Missouri Certified Sites Program Missouri Department of Economic Development Presented By: Joel McNutt & Jo Ann Dent.

Slides:



Advertisements
Similar presentations
Evaluating Standards for Site Certification Presented to: American Public Power Association Presented by: Robert M. Ady, President Ady International Company.
Advertisements

COUNTY OF LOS ANGELES FIRE DEPARTMENT FORESTRY DIVISION (323)
Watershed Approaches and Community Based Planning
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
ADEQ Headquarters, North Little Rock, Arkansas Building Assessment for New Construction and Major Renovations for compliance with Federal Requirements.
MRWA 2013 ANNUAL CONFERENCE MAINE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Grand Traverse Next Michigan Development Corporation What does it mean for the communities of Grand Traverse County?
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
Northeast Florida Brownfields Workshop Brownfields Redevelopment Incentives.
Public Buildings Service Real Property Utilization And Disposal Ralph Conner, Director, Office of Real Property Rich Butterworth, Senior Counsel, Real.
August 2005 Certified Floodplain Manager Program (CFM ® ) Association of State Floodplain Managers (ASFPM)
Missouri Certified Sites Program Missouri Department of Economic Development Presented By: Hal Van Slyck Program Administrator.
Real Estate Markets Introduction. Real Estate Markets: Economic Determinants of New Construction.
Hanford Site Land Transfer
Training for Tomorrow Webinar Sponsored by: Missouri Department of Economic Development.
W E L C O M E to the SB 1022 Real Estate Due Diligence Training SB 1022 Real Estate Due Diligence Training.
Platting Update Orange County BCC January 27, 2015.
Zoning for Outdoor Advertising Purposes Or When is a cow pasture a commercial or industrial area?
Understanding Missouri’s Work Ready Communities Mapping your route to workforce competitiveness.
State Financing Programs for Brownfield Redevelopment.
Housing Costs. Mortgage Loans Mortgage Loan Amount= Selling Price – Down Payment Example House is 140,000 and they ask for a 15% down payment $140,000.
The Field Office Technical Guide and Other Technical Resources CNMP Core Curriculum Section 2 — Conservation Planning.
Planning for Economic and Industrial Development Managing Your Update Bruce Hunt Planners Forum 2014.
Community Development Department Neoga Lakes – Development of Regional Impact (DRI) Master Planned Development (MPD) Rezoning Application.
Community Development & Planning Grant Pre-Application Meeting April 17,
Green, Energy and Buildings INSERT YOUR LOGO HERE.
Indiana Shovel Ready Program Indiana Office of Community and Rural Affairs Indiana Economic Development Corporation.
1 Module 4: Post-Award Administration of Sponsored Projects (Part 1) Office of Research and Sponsored Programs The University of Mississippi 100 Barr Hall.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Flintstone-Oldtown Planning Region Comprehensive Plan Kick-Off Meeting June 23, 2010 Insert pictures.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
Building Your Response Team AND GUIDING THEM TOWARD A SUCCESSFUL SITE VISIT.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
2006 ANNUAL CONFERENCE CALIFORNIA SOCIETY OF MUNICIPAL FINANCE OFFICERS COMMUNITY FACILITIES DISTRICT FINANCING FOR SERVICES AND INFRASTRUCTURE Sam Sperry,
1 Smart Schools Bond Act Completing the Smart Schools Investment Plan
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
NOTES FROM INFORMATIONAL BRIEFINGS FOR POTENTIAL REGIONAL CENTER AND CONTENT CENTER APPLICANTS JUNE 19,20 & 22, 2012 Comprehensive Centers Program.
The Process of Accreditation
FOR CLERKS AND RECORDERS  Planning Commission – public meeting and a public hearing  City Council – public hearing  Must contain: - a map of expansion.
State Safety Inspections and Sponsor Expectations.
Virginia Outdoors Foundation Encouraging the protection of open space in Virginia …
Spokane Certified Site Program WEDA Conference 2012.
…..Kansas Department of Revenue – Property Valuation Division – Kansas GIS Policy Board - DASC ….. Statewide Tax Units Database A collaborative partnership.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
CDBG OOR Application Training. Agenda Introduction of Real Estate Production Staff Review Application Package o Funding Round Timelines o Eligible applicants.
Island County Planning and Community Development Permitting 101.
 Wetlands Assessment  Phase 1 & 2 Environmental  Six Inch Contour Map  Mapping of Pipelines  Mapping of Bayou Manchac & Bayou Paul  Boundary Survey.
Industrial Site Readiness. Land Readiness For Industrial Employment Making The Case Part I: Timing is Everything.
City of Somerville Zoning Amendment City of Somerville Medical Marijuana Treatment Facilities Pre-Application Meeting
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
Green Communities Grant Program Town of Lincoln March 8, 2010 icfi.com © 2006 ICF International. All rights reserved.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Lesedi SMME Workhop Contents Introduction Terms of reference Qualification for benefit Elementary requirements Application process Methodology for.
Financial Assistance 101 Planning for Brownfields Redevelopment Gregory M. Firely, BCES Senior Project Scientist.
Build a Professional Team Site Selection / Market Analysis Preliminary Feasibility Option to Purchase Land Feasibility Study Financing and Ownership Entity.
Renewable Energy at Contaminated Sites in in New York City Daniel C. Walsh Ph.D. NYC Mayor’s Office April 4, 2011.
Strategic Sites Inventory Program Freight Logistics Zone Development
Competitive Sites and Redevelopment Programs
Community & Economic Development
Creating a Win/Win Partnership with the Real Estate Industry
Impact Aid Section 7002 federal property
SHOVEL READINESS NEW YORK STATE economic Development council
Site Readiness Program
Pre-Submittal Meeting As Needed Environmental Services RFQ
Sustainable Agricultural Lands Conservation Program
Presentation transcript:

Missouri Certified Sites Program Missouri Department of Economic Development Presented By: Joel McNutt & Jo Ann Dent

2 Program Sponsors Ameren KCP&L Empire Electric Missouri’s Electric Cooperatives MEDC DED DNR

3 Introduction The Missouri Certified Sites Program was designed to provide consistent standards regarding the availability and development potential of commercial or industrial development sites.

4 Program Objectives Establish a statewide inventory of Certified Sites. Improve Missouri’s competitive edge by giving more certainty for businesses in locating and developing projects quickly. Standardize and recognize one set of site specific data that is most demanded by site selectors and developers.

5 Program Objectives – Cont’d Encourage local economic development organizations to control, invest and comprehensively analyze sites prior to client visitation. Demonstrate to a client that economic development organizations and/or government agencies are committed to promoting and expediting economic development projects.

6 Criteria Established based on both the requirements of industry and the data documenting availability. Certification of a site is granted after a comprehensive review of application by a “technical review team” consisting of certified economic developers. The review team will consist of up to 10 economic developers, including utility and certified community / economic development practitioners.

7 Who is Eligible to Apply? Local city government within which the property boundaries lie. Local county government within which the property boundaries lie. Locally or regionally recognized formally organized economic development organizations.

8 What is a Certified Site? A recognized economic development entity that has completed the required application and had the application approved by the technical review team. 10 Acres or more in size. Primarily marketed by the sponsoring entity for business recruitment and expansion.

9 What is a Certified Site?- Cont’d Not intended for retail. Contains (at a minimum)- water, sewer, and electric infrastructure at the site.

10 What does “Certification” mean? A complete application has been submitted to the technical review team and has met with their approval for completeness. Certification does not attest to the accuracy of the information. Certification of accuracy is provided by signature of the applicant and is accepted by the review team as true.

11 “Certification” - Cont’d Site certification will be valid for 2 years. Each certified site will be provided a logo that will designate site certification on ML1. Logo will be restricted to use by Missouri Certified Sites and may be used by the community to actively market the site.

12 Certification Costs? The city, county, or sponsoring economic development organization is responsible for all costs to assemble information, data or any professional services required to be performed to complete the application. Professional service providers may include (but not limited to); attorneys, real estate professionals, environmental specialists, engineers, and/or laboratory analysts, and state agency fees.

13 Application Process (2 Steps) Step One Complete/Submit Notice of Intent to DED Step Two……… Complete/Submit Certified Site Application to DED (6 Copies)

14 Application Process – Cont’d Hard copies or electronic copies are acceptable. Signature page will require an electronic signature and the must come from or cc the person on the signature line. Do not send original attachments to DED!

15 Application Overview – Cont’d All information submitted must be……. 1. Organized by section 2. Identified by reference number 3. Bound for ease of review

16 Application Overview 5 Parts Ownership Information Property Information Environmental and Cultural Information Access Information Community Information

17 1. Ownership Information 1.1 – Contact 1.2 – Price 1.3 – Title 1.4 – Easements, liens, encumbrances 1.5 – City Limits 1.6 – Voluntary Real Property Disclosure Form (optional)

18 2. Property Information 2.1 – Parcel Information 2.2 – Sales/Lease Information

19 3. Environmental and Cultural Info 3.1 – Phase I Environmental Assessment 3.2 – Phase II Environmental Assessment 3.3 – Regional Air Quality 3.4 – Wetland/Waters of the U.S. Boundaries 3.5 – Flood Plain Boundaries 3.6 – Threatened or Endangered Species 3.7 – Archeological and Cultural Resources 3.8 – Soil Conditions 3.9 – Seismic Activity

20 4. Access Information 4.1 – Site Access 4.2 – Rail Access 4.3 – Airport Access 4.4 – Parcel Boundary Survey 4.5 – Fire Insurance 4.6 – Utilities

21 5. Community Information 5.1 – Post Office 5.2 – Freight Service 5.3 – Emergency Medical 5.4 – Planning Agency 5.5 – Building Department 5.6 – Zoning Designation 5.7 – Police Protection 5.8 – Local Support 5.9 – Missouri Location One Miscellaneous

22 The End!