FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
GLOBALink/VHF Digital Link Mode 2
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
1 Federal Aviation Administration Data Communications FAA NextGen Data Communications exhibit and FAA NextGen air traffic control simulators (left) at.
FAA/JCAB ATN & AMHS Trial Varadero, Cuba May 2002 Presentation ATN 3.2 by H. Tran.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
CPDLC Build 1A and CPDLC Benefits Timothy R. Hancock CPDLC Operations Lead FAA Free Flight Program Office ATN 2002 London, England September 24, 2002.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Next Generation Air/Ground Communications (NEXCOM) Program Presented to Airborne Internet Collaboration Group Reston VA April 17, 2003 Dieter Thigpen Integrated.
Federal Aviation Administration – Oceanic & Offshore Program 1 Nancy Graham International Technical Representative - Europe, Africa and Middle East ATN2002.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
ATN September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
EUROCONTROL/FAA ATM R&D June, Big Iron Almira Williams and Stéphane Mondoloni, Ph.D. CSSI, Inc. Washington D.C. Diana Liang, Steve Bradford, and.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
Air Traffic Control Communication
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Ground to Ground ATN Implementation Plan
NEXCOM Next Generation Air/Ground Communications
International Civil Aviation Organization
Presented by Thales Avionics ATN 2003 London, UK September 2003
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
NEXCOM Next Generation Air/Ground Communications Appendix G
Data Communications Program
NEXCOM by Bruce Eckstein FAA.
NEXCOM by Bruce Eckstein FAA.
FAA/JCAB ATN & AMHS Trial
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
An Airline Perspective
Presentation transcript:

FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999

Overview Why CPDLC? Data Link Issues Team FAA JRC Investment Issues Build I / IA Summaries CPDLC Integration Integrated Schedule (Build I / ATN) Human Factors

Why Controller Pilot Data Link Communications? Controller Pilot Data Link Communications (CPDLC) will provide data communications for Air Traffic Control (ATC) operations to supplement the existing air-to-ground (A/G) voice communications and support improvements in airspace use and capacity. CPDLC will: –Provide for a more dynamic and efficient A/G information exchange mechanism –Provide an additional means of communication between pilots and controllers –Reduce congestion on the voice channels which limits ATC effectiveness thereby reducing delays –Reduce operational errors resulting from misunderstood instructions and read-back errors

John Kern Data Link Issues Team Created by Jane Garvey’s NAS Modernization Task Force Objective: To develop a Federal Aviation Administration (FAA)/Industry plan for Aeronautical Data Link (ADL) evolution and implementation path with En Route CPDLC being the first project selected for review.

FAA / Industry Consensus Plan The consensus reached uses the following phased approach for developing and implementing ICAO’s standard En Route Aeronautical Telecommunication Network (ATN) compliant data link services: Build I (domestic CPDLC) Four ATN compliant operational services Use VHF Digital Link Mode 2 (VDL-2) as A/G Sub- network Build IA (enhanced domestic CPDLC) Increases ATN compliant services Use VDL-2 as A/G Sub-network

FAA / Industry Consensus Plan (Continued) Build II (domestic/international CPDLC) Increases ATN compliant services (more complex 3-4D messages and downlinks) Use VDL-2 as A/G Sub-network Build III ATN message set Integration with Decision Support Systems Use Next Generation Air/Ground Communications (NEXCOM) as A/G Sub-network

En Route Controller Pilot Data Link Communications Implementation Path CPDLC II CPDLC I/IA Avionics CPDLC III CPDLC I CPDLC IA CPDLC II Keysite National Deployment National Deployment Ground CPDLC III Keysite Note: CPDLC II and CPDLC III are not baselined NEXCOM Analog VoiceNEXCOM Digital Voice A/G Subnetwork NEXCOM Digital Data VDL-2

FAA Investment Decision FAA Investment Decision on 10/30/98 –En Route CPDLC Build I (key site only) –En Route CPDLC Build IA (national deployment) Additional Investment Decisions required prior to beginning Builds II & III

En Route Controller Pilot Data Link Communications Build I Summary Single-site deployment –Key Site: Miami Air Route Traffic Control Center (ARTCC) –Keysite Initial Operational Capability (IOC): 6/02 Provides 4 operational services –Transfer of Communication –Initial Contact –Altimeter Setting –Informational Free text menu capability built by supervisor inputs Uses VDL-2 as A/G subnetwork Includes Human Factors demonstration at FAA Tech Center by 12/00 American Airlines will be the launch airline

En Route Controller Pilot Data Link Communications Build IA Summary National deployment to all 20 domestic ARTCCs Key site IOC: 6/03 Miami –National deployment –Begin installation: 1/04 –Complete installation: 12/04 Increase the message set to accommodate assignment of speeds, headings, altitudes as well as a route clearance function A capability to handle pilot-initiated altitude requests Uses VDL-2 as A/G Sub-network Anticipate widespread industry participation

Who Owns What VDL-2 Ground Stations VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers

VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Who Owns What

VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Who Owns What

VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR Telecommunications Network Planning and Engineering Division AOP-400 NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Who Owns What

VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR Telecommunications Network Planning and Engineering Division AOP-400 NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router Telecommunications Support and International Communications Division AOP-600 G/G ATN Router Who Owns What

VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR Telecommunications Network Planning and Engineering Division AOP-400 NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router Telecommunications Support and International Communications Division AOP-600 G/G ATN Router Aeronautical Data Link Product Team AND-370 Who Owns What

VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I En Route IPT AUA-200 DLAP HOST Router DSR Telecommunications Network Planning and Engineering Division AOP-400 NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router Telecommunications Support and International Communications Division AOP-600 G/G ATN Router Aeronautical Data Link Product Team AND-370 Who Owns What

What is Changing VDL-2 Ground Stations Display CMU/ATSU ATN compliant VDR Transceiver Service Provider DLAP HOST Router DSR NADIN II (PSN) NAS LANHID CMA NS M New & Modified Software New HW & SW New HW & SW FAA En Route CPDLC I&IA Ground System A/G ATN Router G/G ATN Router G/G ATN Router New Equipment Software Changes Software Changes, Keyboard & Site Adaptation Changes ATN Network Manager New Equipment

Where Located VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router

Miami Airspace VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Where Located

767 Aircraft Miami Airspace VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Where Located

767 Aircraft Miami Airspace Atlanta NNCC Salt Lake City NNCC VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Where Located

767 Aircraft Miami Airspace Miami ARTCC Atlanta NNCC Salt Lake City NNCC VDL-2 Ground Stations Display CMU/ATSU (ATN compliant) VDR Multi-Mode Transceivers VDL-2 CPDLC I DLAP HOST Router DSR NADIN II (PSN) NAS LAN HID CMA Location TBD FAA En Route CPDLC Ground System A/G ATN Router G/G ATN Router G/G ATN Router Where Located

Data Link Integrated Schedule Development (Build I/ATN) Major players have worked together to develop an Integrated Schedule ARINC AMERICAN ATNSI FAA CSC ACI Other Contractors Boeing Rockwell Collins Other Contractors Other Contractors Major Data Link Partners –American Airlines –FAA –ARINC –ATN Systems Inc (ATNSI)/ Aeronautical Communications International (ACI)

Human Factors Demonstrated limited CPDLC capability on DSR platform Ground Human Factors Studies –Initial CPDLC I study completed 3/99 –CPDLC IA Procedures and Training Evaluation scheduled for 9/99 Flight Deck Human Factor Activities –Initial CPDLC Flight Deck Configuration Study completed 3/99 –Flight Deck CPDLC IA Training and Procedures Evaluation scheduled for 10/99 Conduct Controller/Pilot/System Interaction Test in 3/00 Conduct CPDLC end-to-end human factors demonstration at FAA Technical Center by 12/00

Questions?

CPDLC I messages

CPDLC IA additional messages

Build I - Major Milestones American Airlines –Red Label Avionics Available - 3/01 –Certification and Operational Approval Complete - 11/01 –Initial Operational Capability - 12/01 FAA –Host Software Integration - 1/01 –Integration Testing - 7/01 –Initial Operational Capability - 6/02 ARINC –VDL Mode 2/ATN Development and Test Complete - 4/01 –VDL Mode 2/ATN Deployed in Miami - 3/02 ATNSI/ACI –Delivery of ATNSI software - 2/00