Cost Estimating Walter Kafuka

Slides:



Advertisements
Similar presentations
Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
JOB ORDER CONTRACTING Contract Management Department 8/28/121.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Virginia Housing Coalition 2013 Housing Credit Conference Deal Structuring, Fundamentals, and Financing and Legal Issues.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
Project Overview and Status June 17, 2014 Loreen Bobo, P.E. I-4 Ultimate Construction Program Manager.
Construction Engineering 221 Cost Estimating and Bidding II.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
4/13/2017 1:54 PM.
Intuit Master Builder 7 System Tour Solution Resources
I-4 Master Plan Implementation Harold W. Barley Executive Director Tampa Bay Regional Transportation Summit October 10, 2013.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
The Risks and Rewards of Contractor Bids and Proposals.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
1 Institutional Support Services Capital Project Process.
PORT OF MIAMI TUNNEL PROJECT 1 FDOT& MAT Presentation FDOT & MAT Presentation.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Construction Engineering 221 Cost Estimating and Bidding.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Financing Urban Public Infrastructure
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Team Presentation November 12,  City of Palm Coast Brian Rothwell, Purchasing Manager Team Leader Stephen Flanagan, Utility Development Manager.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Introduction to P3 Bootcamp
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Partners in Progress Forming Bonds with GECs to Build Roads.
S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University.
Legislative Opportunities and Impediments - The Virginia Experience Virginia Public Private Partnerships ATRA TECHNIX Program Phil Bomersheim “Activist”
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Intuit Master Builder 2003 System Tour Intuit Master Builder 2003 We need that estimate today! It takes me 2 days to get out that billing. Where’s our.
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
Community Development Department Construction Phase.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Innovative Solutions for tomorrow’s transportation needs Local Agency Program Performance Measures, Project Scheduling, and Efficient Project Delivery.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Stockton University Purchasing and Grants 11/4/15.
Introduction to Procurement for Public Housing Authorities Alternatives to Procurement: Force Account Labor Unit 9.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
4. Price Labor, Materials, and Equipment Ⓒ. L ABOR C OST Six Components to the Labor Cost: 1. Wages 2.Worker's Compensation Insurance 3.FICA Tax, Federal.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
 The costs of operating a business are often called overhead expenses.
Is There a Proper Accounting for Indirect Costs?
Costs and Economics of Construction
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Finance and Risk Public-Private Partnerships
Florida Transportation Commission FY 2009
Responsibilities and FUNDING
Estimating – Overhead, Profit, Margins, & Markups workshop
Estimating – PRICING Materials, Equipment, & Labor Workshop
Presentation transcript:

Cost Estimating Walter Kafuka Types Of Estimates Construction/Bid Estimates Engineering/Budget Estimates ROM (Rough Order of Magnitude) Estimates

Estimating Construction Work Pay close attention!

What’s in a Cost Estimate? Direct Costs Labor Material Equipment Subcontracts Other Costs Fees (Permit, Disposal etc.)

What’s in a Cost Estimate? Indirect Costs General Conditions - Project Management/Supervision - Trailers/Storage Containers - Temporary Utilities - Badges/Access Passes (NASA/AirForce/USACE/NAVFAC) Permits Design/Submittals

Mark-ups Labor Burden Sales Tax Overhead Profit Contingency

The Process of Building an Estimate Quantity Takeoffs Digital Roller Scale Architectural Ruler On-Screen Take-off Conversion to the Correct Scale For example – covert LF of walls to SF

The Process of Building an Estimate RS Means will provide you with your labor, material and equipment costs Begin populating your estimate by looking up scopes of work in RS Means Via use of RS Means books Via use of Estimating Software Sage Estimating (formerly Timberline) Trimble WinEst (WinEstimator)

The Process of Building an Estimate Adjustments to RS Means Values Labor Adjustments Davis Bacon Wage Determinations Union Labor Previous Experience Material Adjustments Vendor Quotes Equipment Cost Adjustments Equipment Rental Quotes Subcontracts

Adding Some Mark-ups Determine the Sales Tax for your Area Applies to your Material & Equipment Costs Determine your Labor Burden Costs that cover state and federal taxes, Payroll Taxes, Workers Compensation Insurance, SUTA, Benefits

General Conditions Any Permits required? Environmental Permits Building Permits Determine a duration for your project This will be what you use to determine how long you will need to have the following: Field Supervision Project Management Trailers/Utilities

Adding More Mark-ups Contingency Profit Overhead Typically determined by Ownership Sometimes determined by the client Profit For negotiated Government Contracts there is usually a scale that determines profit allowed Overhead Typically determined by accounting Sometimes determined by the Client (for Engineering/Budget Estimates)

Engineering Input Typically provided for Engineering/Budget Estimates and Design-Build bids Drawing reviews with engineers & architects Value Engineering Options

Case Study: SSPF Labs Renovation Engineering/Budget Estimate Renovation of PEMB space to lab space Design to Budget < $1M Cost Estimates to be provided at 45%, 90%, 100% & Final

SSPF Labs Renovation Perform quantity take-offs & continue process as described before to produce estimate. Contractor OH & Profit for budgeting determined by NASA. Contingency determined by NASA.

SSPF Labs Renovation Additional Considerations Provide back-up quotes for specialty items or systems over $5k that include: Air Handler Lab Equipment (Bio-Safety Cabinets, Glass Washers, etc.) Lab Lighting

About the Project “I-4 Ultimate” Florida Department of Transportation Public-private partnership (P3) 21 miles of I-4 Reconstruction, including 4 new tolled Express Lanes Interchange improvements Traditional design & construction Financing Long-term/40-year Operations & Maintenance $2.3 Billion Budget Biggest Transportation Project in FDOT History

Project Schedule Financial Close: 4 September Design/Notice to Proceed 1: 3Q2014 Construction/Notice to Proceed 2: 1Q2015 Substantial Completion: 4Q2020 Final Acceptance: 1Q2021 Overall ~6.5 year schedule

I-4 Mobility Partners Structure Florida Department of Transportation Concession Agreement Equity Contribution Agreement Financing Agreements Sponsors (50/50) Lenders O&M Agreement DB Agreement CJV (40/30/30) O&M during Construction O&M works DJV (65/35)

Project Enhancements Our enhancements: Auxiliary Lanes on I-4 for capacity Provided Direct Connect Ramps to SR 408 Improved ramps/turn lanes for Level of Service Added Maitland Summit Bridge Added Kirkman Road Pedestrian Bridge Create Green Space at Parramore/Griffin Park Increase capacity at Division/Kaley Avenue Improved Bridge Architecture Key on the Lake Ivanhoe Gateway to Orlando Add Direct Connect Pylons to Express Lanes Iconic Pedestrian Bridge at Maitland Extensive landscaping and fountains Aesthetic Lighting in the Downtown Orlando Create a $1.5M fund for artwork along Corridor Deliver Platinum Envision Certification from ISI

I4 Mobility Management Plan Our Project Management Plan: HUB Office in Maitland (42,000 SF) Co-located administrative office with FDOT, COS, I-4 Mobility Partners, Volkert (QAF), SGL Constructors and Designers (HDR/Jacobs) SGL is fully integrated joint venture Setting up 4 Area Field Offices along Corridor Each area has Project Management staff responsible for safety, quality, schedule and commitments of the team Administrative leaders at the Hub Office will maintain consistency in our delivery and can move resources as required to uphold the overall schedule SGL team is proud to assemble our team of professionals that will properly plan our work in order to successfully deliver the I-4 Ultimate Project for FDOT and Central Florida

Than for your attention!

Happy Thanxgiving!!

Questions?