TRANSMISSION NETWORK INVESTMENT CRITERIA

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

Status of USAID-Supported Transmission Planning Dr. Robert F. Ichord, Jr. Chief, Energy and Infrastructure Bureau for Europe and Eurasia US Agency for.
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Software Analysis Tools
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Towards Regional Independent Operators – a main driver for successful market integration.
Recent Regulatory Developments in the gas market of the Energy Community Dr. Michael Thomadakis Vice President, RAE Chairman of the Gas Working Group,
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
The Role of regulators in Energy security Sergey G.Novikov Head of Federal Tariff Service of Russian Federation Istanbul
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
BALTIC RING STUDY From the beginning of 1996 to early 1998, 18 power companies and utility organizations from the 11 countries around the Baltic Sea have.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Turkish Power System Overview March 2012
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) Athens – 27 th of October 2004.
Optimization for Operation of Power Systems with Performance Guarantee
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Energy Agency of the Republic of Serbia
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
Update on electricity market Baltic Mini Forum 1 October, 2010.
IG Meeting Transmission Development activities in the CEE Region in the scope of Coordinated Transmission System Development WG and UCTE Central East Forum.
1 An Overview of Power Quality Problems In Transportation and Isolated Power Systems Paulo F. Ribeiro Calvin College / BWX Technologies, Inc Grand Rapids,
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
World Bank Framework for Energy Trade in South East Europe David Kennedy World Bank.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
IV Athens Forum 3-4 June 2004 Towards a GAS market in the South East Europe Fabio Tambone – Sergio Ascari WG CEER SEEER.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Paks II and Hanhikivi-1: financing concerns András Perger Greenpeace Risks and Responsibilities in EU Nuclear Projects June , Brussels.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
STATE ENERGY AND WATER REGULATORY COMMISSION
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Transmission Planning in a Modern Market Environment
Ministry of Regional Development and Public Works
Incentives for electricity infrastructure – ERGEG view
SUMMER OUTLOOKS 2019 Lea Dehaudt, Moderator ENTSO-E
Presentation transcript:

TRANSMISSION NETWORK INVESTMENT CRITERIA 10th Athens Forum, Athens, April 24-25, 2007 TRANSMISSION NETWORK INVESTMENT CRITERIA DAVOR BAJS GORAN MAJSTROVIC ENERGY INSTITUTE HRVOJE POZAR, Zagreb, CROATIA TRAJCE CEREPNALKOVSKI NEOTEL, Skopje, MACEDONIA

CONTENTS INTRODUCTION EXISTING PLANNING CRITERIA 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria CONTENTS INTRODUCTION EXISTING PLANNING CRITERIA NATIONAL GRID CODES AND DRAFT VERSION OF REGIONAL GRID CODES PREREQUISITES AND ASSUMPTIONS TRANSMISSION NETWORK INVESTMENT CRITERIA METHODOLOGY FOR PROJECT PRIORITIZATION CONCLUSIONS

INTRODUCTION 8th ATHENS FORUM THE STUDY SHOULD ANALYZE: 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria INTRODUCTION 8th ATHENS FORUM GIS and SECI TSP updates transmission investment criteria on regional level list of priority projects THE STUDY SHOULD ANALYZE: the problem of transmission investment in an open market environment defining the most relevant uncertainties in SEE region, review past experience on transmission network planning, analyze transmission planning criteria which have been used by different TSO in the region, review national grid codes and draft version of regional grid code, suggest transmission investment criteria from regional prospective, suggest methodology for project prioritization.

INTRODUCTION (cont.) TRANSMISSION PLANNING UNDER NEW CIRCUMSTANCES 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria INTRODUCTION (cont.) TRANSMISSION PLANNING UNDER NEW CIRCUMSTANCES different target functions uncertainties MOSTLY USED PLANNING CRITERIA n-1 LOLP NPV>0 REGIONAL PLANNING Wrong investment because of the change in bidding behavior

EXISTING PLANNING CRITERIA 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria EXISTING PLANNING CRITERIA SEE TSOs - REGULATORY AGENCIES TRANSMISISON PLANS 1- 15 YEARS AHEAD TRANSMISISON INVESTMENTS FINANCING - TRANSMISSION FEES AND LOANS. PRIVATE INVESTORS NOT ALLOWED !!! TRANSMISSION PLANNING CRITERIA - NATIONAL GRID CODES THE MAIN TECHNICAL CRITERION - (n-1) SECURITY CRITERION. (n-2) CRITERION (Montenegro and Romania) OTHER TECHNICAL CRITERIA - NOT USED (stability criteria and compensation facilities installation criteria in Romania)

EXISTING PLANNING CRITERIA (cont.) 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria EXISTING PLANNING CRITERIA (cont.) PROBABILITY OF (n-1) EVENTS – NOT VALUATED LOAD FLOW, SECURITY ANALYSIS, SHORT CIRCUIT OPTIMAL POWER FLOWS (Bulgaria, Turkey, UNMIK), STABILITY ANALYSIS (B&H, Bulgaria, Macedonia, Romania, Turkey) PROBABILISTIC ANALYSES - PERFORMED ONLY IN ROMANIA ECONOMIC CRITERIA (Albania, B&H, Croatia, Macedonia, Romania, Serbia&UNMIK) PROFITABILITY INDEX – MOSTLY USED ECONOMIC CRITERION TYPES OF BENEFIT: reduction of the cost of losses, reduction of loss of load costs, reduction of re-dispatching costs, reduction of congestion costs, benefit from telecommunication lines

EXISTING PLANNING CRITERIA (cont.) 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria EXISTING PLANNING CRITERIA (cont.) UNDELIVERED ELECTRICITY COSTS - LOWER THAN 3 €/kWh ADDITIONAL PLANNING CRITERIA FOR INTERCONNECTION LINES: mostly not applied based on system operational costs (Macedonia) based on the difference between energy prices (Serbia) UNCERTAINTIES (multi-scenario analysis) new power plants size and location generators engagement hydrological conditions market transactions country power balance NO RISK ASSESSMENTS

GRID CODES GRID CODES PRESCRIBE: 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria GRID CODES GRID CODES PRESCRIBE: TSOs obligations related to transmission system planning reports and studies the role of the transmission systems (reliable and secure system operation and continuous load supply) planning criteria input data REGIONAL ASPECTS ARE NOT MENTIONED IN NATIONAL GRID CODES THE USAGE OF (n-1) CRITERION (explanation of that criterion is very similar between countries and not permitted consequences of single outages are pretty much the same) OTHER TECHNICAL CRITERIA LIKE SHORT-CIRCUIT OR STABILITY CRITERIA ARE PRESCRIBED SOMEWHERE. TRANSMISSION INVESTMENTS ECONOMIC RATIONALIZATION - NOT MENTIONED IN NATIONAL GRID CODES (except in general term in Bosnian and Romanian grid codes)

10th Athens Forum, April 24-25, 2007 Transmission network investment criteria GRID CODES (cont.) PROBABILISTIC TECHNICAL CRITERIA FOR TRANSMISSION SYSTEM PLANNING - only in Romanian and Turkish grid codes (loss of load probability) NO GREAT DISPROPORTIONS BETWEEN NATIONAL GRID CODES AND REGIONAL GRID CODE DRAFT VERSION OF REGIONAL GRID CODE - CREATION OF WORKING GROUP (plan the network on regional level, especially directing attention on interconnection lines and those internal lines that have great impact on transfer capacities between different countries) MARKET ISSUES IN TRANSMISSION PLANNING ARE NOT SATISFACTORY TREATED planning uncertainties economic considerations of transmission investments balance between security and costs promotion of the private financing congestion costs

PREREQUISITES AND ASSUMPTIONS 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria PREREQUISITES AND ASSUMPTIONS UNIFIED REGIONAL ELECTRICITY MARKET UNIQUE NETWORK PROMOTION OF THE MARKET ACTIVITIES IDENTIFICATION AND PRIORITIZATION OF THE TRANSMISSION INVESTMENT CANDIDATES FROM REGIONAL POINT OF VIEW STABLE REGULATORY FRAMEWORK CO-ORDINATION BETWEEN SEE TSOs (technical standards, balancing rules and congestion management mechanisms) ELECTRICITY MARKET ORGANIZED THROUGH POOL AND BILATERAL CONTRACTS PRODUCTION COMPANIES WILL GIVE THEIR BIDS TO THE POOL AT REGIONAL LEVEL

PREREQUISITES AND ASSUMPTIONS (cont.) 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria PREREQUISITES AND ASSUMPTIONS (cont.) ELECTRICITY PRICE - market oriented across the region and not significantly dependent on the location in the SEE grid THE MOST IMPORTANT UNCERTAINTIES: new power plants size and locations hydrological conditions generators bids branches and generators availability load prediction regional power balance THE PROBLEM OF INVESTMENTS FINANCING THE TREATMENT OF INTERCONNECTION LINES AND INTERNAL NATIONAL LINES HAVE TO BE THE SAME

TRANSMISSION NETWORK INVESTMENT CRITERIA 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria TRANSMISSION NETWORK INVESTMENT CRITERIA 2 SET OF CRITERIA: technical economic TECHNICAL CRITERIA: (n-1) criterion voltage and reactive power criterion short-circuit criterion stability criterion ECONOMIC CRITERION - PROFITABILITY INDEX (cost/benefit ratio)

TRANSMISSION NETWORK INVESTMENT CRITERIA (cont.) 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria TRANSMISSION NETWORK INVESTMENT CRITERIA (cont.) Planning time-frame Topology Analyzed operating conditions Technical criteria satisfaction Permitted corrective actions Short All branches and generators available (n) SEE peak load SEE minimum load (1-3 years horizon) Ilines < Imax lines* Umin < Unode < Umax Stability criteria Short-circuit criteria - automatic transformers regulation - switching of compensation devices - network sectioning One branch (line, transformer) or generator or compensation device unavailable (n-1) Ilines < Imax lines** - generators re-dispatching*** - automatic and manual transformers regulation Mid (5 years horizon) Long (10 years horizon)

TRANSMISSION NETWORK INVESTMENT CRITERIA (cont.) 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria TRANSMISSION NETWORK INVESTMENT CRITERIA (cont.) TYPES OF BENEFIT: benefit due to reduction of expected annual undelivered electricity costs benefit due to annual losses reduction benefit due to reduction of annual re-dispatching costs benefit due to annual congestion costs reduction TYPES OF COSTS: investment costs operation and maintenance costs PIi > 1

METHODOLOGY FOR PROJECT PRIORITIZATION 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria METHODOLOGY FOR PROJECT PRIORITIZATION LIST OF CANDIDATE PROJECTS TECHNICAL ANALYSIS REVIEWED LIST OF CANDIDATE PROJECTS ECONOMIC ANALYSIS PRIORATIZATION: technical economic

METHODOLOGY FOR PROJECT PRIORITIZATION (cont.) 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria METHODOLOGY FOR PROJECT PRIORITIZATION (cont.) CANDIDATE PROJECTS ARE TECHNICALLY PRIORITIZED ACCORDING TO NETWORK CONSTRAINTS THAT ARE REMOVED BY CANDIDATE PROJECTS: first importance group: candidate projects that remove network constraints with (n) available branches second importance group: candidate projects that remove network constraints with (n-1) available branches FURTHER TECHNICAL PRIORITIZATION IS MADE ACCORDING TO: the number of planning scenarios in which candidate project removes network constraints voltage level of overloaded transmission lines the number of network constraints that are removed by a candidate project EVALUATION AND PRIORITIZATION OF CANDIDATE PROJECTS ACCORDING TO THE ECONOMIC CRITERIA IS BASED ON THE MAXIMUM AVERAGE PROFITABILITY INDEXES

10th Athens Forum, April 24-25, 2007 Transmission network investment criteria CONCLUSIONS PLANNING CRITERIA USED BY SEE TSOs TODAY ARE GENERALLY SIMILAR AND MAINLY CONCENTRATED AROUND (N-1) SECURITY CRITERION MARKET ORIENTED TRANSMISSION INVESTMENTS AND INVESTMENTS FROM REGIONAL PERSPECTIVE ARE NOT MENTIONED AND SATISFACTORY TREATED IN NATIONAL GRID CODES NATIONAL TRANSMISSION NETWORKS ARE MAINLY PLANNED ACCORDING TO TECHNICAL CONSIDERATIONS AND ECONOMIC RATIONALIZATION OF NEW INVESTMENTS GENERALLY REMAINS OUT OF INTEREST METHODS USED BY TRANSMISSION PLANNERS ARE BASED ON DETERMINISTIC APPROACH, WHILE PROBABILITIES OF DIFFERENT EVENTS ARE NOT TREATED SATISFACTORY WHICH DOESN’T ALLOW BETTER ECONOMICAL CONSIDERATIONS OF NETWORK DEVELOPMENT AND INCLUSION OF ECONOMIC CRITERIA INTO DECISION MAKING PROCESS SEE TRANSMISSION SYSTEM PLANNING PROCESS HAS TO INCLUDE DIFFERENT UNCERTAINTIES WHICH WILL OCCUR IN AN OPEN ELECTRICITY MARKET ENVIRONMENT

10th Athens Forum, April 24-25, 2007 Transmission network investment criteria CONCLUSIONS (cont.) TRANSMISSION DEVELOPMENT IN SEE MAY BE MORE EFFECTIVE AND FASTER IF FOLLOWING REQUESTS ARE TO BE FULFILLED: full independency of Transmission System Operators from production and supply companies acceleration of national authorization procedures for transmission facilities construction effective market design and stable regulatory framework introduction of market oriented signals for transmission investments attraction of private investments into transmission development coordination and full cooperation between SEE TSO’s in planning issues and establishment of stable financing mechanism that will support regionally important projects OFFICIAL REGIONAL TRANSMISSION PLANNING GROUP SEE transmission system issues collection of planning data planning scenarios common network models preparation (load flow, dynamic, short-circuit, probabilistic models) analyses comparison of candidate projects and defined criteria prioritization of the investments preparation of reports concerning SEE transmission system future bottlenecks congestion predictions and development suggestions

THANK FOR YOUR ATTENTION ENERGY INSTITUTE HRVOJE POZAR 10th Athens Forum, April 24-25, 2007 Transmission network investment criteria THANK FOR YOUR ATTENTION DAVOR BAJS ENERGY INSTITUTE HRVOJE POZAR ZAGREB, CROATIA dbajs@eihp.hr