EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.

Slides:



Advertisements
Similar presentations
EPIC Calibration Meeting, Mallorca Update of EPIC pn noise suppression K. Dennerl, 2009 March 31 Mallorca, Spain, 2009 March 31 – April 1 EPIC Calibration.
Advertisements

EPIC Calibration Meeting, Mallorca Update of EPIC pn long-term monitoring K. Dennerl, 2009 March 31 Update of EPIC pn long-term monitoring Mallorca, Spain,
EPIC Calibration Meeting, Mallorca Low energy calibration with the Vela SNR K. Dennerl, 2009 March 31 Low energy calibration with the Vela SNR Mallorca,
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2003 Mar Temporal variation of the energy response determined with the internal calibration source.
% eff = (Wout / W in) *100 eff = (80 J / 100 J) * 100 = 80% W in = 75 N * 5 m = 375 J W out = 100 N * 3 m = 300 J eff = (300 J / 375 J) *100 = 80% W in.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 XRT Point Spread Function in Slewing Mode.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept Temporal variation of the energy response determined with the internal calibration.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 EPIC pn at low energies: LW mode Properties of EPIC pn at low energies: LW mode.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
The problem with double event patterns (M. Brusa, K. Dennerl – MPE) EPIC CAL/OPS meeting - MPE.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept offset map correction Spatial variation of the energy scale Energy correction for pixels.
Energy Calibration using SNRs: preliminary results Andrea Tiengo INAF, IASF-Milano Mallorca, 6 November 2007 EPIC Calibration Meeting.
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Tuebingen 03/02/03-06/02/03 MOS Cooling Results and Current Response Both MOS Cameras.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
The EPIC-pn spectral response Frank Haberl EPIC Cal meeting, Tübingen, February 2003 Status of the pn spectral response in SAS5.4.1 Latest developments.
NRCO #71: preliminary analysis of MOS data Andrea Tiengo INAF, IASF-Milano Mallorca, 8 April 2008 EPIC Calibration Meeting.
Mallorca EPIC Cal Meeting - February 2005 Darren Baskill: XMM project: MOS monitoring.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept Spatial variation of the energy scale Energy correction for pixels with an incorrect.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 Adjustment of spatial gain variations Adjustment of spatial gain variations of EPIC pn.
Suzaku XIS cal status XIS system Spaced-row Charge Injection (SCI) Contamination Hironori Matsumoto (Kyoto Univ.) Eric Miller (MIT)
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 Adjustment of spatial gain variations Adjustment of spatial gain variations of EPIC pn.
Darren Baskill 1/10 Gain, CTI, & CTI by column.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 CTI.. update for EPIC pn EPIC pn: Update on the CTI, the absolute energy scale and the energy.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 Properties of double event patterns.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2004 March Detector noise & Vela observations application to Vela observations EPIC pn detector.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal October Comparison of RGS Model for 1E to the HETG data 2.BI CCD CTI Correction.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Steve Sembay Mallorca 06/11/07 Report on three NRCO calibration observations On axis observation of absorbed Seyfert.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
EPIC Calibration Meeting, Mallorca Origin of gain offsets K. Dennerl, 2008 April 8 Origin of gain offsets: new insights from eROSITA calibration Mallorca,
XIS FM sensors cal. report Hiroshi Nakajima XIS
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
EPIC Calibration Meeting, Madrid Experience with combined Fe 55 /Vela SNR calibration K. Dennerl, 2010 March 23 Experience with combined Fe 55 / Vela SNR.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Семинар-презентация. Типография ДЕАЛ – это: 12-летний опыт работы и репутация надежного партнера Высокие оценки качества нашей работы Готовность к сложным.
Experience with combined Fe55 / Tycho SNR calibration
X-ray CCD with low noise charge injection.
February 12 – 19, 2018.
. - t !!l t. - 1f1f J - /\/\ - ' I __.
پایگاه داده فصل چهارم 21/35 نتیجه گیری نتایج آزمایش پایگاه داده مقدمه
: القسم 21 إجراء المقابلة التحفيزية.
الجزء 22:المقابلة التحفيزية
EPIC Calibration & Operations Meeting
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Update of EPIC pn long-term monitoring
Long-term trends in EPIC pn energy response
RESULTS FROM TYCHO SNR CALMEDIUM OBSERVATION
Calculus F 24 February 2012.
Calculus W 29 February 2012.
Presentation transcript:

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Mn-K CTI CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Mn-K CTI CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Mn-K CTI Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Al-K CTI Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn f FF Mn-K FWHM CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Mn-K FWHM CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn f FF Mn-K FWHM Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Al-K FWHM Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Mn-K Pos CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Mn-K Pos CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Mn-K Pos Quadrant 0 ± 5 eV

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Al-K Pos CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Al-K Pos CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn FF Al-K Pos Quadrant 0 ± 2.5 eV

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K CTI CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K CTI CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K CTI Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Al-K CTI Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K FWHM CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K FWHM CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K FWHM Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Al-K FWHM CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Al-K FWHM CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Al-K FWHM Quadrant 0

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K Pos CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K Pos CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Mn-K Pos Quadrant 0 ± 5 eV

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Al-K Pos CCD 1 - 6

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Al-K Pos CCD

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn eFF Al-K Pos Quadrant 0 ± 2.5 eV

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn