Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell

Slides:



Advertisements
Similar presentations
QoS Solutions Confidential 2010 NetQuality Analyzer and QPerf.
Advertisements

STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Mission Operations and Data Flow Overview Koji Mukai Astro-E2 Guest Observer Facility.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
1 Status of MOST James Wells. How Are We Doing? On June 30 th, MOST will enter its 8 th year of operations! You Are Here (11.9 AUs from the Sun)
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Slide 1 of 9 Presenting 24x7 Scheduler The art of computer automation Press PageDown key or click to advance.
System Implementation
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
1 Emerging Knowledge-Based Business Models Robert M. Shapiro, CEO Meta Software Corporation.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
SOLAR-B data flow scheme with emphasis on SOT Masumi Shimojo SOLAR-B project/NAOJ.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
Bernhard Fleck SOHO Project Scientist SOHO Science Operations Now and Then.
A Web Crawler Design for Data Mining
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Career Opportunities in Information Technology There are four main categories of IT jobs, grouped by the main focus of the job: Sales and support Software.
At A Glance VOLT is a freeware, platform independent tool set that coordinates cross-mission observation planning and scheduling among one or more space.
NATIONAL INSTITUTE OF SCIENCE & TECHNOLOGY Presented by: Santosh kumar Swain Technical Seminar Presentation by SANTOSH KUMAR SWAIN Roll # CS
LBTI HOSTS Science Operations Plan Draft 0 – Feb
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
The DARTS database Yoshihiro Ueda (ISAS) on behalf of the PLAIN members
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
RI User Support in DEISA/PRACE EEF meeting 2 November 2010, Geneva Jules Wolfrat/Axel Berg SARA.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Capabilities of Software. Object Linking & Embedding (OLE) OLE allows information to be shared between different programs For example, a spreadsheet created.
Solar-B SOT/FPP 1 SOT April 2006Ted Tarbell SOT Collaboration & Data Policy Ted Tarbell, for the Science Working Group 18-Apr-2006.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
1 SMOV Proposal Process Initial Submission through Flight George Chapman Merle Reinhart Tony Roman February 21, 2001.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Swift HUG April Swift data archive Lorella Angelini HEASARC.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
August 2003 At A Glance The IRC is a platform independent, extensible, and adaptive framework that provides robust, interactive, and distributed control.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
GLAST Science Support Center May 8, 2006 GUC Meeting Status of GLAST User Support David Band (GSSC/JCA-UMBC)
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
Archiving, Distribution and Analysis of Solar-B Data Masumi Shimojo SOLAR-B Project ・ NSRO/NAOJ and The SOLAR-B MODA Working Group Masumi Shimojo SOLAR-B.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GPM-GLOBE Precipitation Student Field Campaign Global Precipitation Measurement Mission Developed by the GPM Education and Communications Team NASA Goddard.
10/31/2006VSOP-2 Tracking Station Meeting 1 Lessons Learned From VSOP-1 Larry R. D’Addario JPL.
SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry.
MOBILE PHONE REGISTRATION ENHANCED BENEFICIARY TRACKING SYSTEM Liberia Agricultural Upgrading Nutrition & Child Health Program Job Milapo & Laura Buback.
Autonomy: Executive and Instruments Life in the Atacama 2004 Science & Technology Workshop Nicola Muscettola NASA Ames Reid Simmons Carnegie Mellon.
CMU Study Abroad-2014 A team of 6 CMU students and our professor Dr. Omar Keith Helferich and wife Patricia traveled to La Romana in the Dominican Republic.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
GLAST Large Area Telescope:
Launch and On-orbit Checkout
Observing with Modern Observatories (the data flow)
The STEREO Space Weather Broadcast
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell

Solar-B FPP 2 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations TRACE Initial Phases Transition to Long-Term Operational Phase Why TRACE Remote Operations Works Tools for TRACE Planners & Monitors Science Coordination with Remote Planners Report on Other Missions by Dr. Chuck Holmes (NASA HQ) T. D. Tarbell, LMSAL

Solar-B FPP 3 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS TRACE Initial Phase (1) Launch (2 April, 1998) to 1 st eclipse season (November, 1998) –April: 3 weeks outgassing, 1 week engineering checkout –May - June: 6 weeks to finish “Initial 30-Day Plan,” coordinated with SOHO –June – November: 5 months of observing without SOHO, refining observing programs and procedures, and training weekly science planners All Operations at GSFC Experiment Operations Facility –No instrument problems so engineering staff went home after ~1 week –2 scientists, 1 assistant, 1 computer sysadmin resident at GSFC –All other weekly planners traveled to GSFC for 7-10 day visits Science planning by telecons and lots of –Daily telecons at first with LMSAL/SAO/MSU, then weekly –Simple coordinations with Yohkoh & ground based observatories

Solar-B FPP 4 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS TRACE Initial Phase (2) All science observing programs were completely rewritten in this period –Better types of sequences were developed, both for science and for calibration –Most preflight sequences were never used again Operations were difficult for the early planners –Only ~6 people had enough knowledge of the instrumdent to be a weekly planner, learning how to do it on the job –Much stress from daily deadlines and too many details to follow –When operations began to settle down shortly before eclipse season, we began to train new planners Science Planning & Operations in this phase were done with approximately the same approach as that of the Solar-B MODA Outline

Solar-B FPP 5 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS Transition to Operational Phase During 1 st eclipse season, planning software installed at LMSAL –Mirroring of planning data, ftp transfers of timelines and quick look data completely successful During 2 nd year of observing, 2 scientists, 1-2 assistant planners, 1 computer sysadmin resident at GSFC –Occasional visits by other scientists to be weekly planner –Frequent JOP’s with SOHO scientists at GSFC and in France After 2 nd year, no resident scientists, 1 part-time planner, 1 part-time computer sysadmin Most planning now done at LMSAL, SAO, MSU –Travel to GSFC is done by choice to interact with scientists there, not by necessity to do science planning & operations

Solar-B FPP 6 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS Why TRACE Remote Operation Works Science planning is done by & telecon, even daily target selection Observing programs are always prepared in advance, and usually tested onboard before a JOP is run with other instruments Planning data (SAA’s, station passes, etc.) and quick-look telemetry is mirrored to multiple remote sites (LMSAL, MSU, SAO) Remote sites run same planning software as in GSFC EOF –Prepare observing tables & timelines, send to GSFC by secure sftp and ssh for uplink by the NASA satellite operators No normal Real-Time operations except uplink of timeline and tables People watch web displays of health & status at different places & times One part-time science planner at GSFC always on-call

Solar-B FPP 7 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS TRACE Timeline Generator / Editor Header Editor Timeline Editor Current onboard Obs. Sequences

Solar-B FPP 8 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS TRACE Target Selector Past location in blue, Future locations in green, Squares for TRACE & MDI HiRES FOV’s Main Widget

Solar-B FPP 9 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS TRACE Simulator

Solar-B FPP 10 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS Web Health Monitoring

Solar-B FPP 11 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS

Solar-B FPP 12 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS

Solar-B FPP 13 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS

Solar-B FPP 14 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS Observation As-Run Summary

Solar-B FPP 15 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS

Solar-B FPP 16 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS

Solar-B FPP 17 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS

Solar-B FPP 18 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS TRACE Sequences & Frames

Solar-B FPP 19 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS TRACE Frame Generator / Editor main widget CCD areas frame files

Solar-B FPP 20 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS Science Coordination with Remote Planners TRACE has run successful joint observations not only with SOHO at GSFC but also with: –SOHO “MEDOC Campaigns” with planners in Paris –Ground-based observatories in the Canary Islands, Sac Peak & Hawaii –Yohkoh and ground-based observatories in Japan Campaigns must be scheduled well in advance Observing programs must be written and run on simulator in advance – Usually tested onboard by a short run a few days in advance All parties must understand & follow the timing constraints for target selection All must go to trace_planner (NOT to an individual person) because several people follow it in addition to the weekly planner

Solar-B FPP 21 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS SOHO Calendar

Solar-B FPP 22 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS

Solar-B FPP 23 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS Comments on Observing Table & Timeline Generation Tools Need fast, local tools with intuitive GUI interfaces for use at ISAS Need ability for remote scientists to make & test observing tables before coming to or sending them to ISAS, using nearly identical tools Need developmental databases of observing tables and secure, “checked-in” database of observing tables approved for use in flight Need simulator or compiler to validate observing tables before they are “checked in” Access via the network for all of the developmental tools should be considered while designing the interfaces –Running locally using mirrored databases and/or running over the network, perhaps with reduced use of graphics to speed connectivity –Must guarantee adequate security, of course