Nick Guy to design angles and timing for all scans Timothy Lang and Nick Guy will finalize all scans while on Leg 1, and will provide training documents (as well as in-person training to Leg 2 staff) at the end of Leg 1 Leg 2 participants, Nick and Timothy will train you in Tuticorin on 27 September. We leave 28 September, one day before the ship departs. Also recommend Legs 3 and 4 staff work with previous Leg’s staff to set a date for in-person training in Tuticorin. Plan for 8-12 hour shifts, single scientist at a time, 24/7 ops. Scientists will be responsible for calling switches between A, B, & C, and for setting azimuth angles for Scan D. You will take notes in a single word-processing document for the entire cruise, bring a copy of that document, along with data/imagery, with you when you disembark. New Leg starts a new scientific notes document.

Plan for radar imagery 1. Install Texas A&M software on CSU laptop 2. Archive data (UF or Raw) on CSU drives 3. Run software daily to create a set of daily summary images 4. Transfer imagery to Internet-capable computer via thumb drive 5. Upload imagery once per day to DYNAMO servers