Ausgrid – Endeavour - Essential 8 December 2014 Networks NSW VINCE GRAHAM Chief Executive Officer PRESENTATION TO AER PRE-DETERMINATION CONFERENCE Menzies.

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

The Australian Energy Regulator Expenditure Forecast Assessment Guidelines General discussion of draft guidelines 2 September 2013.
State of the Nation - Charities Moira Protani. 2 The New Austerity State of the Nation Banks, FTSE 100s, Public bodies, Members of Parliament and charities.
22 August 2012 Regulating for productive efficiency – an assessment of the regulatory framework faced by Eskom Presented at the South African Economic.
Draft decision – initial views Rob McMillan December 2014.
AER’s Draft Decision for NSW distributors Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Interactions with incentive frameworks.
SLIDE 1 AEMO INDEPENDENT ASSESSMENT OF NSW & TAS NETWORKS July 2014 PRESENTED BY NATIONAL PLANNING.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
Victorian advanced metering infrastructure roll-out AMI budgets and charges AER draft determination Public forum Melbourne 21 August 2009.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
SA Power Networks Strategic Vegetation Management Alexandra Lewis, Vegetation Strategy Lead LGA Roads and Works Conference – 28 August 2014.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
1 GIE Annual Conference Madrid, November 2007 Investing in Europe‘s Future – the Role of Regulators David Halldearn Senior Adviser, European Affairs.
APACE Commissioning Event 30 April 2012 THE POLICE AND CRIME PLAN John Smith Chief Executive, Avon & Somerset Police Authority.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
1 ElectraNet SA Draft Regulatory Principles Workshop Asset Base ( Strengthening Incentives for Investment) 2 April 2004 Draft Regulatory Principles Workshop.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
NSW Public Forum Essential Energy’s Regulatory Proposal 10 July 2014 Gary Humphreys, Chief Operating Officer.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Auditing requirements for RINs and economic benchmarking data 9 October 2013.
Operational Risk Ruth Hanna Strong FIRMA Conference San Francisco March 31, 2010 © 2010 Wells Fargo Bank, N.A. All rights reserved. For public use.
Better Regulation workshop distribution outputs and environmental factors.
1 Public Forum ElectraNet revenue proposal 1 July 2013 to 30 June 2018 Mr Warwick Anderson General Manager, AER Network Regulation.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
Australian Energy Regulator Public Forum NSW electricity distribution revenue proposals July 2014.
The Australian Energy Regulator TasNetworks Public Forum Revenue Proposal 1 July 2014 to 30 June July 2014.
SAPN’s proposal: initial comments Bruce Mountain.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Independence 1 Jean Rothbarth Task Force Chair. Overview Recent activitiesRecent activities Review of significant changesReview of significant changes.
The Australian Energy Regulator Economic benchmarking DNSP outputs and environmental factors.
PALERANG COUNCIL Proposed Special Rate Variation 2016/ /21 Public Exhibition : Draft Long Term Financial Plan and Draft Delivery Program (as amended)
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Proposed Consolidation of Albury and Victorian Access Arrangements 10 November 2015.
Public Forum 10 December 2014 SAPN Regulatory Proposal Bev Hughson Consumer Challenge Panel Member.
The National Quality Standard The National Quality Standard (NQS) is a key aspect of the NQF and sets a national benchmark for early childhood education.
15 October 2013 Briefing on draft s 56G report on the effectiveness of information disclosure regulation at Christchurch Airport.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Economic regulation of electricity and gas network businesses Mark Feather, Acting Executive Director 23 November 2011.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
Top-down models of operating and capital expenditure.
Australian Energy Regulator Public Forum Qld electricity distribution revenue proposals December 2014.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Draft 2015 electricity distribution price-path reset Briefing for financial market analysts 4 July 2014 Sue Begg Commerce Commission.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
1 Electricity Distribution Price Review Metering Workshop 14 July 2005.
ATA Technical and Maintenance Conference Paul Retter, Chief Executive and Commissioner National Transport Commission Sal Petroccitto, Chief Executive Officer.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Education Funding: How Much is Enough?
Fair Go Rates System Dr Ron Ben-David Chairperson
2016 IPWEAvic Public Works Conference
Independent Review of Building Regulations and Fire Safety
Lockheed Martin Canada’s SMB Mentoring Program
Fair Go Rates System Dr Ron Ben-David Chairperson
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
Legislative Update: SB 2224 and SB 322 October 1, 2019.
Presentation transcript:

Ausgrid – Endeavour - Essential 8 December 2014 Networks NSW VINCE GRAHAM Chief Executive Officer PRESENTATION TO AER PRE-DETERMINATION CONFERENCE Menzies Hotel Sydney 14 Carrington Street 1.Legislative framework for revised and final determinations 2.NNSW / AER views on customer priorities 3.Points of agreement 4.NNSW issues of concern in AER Draft Determinations 5.NNSW revised regulatory proposals CONTENTS

│ Networks NSW Legislative framework for revised and final determinations 1 NSW Reliability Standards Fair Work Act WH&S Law National Electricity Law DIRECT OBLIGATION ON NNSW and AER REGULATORY OBLIGATION ON NNSW RECOGNISED BY NER 2

│ Networks NSW 3 Alternate views on customer priorities 2 NNSW Affordable 1 Reliable 2 Safe 3 AER Safe 1 Reliable 2 Affordable 3

│ Networks NSW 4 NNSW / AER points of agreement Benefits of robust and reliable benchmarking to inform but not determine capital and operating efficiency improvements 2 Need to continue to drive operating and capital efficiency improvements for benefit of NSW consumers 1 Need to address uncompetitive enterprise agreements across the industry including NSW 3 Need to align Final Determination with NEO, NEL and NER 4 3

│ Networks NSW 5 1)AER has not had sufficient regard to the “safety and reliability” criteria in the NEO, NEL or NER. Significant aggregate cuts to OPEX and REPEX have been made by the AER without consideration of the “safety and reliability” clauses of the OPEX and CAPEX criteria in the NER. 2)AER’s failure to publish the Benchmarking Report by 30 September 2014 has eliminated AEMC’s intent to have an assessment period before NSW draft determinations published at end of November Procedural fairness has been irrevocably compromised by AER. 3)AER’s strong reliance on an untested and unstable OPEX benchmarking model – outcomes not discussed with operators. Provisions of clause 8.7.4(c) of the NER have been ignored. NNSW – issues of concern 4

│ Networks NSW 6 4)Transitional “placeholder” determination for FY15 and a proposed “true up” for that year of $913m. (see slide 13) 5)Introduction of new regulatory principles. AER now proposes:  networks should reduce REPEX and accept greater risk and higher rates of network failure;  no longer recognising FWC certified enterprise agreements that the AER considers inefficient. This is in contrast to AER’s view for the recent SP AusNet determination - “SP AusNet’s Enterprise Agreement outcomes, nevertheless reflect the presumably free negotiations between SP AusNet, its employees and representative unions, and we are not privy to those negotiations.”  preference for more local service interruptions (blackouts) at local level with customer compensation. 6)Forecasts of consumption and relationship of consumption to network costs. NNSW – issues of concern (continued) 4

│ Networks NSW 7  AER has cut aggregate OPEX (up to 39%) and REPEX (up to 43%), and failed to undertake any evaluation of safety and network reliability impact. AER has declined to identify how aggregate cuts should be applied abrogating its responsibility under Commonwealth WH&S Act and ignoring findings of Ian Hanger’s QC Royal Commission into the Home Insulation Program (p.309).  Cuts would see $460m removed from NNSW vegetation and bushfire mitigation programs over the regulatory period. AER’s proposed funding cuts to vegetation programs have NOT been risk assessed for the 160,000km of line of NSW network in bushfire-prone areas.  Cuts would require immediate reduction of 4,600 employees including 750 apprentices without risk assessment of continuing network capability to maintain a safe and reliable network without a transition.  Increase in local service interruption (blackouts) proposed by AER will occur on hottest (or coldest) days not risk assessed by AER for 54,000 life support customers in NSW. Safety and reliability 4.1

│ Networks NSW 8 Retrospective OPEX reductions proposed by AER draft determination 4.1 Vegetation 19% Other 19% Labour 62% AER Cut 35% AER Approved 65% NNSW will not propose cuts to vegetation and bushfire risk management programs in revised proposals. NNSW FY14 AER Draft Determination

│ Networks NSW 9 1)AER’s failure to publish 1 st Benchmarking Report by 30 September 2014 breached NER, and is procedurally unfair to NSW distributors who must submit revised proposals to AER by 20 January AEMC proposed a two month period between the first annual benchmarking report and the AER’s NSW draft determinations. 2)Substantial change in benchmarking model approach from August 2014 draft to 27 November 2014 published report. The final report was not subject to consultation required under NER clause 8.7.4(c). 3)AER’s RIN data “unstable and unreliable”. (Economic Insights comment) 4)Illogical and unexplained model outcomes. (Slide 11) 5)NNSW cannot replicate how AER has bridged from benchmarking model outcomes for base year FY13 to its Draft Determinations for FY15 to FY19. Opex and benchmarking model – issues of concern 4.2

│ Networks NSW 10 The benchmarking process Inputs Model Interim “efficient frontier” and FY13 adjustments AER Draft Determination for OPEX Post modelling corrections AER’s “empirical considerations” Based on AER’s benchmarking RIN data 4.2 Obvious and significant differences in “basis of preparation” of RIN data. 30% correction to model outcomes required to make sense of ActewAGL model outcomes. Real problem with inconsistent RIN data. NNSW cannot readily understand how AER has applied other empirical considerations to bridge benchmarking model outcomes for FY13 and draft OPEX determinations for FY15 to FY19.

│ Networks NSW 11 Benchmarking anomalies  Economic Insights reports that using only AER’s RIN data “produced econometric estimates that were relatively unstable” (p.28) and “all models are by definition a simplification of reality and may not capture all relevant effects ”. (p.47)  Vegetation control is the second largest OPEX expense after labour (33% of OPEX for Essential Energy) but is not represented at all in the benchmarking model.  Arbitrary 30% adjustment to ActewAGL OPEX benchmarking outcomes because model outcomes didn’t make sense.  Excluding vegetation expense Essential Energy receives less OPEX (and similar REPEX) compared to Endeavour Energy for a network 540% longer with 450% more distribution substations.  If Essential Energy was taken to the “efficient frontier” it would have approximately $50m p.a. (net of vegetation expense) of operating expenditure to maintain their network supporting approximately 10% of the current workforce. THE LACK OF INDUSTRY CONSULTATON BY THE AER AND THE ILLOGICAL OUTCOMES OF THE AER’S BENCHMARKING MODEL NOW THREATEN TO DERAIL THE CREDIBILITY OF BENCHMARKING AS A REGULATORY TOOL 4.2

│ Networks NSW 12 Benchmarking model Networks NSW would encourage AER to have the Productivity Commission independently assess the methodology, reliability and robustness of their benchmarking model. 4.2

│ Networks NSW 13 Retrospectivity and FY15 “true up” NNSW total $ AER’s “efficient frontier” $913m 4.3

│ Networks NSW 14 CAPEX Prioritisation - Ausgrid 4.5

│ Networks NSW 15 CAPEX Prioritisation – Endeavour Energy 4.5

│ Networks NSW 16 CAPEX Prioritisation – Essential Energy 4.5

│ Networks NSW 17  Electricity consumption FY15 year to date October 2014 has increased by 2.3% compared to same period in FY14.  Variation in future electricity consumption will not impact network costs for: a)Opening RAB; b)WACC c)OPEX d)REPEX e)New network connections.  Variations in forecast energy consumption or peak demand have minimal impact on five year CAPEX program submitted by NNSW to the AER. Forecasts of consumption and relationship of consumption costs 4.6

│ Networks NSW 18  Will give a considered response to AER’s draft determinations and reassess our OPEX and CAPEX proposals in the interests of a safe, reliable and affordable network for consumers.  Will provide to the AER a safety and reliability risk assessment of the AER’s draft determinations against NEO, NEL, NER and WH&S Act.  Will continue to honour enterprise agreements certified by the Fair Work Commission.  Will reject AER being able to have regard to the OPEX benchmarking model because of: a)AER’s failure to follow NER to publish the first annual benchmarking report by 30 September 2014 and to consult on that report denying procedural fairness; b)defective and unreliable outcomes. NNSW – revised regulatory proposals 5

│ Networks NSW 19  Will not increase as proposed by the AER our risk profile for: a)Employee and public safety; b)Vegetation and bushfire risk management; c)Life support customers on local distribution networks.  Will maintain an ordered priority for: a)Safety b)Reliability c)Affordability NNSW – revised regulatory proposals (continued) 5

│ Networks NSW 20  Letter from Commissioner Greg Mullins, Fire & Rescue NSW dated 4 December 2014 to Vince Graham and Paula Conboy – extract: Letter from Commissioners Fire & Rescue NSW and NSW Rural Fire Service 5 “I fear that the impact of the draft determination could be a greater reliance on Fire & Rescue NSW in storm situations, due to smaller numbers of available utility staff and less vegetation management activities. As illustrated above, I am deeply concerned that this could lead directly to greater loss of life and property in the community due to fire crews being engaged for even longer periods at "wires down" incidents. I am hopeful that you will be able to provide some reassurance that this will not be the case. You may also be able to advise whether or not the AER plans to consult more widely on its draft determination, and whether detailed risk assessments of the broader impacts of its draft determination have or will be conducted. I am available at short notice to meet and discuss this significant issue.”  Letter from Commissioner Shane Fitzsimmons, NSW Rural Fire Service dated 5 December 2014 to Vince Graham and Paula Conboy – extract: “It would appear that the broader ramifications of the draft determinations have not been subject to a detailed risk assessment by the AER and I strongly encourage the AER to undertake detailed risk assessments of the broader impacts of these determinations in their current form.”