European Gravitational Observatory25/01/20061 Alignment : Hardware & Software Status Henrich Heitmann, Julien Marque with the contribution of: INFN Frascati,

Slides:



Advertisements
Similar presentations
CAVITY LOCK ELECTRONICS Dan Sexton, Sirish Nanda, and Abdurahim Rakhman.
Advertisements

19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
1 Detector meeting, Cascina, Quadrant diode configuration ‘X’ or ‘+’ configuration? ISYS quadrant diodes.
ICS Test Environment Alexander Söderqvist Dec 9, 2014.
1 ILIAS WG1 meeting, Hannover, Alignment electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Power Stabilization of the 35W Reference System Frank Seifert, Patrick Kwee, Benno Willke, Karsten Danzmann Max-Planck-Institute for Gravitational Physics.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
1 LA electronics meeting, Cascina, Virgo alignment system overview ● Linear Alignment principle ● Optical configuration ● Present situation.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Interferometer Control Matt Evans …talk mostly taken from…
1 2 nd Virgo+ review, Cascina 17/10/2007 H. Heitmann New Quadrant Diodes New Quadrant Diodes Motivations & Requirements Status & Plans: see Nikhef talk.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
European Gravitational Observatory12/12/2005 WG1 Hannover 1 Mode Matching of the Fabry-Perrot cavities Julien Marque.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
G D LSC Changes in Preparation of High Power Operations Commissioning Meeting, May 5, 2003 Peter Fritschel, Daniel Sigg, Matt Evans.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Analysis of the Virgo runs sensitivities Raffaele Flaminio, Romain Gouaty, Edwige Tournefier Summary : - Introduction : goal of the study / Overview on.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
1 Commissioning meeting, Cascina, LA electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for optimized.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
20-22 July 2006 Maddalena Mantovani Automatic Alignment Noise Improvement M. Mantovani, H. Heitmann, J. Marque, P. Ruggi.
The VIRGO detection system
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Automation of the Lock Acquisition of the 3 km Arm Virgo Interferometer F. Carbognani for The Virgo Collaboration ICALEPCS - Geneva 14 October, 2005.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Upgrade activities at Clermont-Ferrand
Alignment status & plans
Homodyne readout of an interferometer with Signal Recycling
GEO – VIRGO joint noise hunting project
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Diode Laser Experiment
Presentation transcript:

European Gravitational Observatory25/01/20061 Alignment : Hardware & Software Status Henrich Heitmann, Julien Marque with the contribution of: INFN Frascati, Mario Favati, Dominique Le Galliot, Alain Masserot, Flavio Nocera, Tatania Zelenova

European Gravitational Observatory25/01/20062 Contents 1.Hardware review 2.Software review 3.Last upgrades a. Rearrangement of crate C34 b. The 9 th quadrant c. Global Control news d. The offset issue

European Gravitational Observatory25/01/ a. The quadrant (Frascati) Silicon photodiode, type EG&G YAG 444 sensitivity = 0.45 A/W DC power = 2.77 mW max transimpedance = 2 k  Bias voltage = 180 V

European Gravitational Observatory25/01/ b. Quadrant electronics (Frascati) Demodulation board Phase shifter board

European Gravitational Observatory25/01/ c. The translation stages (Frascati) 2 translation stages / quadrant (PI/M ) 1 translation stage control module : 4 translation stages control boards + quadrant power supply

European Gravitational Observatory25/01/ d. Flippers, Shutters (Frascati) Shutter used to measure DC offsets. - shutter control card by Frascati. Mirrors (or neutral densities) mounted on flip-mount to attenuate the light when diode used in 2 different configurations recombined/recycled (ratio of 1000 in DC power). - will install next week proper power supply. - need for their own electronics?

European Gravitational Observatory25/01/ a. The photodiode readout, translation stage control (LAPP/Napoli) Phase tuning, Gain control… Quadrant motion control…

European Gravitational Observatory25/01/ b. The Global Control (LAL) Compute correction signals to be sent to the DSP of each mirror to be applied to the reference mass

European Gravitational Observatory25/01/ c. The automation (LAPP/Napoli) Alignment automation consits of: prealignment of the direct beam, prealignment of the north and west arm cavities, closing linear alignment loops on all mirror.

European Gravitational Observatory25/01/ d. The alignment UI (EGO) Used for the commissioning of the linear alignment (need to migrate to Labview?) + automatic measurement and reconstruction of the optical matrix (Maddalena, Gabriele)

European Gravitational Observatory25/01/ a. Rearrangement of the electronics Operation needed to: -separate analogic fron digital electronics -accommodate the electronics for the 9 th quadrant +Hardware monitoring completed +New electronics for DC remote control gain

European Gravitational Observatory25/01/ b. The 9 th Quadrant Everything installed but the cables (+ problem of communication between a 3 rd translation stage driver and the rio to be fixed) No more spare!!!!! Need for a 10 th quadrant next year?

European Gravitational Observatory25/01/ c. Global Control news New features for the alignment part of GC: -All matrices on the fly, -Integrated filters in GC (output and input), -Possibility to inject coherent lines on all mirrors for matrix measurement comodity, Need to write some code still…

European Gravitational Observatory25/01/ d. The offset issue Where the offsets of AC error signals are coming from? a)DC offsets between different elements of the quadrant => beam not centered on diode => coupling with longitudinal signals => offset on alignment AC signals This should have been fixed by a better DC tuning b)Multireflection in the splitters of the optical setup => secondary beam combined with main beam => offset on alignment AC signal Optics with 3 degrees wedge have been acquired: will be installed soon