EoO or EoI and is there another way to prevent discrimination? BEREC roundtable on Equivalence of Inputs Bruxelles, April 29th 2014.

Slides:



Advertisements
Similar presentations
Nairobi, Kenya, 26 – 27July 2010 Maintaining Equipment Standards to ensure good QoS Mwende Njiraini Engineer I/NT/LCS Communications Commission of Kenya.
Advertisements

Equivalence of output in Italy Brussels 29 April 2014 Davide Gallino Head of Unit, Equivalence of access Electronic communications Networks and Services.
1 Price squeeze tests in electronic communications: ARCEPs experience Competition Law and Electronic Communications Brussels, June 19, 2008.
Business Drivers for IPv6 John King
EuroPEX position on Market Transparency and practical example from Nordic Market Baltic Electricity Mini-Forum, Riga, 24th April Pasi Kuokkanen Nord Pool.
EoI was introduced with Functional Separation
Telecoms: a trendy investment target again? The way forward Can regulation help? Budapest, December 4th 2013.
REGIONAL LIBERALIZATION ON SERVICES IN ACCORDANCE WITH MULTILATERAL DISCIPLINES Commercial Diplomacy Programme UNCTAD.
Basic Telecom Sector Reform Issues: Competition, Tariffs & Interconnection Hank Intven Seminar on ICT Policy Reform and Rural Communication Infrastructure.
By Roxana Saplacan Presented by Ugonna Nwaokwu.  The traditional view of electricity distribution is that it is a natural monopoly. Few authors have.
Putting an end to non-price discrimination – the role of EOI
Broadband to everybody!? Torstein Olsen Director Norwegian Post and Telecommunications Authority LLU Conference, Bucharest, 5 July 2005.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT VERTICAL SEPARATION OF RAILWAY INFRASTRUCTURE - DOES IT ALWAYS MAKE SENSE? Jeremy Drew.
Effective competition review : Mobile February 2001.
Thank you.
1 / 24 CS 425/625 Software Engineering Software Evolution Based on Chapter 21 of the textbook [SE-8] Ian Sommerville, Software Engineering, 8 th Ed., Addison-Wesley,
Viewpoint Consulting – Committed to your success.
Effective systems development requires a team effort from stakeholders, users, managers, systems development specialists, and various support personnel,
Identity and Access Management IAM A Preview. 2 Goal To design and implement an identity and access management (IAM) middleware infrastructure that –
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
HFSD User Involvement Whilst the need to involve users in the SAD process is accepted to a greater or less extent in all design methods - the decision.
Development of BB markets Access markets (M4 & M5) and remedies applied Linda Paršova 10 TH BALTIC ELECTRONIC COMMUNICATIONS AND POSTAL SERVICES REGULATORS’
Portfolio Selection of IT Service Products – Case Study Antti Vikman
Case A285 Infostrada/Telecom Italia- Tecnologia ADSL.
Telecom Italia’s undertakings: building up an operational separation model Equivalence and Regulatory Affairs Market Analyses, Regulatory Economics & International.
Microeconomics and Corporate Analysis State Intervention, Public choice and Economic Regulation Lecture Slides Rui Baptista.
1 ICT 5: Driving demand - Accelerating adoption: Regulator’s role Daniel Rosenne Chairman, Tadiran Telecom Communications Services, Israel October 7 th,
Supplier Selection & Evaluation
©Ofcom NGN-based competition: An Ofcom perspective Dr Stephen Unger Director of Telecoms Technology 24 March 2005.
Learn how at centerpartners.com. An Insight Throughout our 13 years in business we have always thought of ourselves as more than a “call center”. To us,
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
BT’s Undertakings to Ofcom: An overview
Ofcom’s ‘Strategic Review’ of telecoms, 2004/5 Martin Fransman Professor of Economics and Founder-Director Institute for Japanese-European Technology Studies.
TMitTI 1 © Sakari Luukkainen Content Previous technology cycle Analog Modems ISDN Technology cycle of fixed broadband Case ADSL Case DOCSIS Conclusion.
AGCOM Italian Regulation Authority 1 network separation the italian case Stefano Mannoni AGCOM Commissioner.
Broadband Internet Current and future challenges for regulators: a selection Athens – June 1, 2007 Philippe Defraigne Cullen International
BEREC – Examining EoI Jon Furmston, Director Equality of Access Office.
1 ©2006 MDM Bank – Strategic Planning Department IBLF Improving financial literacy and responsible lending: the MDM experience Michelangelo Mazzarelli.
Imposing access obligations under the new framework Karen Hardy.
Implementing Oftel’s Broadband Strategy John Russell 12 July 2002.
CONNEROTTE_BE_ALPHA6_BLOCK1.PPT Barcelona May Implementation and results from Deregulation 1.Introduction 2.Consequences of the liberalization.
Proposed Tactical Framework Telecomm Regulation Onno W. Purbo
Local Loop Unbundling PRESENTATION TO THE PORTFOLIO COMMITTEE 6 th JUNE 2007.
Can Big Business be Controlled? Regulation.
Internet Policy Day 3 - Workshop Session No. 5 The impact of telecomms regulation Prepared for CTO by Link Centre, Witwatersrand University, South Africa.
CE 726 STRATEGIC CAPABILITY. ASSESSMENT OF STRATEGIC CAPABILITY.
1 1Page Interconnection and Facilities Leasing Discussion 1. Introduction and Objectives 2. Chapter 10 Market Review Process - Overview 3. Relevant markets,
Effective regulatory regimes and impact on investments in the telecom sector: A perspective from ECTA European Competitive Telecommunications Association.
1 IT Technical Support The impact of organisational policies on diagnosis and repair.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Lars Kjølbye, Head of Unit, DG COMP B-1 22 February 2007 Competition Directorate -General The Energy Sector Inquiry Identified problems and future action.
Fixed-Mobile Interconnection Briefing Paper ITU Fixed-Mobile Interconnection Workshop Geneva, 20 September 2000.
Association of Competitive Telecom Operators IPv6 & TELCOs Workshop On IPv6 New Delhi 21 st July 2009.
Telecom Unclassified Fault Prioritisation Telecom, Auckland 30 th October 2007 Telecom Wholesale Industry Consultation Seminar.
Coping With Major Regulatory Change Functional Separation in the UK Peter McCarthy-Ward Director, Equivalence.
Talent Acquisition, Staffing, Recruitment, Executive Search.
Local loop Unbundling Dr. ZOUAKIA Rochdi ANRT. Presentation outline Definition of Unbundling local loop (LLU) Importance of LLU Types of LLU : Description.
Pros& cons Dr. Musab Barakat Ahmed Ali PhD.;FCCA;FCMI Chartered Certified Accountant Practicing firm Barakat&co Senior partner & CEO Consultant National.
Copyright © 2013 OneNeck IT Services Corporation. All Rights Reserved. 1 Cloud Enablement For Microsoft Dynamics Cloud Enablement for Dynamics AX and Use.
P3 Business Analysis. 2 Section D: Business Process Change D1. The role of process and process change initiatives D2. Improving the process of the organisation.
12 March Workshop on Multimedia Convergence ITU-T Geneva, 12 March 2002 ETSI’s Approach to IPCablecom Standardization Jim Price, C.Eng, M.I.E.E.
CO$T TO COMMUNICATE 20 SEPTEMBER Dominic Cull ISPA Regulatory advisor
C21-BT 21CN: the next steps A global innovation platform
Why LibreOffice Certification Name Surname
Innovation in the Access Network- Our evolving portfolio and ecosystem
Regulation of NGA networks – the EU experience
PRESENTATION OF MONTENEGRO
Case IT/2005/0260.
The new European Electronic Communications Code DEEP-IN Project Inaugural Conference 24 June 2019 Carlota Reyners Fontana, Head of Unit B5 European Commission,
Very High Capacity and 5G Networks: from the EU code to the EU market
Presentation transcript:

EoO or EoI and is there another way to prevent discrimination? BEREC roundtable on Equivalence of Inputs Bruxelles, April 29th 2014

EoO proved ineffective in ensuring technical non discrimination in Italy EoO implementation started in 2008 following Telecom Italia’s undertakings, to avoid sanctions for discriminatory behaviour in activation of services In 2009, TI undertakings were transposed into remedies within the second round of analysis of markets 1, 4 and 5 2 EoO does not involve the use of the same processes and interfaces the vertically integrated incumbent operator uses internally for activation and fault repair After 5 years, experience demonstrates that the retail arm of the vertically integrated incumbent operator enjoys a de-facto preferential treatment, in terms of lead-time and effectiveness for activation/fault repair Incentives and capability to discriminate not eliminated!

Discrimination is in-built in the EoO approach: line activation PG. 3 TI Retail Open Access TI Wholesale Final customer Altnets Final customer BT Retail Final customer Final customer Altnets Openreach provides wholesale services to internal and external customers through the same processes and systems, on the same timescale  In Italy, different processes and systems are used for the activation of wholesale products: Altnets orders have to be processed by TI Wholesale first, resulting into increased lead- time compared to activation for TI’s retail arm Open Access Provisioning leadtime for Altnets Provisioning leadtime for TI retail

Lead-time for Altnets activation further increased by the “two-step“ process PG. 4 Two step activation process: longer time and higher complexity TI sends its technician to configure the line and activate it TI sends its technician to configure the line After line configuration by TI, Altnets’ technician steps in and activates the line The inability to control the activation process end-to-end is a huge issue for Altnets, especially in the transition to ultrabroadband services Activation for TI prospect customers Activation for Altnets’ prospect customers Activation leadtime - TI Activation leadtime - Altnets

The use of different databases and interfaces leads to further rejections of requested activations Altnets recently found out that the database through which they get information on whether a prospect customer is reached by a TI line -and therefore whether the service can be provided through LLU or WBA- was incomplete for about 10% of available lines. Fastweb filed a complaint on rejections by Telecom Italia for «impossibility to provide ADSL services for presence of MUX equipment» on which TI had activated ADSL clients. The outcome was that in over 20% of cases, there was a «disalignment of databases» which led to the unjustified rejection. In many cases, Altnets have not been able to activate a service for a prospect customer because the system did not detect the presence of a copper line in their premises, whereas TI was able to connect the same customer having a more complete database available The use of different databases between TI retail and Altnets has led to a significant part of the market not to be addressed by competition PG. 5

Telecom Italia fault repair is always “first time right“, whereas for Altnets it may take several field interventions, as part of the access network is under the responsability of Telecom Italia and other under the responsability of Altnets FW TI Fault in Altnet’s part of the newtork fault in TI’s part of the network Second field intervention Fault repair for TI customers Fault repair for Altnets customers TI FW First field intervention TI If the fault diagnose was wrong in the first intervention Discrimination in fault repair First intervention Not even EoI can resolve this kind of discrimination FW Check FW Check

Strategic use of internal/external workforce Telecom internal workforce External workforce Telecom internal workforce External workforce Telecom Italia extensively uses external contractors for activation and fault repair When TI uses external contractors to activate and repair Altnets line, Altnets can hire the same contractors and simplify/speed-up their activation/repair. Telecom Italia is increasingly and strategically witdrawing the use of external contractors for activation and fault repair of the Altnet lines in specific areas, thus affecting the quality of services that Altnets can offer to their customers After March 2013 in Milan and Sicily, upon the elimination of external workforce for the fault repair of LLU lines, average time to repair a fault for Altnets has doubled

Persistent discriminatory behaviour recognized by competition authority PG. 8 The Italian Competition Authority launched an investigation to TI discriminatory behaviours in June The complaint concerned the high number of rejections of Altnets’ requests for activations of wholesale access lines to provide services to end users (technical boycotting) AGCM found that from 2009 to 2011: TI had unfairly rejected a number of requests for activation of wholesale services TI treated requests coming from other operators in a discriminatory manner compared to those originating from its internal divisions by obstructing competitors' access to its infrastructure and making service access activations significantly more difficult AGCM imposed a €88.2m fine on TI

The ineffective or delayed fault resolution is the major reason for customer churn 9 Fastweb customer churn (customer that have experienced a fault) Fonte: Dati Fastweb Fault solved <72hFault solved >72h Multiple faults

Unbundling of fault repair and activation services is feasible, easy and cost effective Incumbents in many countries already outsource these services to external contractors Unbundling would simply involve the capability for the Altnet to negotiate contracts directly with the certified technicians and manage activation and fault repairs end-to-end Providing the Altnets the capability to manage end- to-end the activation and fault repair processes is the real answer to technical discrimination issues Incumbent MDF NTP CPE segment of access network under the responsibility of incumbent segment under the responsibility of Altnets CABINET ONE CONTRACTOR CARRIES OUT THE FAULT REPAIR ACTIVITIES END-TO-END UNBUNDLING OF ACTIVATION/REPAIR ACTIVITIES PERFORMED BY INCUMBENT WORKFORCE EXISTING APPROACH ACTIVITIES CARRIED OUT BY ALTNET CUSTOMER PREMISE

Unbundling of services for SLU is even more critical No need for intervention at MDF (less security issues) No impact on incumbent workforce (the percentage of SLU activation/repair will be 5% of total activities) Effectiveness and quality in the activation of ultrabroadband services will be key in stimulating the market!! Fastweb is currently engaged in a massive migration of its customer base to SLU-based services, to enable ultra-broadband services to existing and new customers

Lessons to be drawn PG. 12 In Italy EoO has proved to be: Ineffective: as discrimination by the SMP operator has been persistent under EoO regime; Expensive: as it has required the supervision of two public authorities (AGCM and AGCOM) plus the establishment of an ad hoc Body of Surveillance (Organo di Vigilanza); Highly damaging: It has damaged competition and investments, consequently consumer welfare and innovation Unbundling of activation and fault repair services can be highly cost/time effective and create huge advantages for the competition and for end users

Introduce competition on quality of service offered to end users The impossibility of Altnets to fully control quality of services provided on provisioning and maintenance of wholesale access lines translates into: Absence of differentiation of services to the end users An inefficient and cumbersome process to provide wholesale services (ie. longer provisioning times, greater costs for altnets and poor service for end users) Possible discriminatory behaviour by incumbents No incentive/possibility of competition on the quality of service offered No competitive pressure on the incumbent to improve quality of services 13 Impossibility of Altnets to manage directly activation and fault repair services has a direct impact on the competitiveness of the market and on end users