Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.

Slides:



Advertisements
Similar presentations
Checking & Corrective Action
Advertisements

1. (c) Alan Rowley Associates Laboratory Accreditation Dr Alan G Rowley Quality Policy based on Quality Objectives Quality Management System Communicate.
ISO 9001:2000 Documentation Requirements
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Environmental Management System (EMS)
DOCUMENTATION REQUIREMENTS Based on ISO 9001:2008
Understanding the Requirements Qimpro Standards Organization
More CMM Part Two : Details.
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Management System
OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY ASSURANCE PROCEDURES & ACCREDITATION An Overview OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY.
Transmille Training Quality System.
Quality Assurance/Quality Control Policy
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ASPEC Internal Auditor Training Version
Technical requirements  Sampling  Analysis  Reporting of the results.
ISO 9000 Certification ISO 9001 and ISO
Quality Management Systems (QMS) for Laboratories Preparation and Implementation Requirements of ISO/IEC and ISO 9000 Elizabeth M. Dax National.
Quality Representative Training Version
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
Instructions and forms
Photocopies Occasionally need uncontrolled copies
4. Quality Management System (QMS)
CPA is a UKAS company The Assessment Process 2014 Seminars.
LABORATORY MANAGEMENT SYSTEM
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
Effectively applying ISO9001:2000 clauses 5 and 8
ISO/IEC A review of the new standard for laboratory accreditation
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
Introduction to ISO New and modified requirements.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
ISO 14001:2004, Environmental Management System
© EAGLE Registrations Inc CONFIDENTIAL 1 Experience Speaks of Lessons Learned ASQ Illiana February 15, 2011.
Hazards Identification and Risk Assessment
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
ASPEC Quality Representative Internal Auditor Training Version
Requirements for the Competence of Providers of Proficiency Testing Schemes ILAC Guide 13:2000 – supplementing ISO Guides 43-1 and 43-2.
SAAMF Roadshow Durban CSIR NML Eddie Tarnow Metrologist: Torque & Automotive 14 June 2006 ISO/TS 16949:2002 certification – Meeting the requirements of.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Internal Auditing ISO 9001:2015
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
1 City of Shelby Environmental Management System -QUALITY ALWAYS- IT’S ABOUT THE PEOPLE Presented by: Cynthia I.Walters Presented by: Cynthia I.Walters.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
2016 MFRPS: Changes To Standard 10 Guy F. Delius, R. S. CSO Food and Drug Administration Office Of Partnerships Standards Implementation Staff February.
? Training removes doubt, instills confidence, and lays the foundation for everyone’s skill and experience level.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Table 1. The Five Medical Laboratory Case Studies Jan Martin et al. Transnational Evaluation of a New Continuing Professional Development Activity for.
1 IBMS Scottish Quality Management Discussion Group Meeting Perth – 20 th May 2008.
JPPF MEETING th MARCH 2013 BIRCHWOOD CONFERENCE CENTRE JPPF March S.GOVENDER.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
How to conduct Effective Stage-1 Audit
TNI 2016 – Internal Audits BACWA Lab Committee ~ August 8, 2018.
ISO 9001:2008 – Key Changes NOTE: use of this webinar depends on the instructor/speaker using the text in the notes of the slides!! Examples and speaking.
Presentation transcript:

Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l Managed by the Quality Manager l Process managed using corrective action form l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l Managed by the Quality Manager l Process managed using corrective action form

1.CAR Raised 2.CAR logged 3.Investigate root cause of problem and identify CA Management Review Major change ? 5.CA effective? 4.Implement CA, Update documentation EndEnd Problem Solving Team Corrective and Preventive Action Process Corrective and Preventive Action Process NoNoYesYes

1. Raising a Corrective or Preventive Action l Audits (internal and external) l Observations by staff l Management review l Client feedback l Audits (internal and external) l Observations by staff l Management review l Client feedback

2. Recording the CAR l Initiate CAR form l Record corrective or preventive action  categorise l Quality Manager to  log in CAR  allocate unique CAR identification number l Initiate CAR form l Record corrective or preventive action  categorise l Quality Manager to  log in CAR  allocate unique CAR identification number

3.1 Investigating the Corrective Action l Investigate root cause of the problem  why did the problem occur ? l Potential causes:  samples  methods and procedures  staff skills and training  equipment and calibration l Record CAR l Investigate root cause of the problem  why did the problem occur ? l Potential causes:  samples  methods and procedures  staff skills and training  equipment and calibration l Record CAR

3.2 Identify Possible Corrective Action l Identify potential corrective action  what would prevent the problem from happening again ? l Problem solving team  if many staff or departments affected  if major non-conformance l Record on CAR l Identify potential corrective action  what would prevent the problem from happening again ? l Problem solving team  if many staff or departments affected  if major non-conformance l Record on CAR

4. Implement Corrective Action l Implement the action/s  make changes to the system l Record l Update documentation l Implement the action/s  make changes to the system l Record l Update documentation

5. Was Corrective Action Effective ? l Verify and record effectiveness  has it prevented the problem from occurring again ?  follow up  additional audits l Verify and record effectiveness  has it prevented the problem from occurring again ?  follow up  additional audits

Equipment Calibration

Outline l Requirements for calibration l Equipment identification l Calibration and maintenance records l Equipment documentation l Subcontractors l Benefits of calibration and maintenance l Requirements for calibration l Equipment identification l Calibration and maintenance records l Equipment documentation l Subcontractors l Benefits of calibration and maintenance

Equipment Calibration Required: l By ISO 9000  clause and l By ISO/IEC  clauses 5.5 and 5.6 l By ISO 9000  clause and l By ISO/IEC  clauses 5.5 and 5.6

Requirements of ISO/IEC l Unique number identifying each piece of equipment l Routinely maintain & calibrate l Document maintenance procedures  make them easily accessible l Unique number identifying each piece of equipment l Routinely maintain & calibrate l Document maintenance procedures  make them easily accessible

Requirements of ISO/IEC l Measurements traceable to national measurement standards l Results must be accurate and clear l File all records appropriately l Measurements traceable to national measurement standards l Results must be accurate and clear l File all records appropriately

Equipment Identification l Assign unique identification number to each piece of equipment & reference material l May be equipment serial number  OR number assigned by laboratory l Display identification number on the equipment in a visible area l Assign unique identification number to each piece of equipment & reference material l May be equipment serial number  OR number assigned by laboratory l Display identification number on the equipment in a visible area

Equipment Records & Maintenance l Maintain records of:  Equipment name, unique number  Date received, condition upon installation  Maintenance history, future maintenance dates l Service/calibrate equipment & reference materials at regular intervals - per NATA specifications l Maintain records of:  Equipment name, unique number  Date received, condition upon installation  Maintenance history, future maintenance dates l Service/calibrate equipment & reference materials at regular intervals - per NATA specifications

Documentation l Each piece of equipment must have full documentation of:  Instructions for proper use  Maintenance procedure l Documentation accessible to all staff  More than one copy may be required l Each piece of equipment must have full documentation of:  Instructions for proper use  Maintenance procedure l Documentation accessible to all staff  More than one copy may be required

Traceability l Calibration of reference material & test equipment must be traceable to national measurement standards

Results l As calibration certificate, test report or test certificate l Accurate and clear  stating any measurement uncertainty l Include information necessary for interpretation of the calibration l As calibration certificate, test report or test certificate l Accurate and clear  stating any measurement uncertainty l Include information necessary for interpretation of the calibration

Records l Must include:  which equipment was calibrated  who performed calibration l File records in a safe location l Must include:  which equipment was calibrated  who performed calibration l File records in a safe location

Sub-Contractors l Calibrations by sub-contractors must also comply as above l Do not assume sub-contractor:  will follow necessary procedures  is authorised to calibrate a particular piece of equipment l Calibrations by sub-contractors must also comply as above l Do not assume sub-contractor:  will follow necessary procedures  is authorised to calibrate a particular piece of equipment

Benefits of a Maintenance System l Ensures that equipment operates within specifications l Maintains uniformity and quality of testing l Identifies potential problems before they become major  Reduces costs l Ensures that equipment operates within specifications l Maintains uniformity and quality of testing l Identifies potential problems before they become major  Reduces costs

Preventive Maintenance at NRL l Procedures, Work Instructions  Document calibration steps for each piece of equipment  List limitations and acceptability criteria l Procedures, Work Instructions  Document calibration steps for each piece of equipment  List limitations and acceptability criteria

Preventive Maintenance at NRL l In-house application  developed in Microsoft Access  inventory of critical equipment  calibration histories  help identify patterns of non-conformities  maintenance schedule  ensures no equipment is overlooked l In-house application  developed in Microsoft Access  inventory of critical equipment  calibration histories  help identify patterns of non-conformities  maintenance schedule  ensures no equipment is overlooked

Preventive Maintenance at NRL l Confirmation sticker on each piece of equipment shows status  green sticker- confirmed for use  within dates  red sticker - decommissioned  must not be used  additional information l Confirmation sticker on each piece of equipment shows status  green sticker- confirmed for use  within dates  red sticker - decommissioned  must not be used  additional information

Preventive Maintenance at NRL l Original calibration records & test results  filed by equipment category & unique identifier  archived at end of year  accessible for audits l Original calibration records & test results  filed by equipment category & unique identifier  archived at end of year  accessible for audits

Preventive Maintenance at NRL l Contractors informed of requirements l Where possible yearly contracts are established and revised to ensure compliance l Contractors informed of requirements l Where possible yearly contracts are established and revised to ensure compliance

Outcomes l Reproducibility in testing l Confidence in equipment l Reduced errors & down-time l Reduced cost of equipment break- downs & replacements l Reproducibility in testing l Confidence in equipment l Reduced errors & down-time l Reduced cost of equipment break- downs & replacements

Management Review

Outline l What is required l What happens l Inputs into the review l Outputs l What is required l What happens l Inputs into the review l Outputs

Management Review Required: l By ISO 9000  clause l By ISO/IEC  clause 4.14 l By ISO 9000  clause l By ISO/IEC  clause 4.14

Management Review l Review:  Effectiveness of quality system  Continued suitability  Resourcing  Training  Make necessary changes l Review:  Effectiveness of quality system  Continued suitability  Resourcing  Training  Make necessary changes

Management Review l Input (Quality Manager’s report):  External and internal audits  Corrective and preventive actions  Customer complaints  Interlaboratory comparisons l Input (Quality Manager’s report):  External and internal audits  Corrective and preventive actions  Customer complaints  Interlaboratory comparisons

Management Review l Consider impact of any changes in functions or external environment l Records must be kept l Consider impact of any changes in functions or external environment l Records must be kept

Management Review l By Whom?  Senior management  People who can direct change  Quality Manager involved l By Whom?  Senior management  People who can direct change  Quality Manager involved

Management Review l NRL approach:  Review by Director, Senior Scientist, Quality Manager (6 times/year)  Supplemented by weekly team meetings  Different for different organisations l NRL approach:  Review by Director, Senior Scientist, Quality Manager (6 times/year)  Supplemented by weekly team meetings  Different for different organisations

Management Review l General Requirements for Registration “The effectiveness of the quality system shall be reviewed by management at least once per year.” l General Requirements for Registration “The effectiveness of the quality system shall be reviewed by management at least once per year.”

Management Review l ISO/IEC “in accordance with a predetermined schedule” “A typical period for conducting a management review is once every 12 months” l ISO/IEC “in accordance with a predetermined schedule” “A typical period for conducting a management review is once every 12 months”

Management Review l Keep changes rational l Integrate with other management processes where appropriate and possible l Keep changes rational l Integrate with other management processes where appropriate and possible

Management Review l Outcomes:  Minutes with actions, responsibilities  Corrective action as appropriate l Outcomes:  Minutes with actions, responsibilities  Corrective action as appropriate

Review of the Aims of the QMS Section l To clarify the requirements of a Quality Management System (QMS)

Expected Outcomes of the QMS Section l Know how to meet the requirements of ISO/IEC or ISO 9001 by implementing a practical, easy to maintain QMS