Oint Aviation Authorities 01 - 03 June 2004OST 04-2, Helsinki1 TGL No. 36 Approval of Electronic Flight Bags (EFBs) Georges Rebender – JAA Operations Director.

Slides:



Advertisements
Similar presentations
Role , Responsibility and achievements of SARI 145 Working Group
Advertisements

Complex Electronic Hardware Policy & Guidance
Integrated Part 23 Cockpit Displays Wes Ryan Dec, 2004 FAA Small Airplane Directorate Aircraft Certification Service.
22 May 2007OST EASA Transposition of JAA TGL No. 10 (Precision RNAV) Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace.
NPA-STD 12 (JAR-FSTD H) Comment Review Presentation to OST Bruno HALLER (DGAC France) 31 May 2006.
EASA Executive Interior Requirements Working Group GAMA CMS October 18, 2011.
NZ’s STATE SAFETY PLAN W hat the CAA has to do to implement its SMS CAA/AIA/GAPAN South Pacific Aviation Symposium on SMS Simon Clegg General Manager -
HEMS Mountain Operations TGL 43
NCVHS Panel 6 WEDI Testimony on Health Plan Identifier June 10, 2014 Laurie Darst, Mayo Clinic, Revenue Cycle Regulatory Advisor WEDI Board of Directors.
Slide 2 OST 07-1 Use of Headsets JAR-OPS 3 OST WP HSST WP-06/15.3.
JAA 19th Annual FAA/JAA International Conference 1 TRANSITION FROM JAA to EASA Institutional changes in Europe Klaus KOPLIN JAA Chief Executive.
Helicopter Hoist Operations JAR-OPS 3
Recording of Digital Communications AEA position and concerns with JAA FRSG WP Vincent De Vroey Manager Operations and ATM Association of European.
Slide 2 OST 07-3 SE Piston Operations JAR-OPS 3 Appendix 1 to 3.005(e) & Appendix 1 to 3.517(a) HSST WP-06/10.5 HSST EASA Form 07/002.
Oxygen Study Group Report for OST November 2005 Dr. Annette Ruge Aviation Health Unit, CAA UK.
JAA/FAA 20th Annual JAA/FAA International Conference 1 Repair Data Acceptance Presented by W. Schulze-Marmeling.
A-NPA- OPS 33 ENAC Position OST A-NPA OPS 33 - ENAC Position2 Applicability of JAR-OPS 0 and 2 to foreign aircraft and operators Identical JAA.
IAQG 9110:2012 Revision Overview Prepared by IAQG 9110 Team Please contact Jeff Wood at with any questions or
Electronic Flight Bag (EFB)
TPC Meeting | April 30 – May 1, 2014GAMA | Washington, DC E. Restructuring of Airworthiness Standards - Status of Part 23 & ASTM Standards - Strategy for.
3 – 5 June Update on EASA FSTDs related matters 2008 US – Europe International Aviation Safety Conference.
AVS Repair, Alteration and Fabrication Team (RAFT) Results
08 June 2006Portland; Oregon; USAPeter Corbeeel Reducing the risk of smoke and fire in transport airplanes: related EASA rulemaking actions Peter Corbeel.
EASA Airborne Separation Assistance Systems (ASAS) Certification
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
Electronic Flight Bag (EFB)
1 11 December 2012E&M Sub-SSCC EASA Rulemaking Update (Continuing Airworthiness) Juan Anton Continuing Airworthiness Manager Rulemaking Directorate EASA.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
1 CAA Offshore Helicopter Review Mark Swan Group Director, Safety and Airspace Regulation.
Federal Aviation Administration 0 Certification Standards for New Technologies June 9, 2005 Certification Standards for New Technologies Presentation to:
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Presented to: Transport Airplane Metallic and Composite Structures Working Group and Airworthiness Authorities By: Walt Sippel and Mike Gruber Date: Sept.
Update on European Rulemaking for ETOPS-LROPS Global ETOPS/LROPS Implementation: Timetables and Approaches Yves Morier, St Petersburg, 4 June.
U.S./Europe International Aviation Safety Conference By:T Fazio (FAA)/ C Probst (EASA) Date: 7 June 2006 “Global Aviation Safety Processes: Refining, Reinforcing,
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
October 2002 Field Approval Process Improvement. October Topics  Background  FAPIT Recommendations  Status  Volume 2, Chapter 1  M-DAR.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
Page 1 | Confidential and Proprietary Information Structure of the Code Don Thomson, Working Group Chair IESBA Meeting Toronto, Canada April 7-9, 2014.
Overview Background Harmonization Goals
Safety Regulation Group FAA Training Workshop – Seattle 5 th to 8 th November 2001 Slide 1 Ageing Aircraft Systems The JAA Position Presented By: Tony.
Update: AUL Guidance Revisions Summary of Comments June 23, 2011 Peggy Shaw Workgroup Chair.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Presented by: Date: Federal Aviation Administration FAA Weather in the Cockpit Guidance and Policy Roger Sultan AFS-430 July 22, 2014.
Federal Aviation Administration 0 EFB Hazard Assessment November 17, Electronic Flight Bag (EFB) Hazard Assessment Steve Summer Federal Aviation.
Peter Gill Airworthiness Engineer. 2 Rule change proposals STC applications and processing Design Delegation changes AC146-1 – Class A/B Classification.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Workshop for Licensing and Operations Operations Cologne – Germany – 9 June 2005 Georges Rebender/Evan Nielsen 1.
Project Management PTM721S
Safeguards- Feedback on Safeguards ED-2 and Task Force Proposals
Code Governance Review UNC Modification Proposals
Outcome TFCS-11// February Washington DC
Structure of the Code – Phase 2 TF Comments and Proposals
Alignment of Part 4B with ISAE 3000
Certification Workshop
Workshop for Licensing and Operations
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
Status of U.S.-EU Bilateral Agreement
AERODROME CERTIFICATION COURSE
R18011 discussion This document prepared for informational purposes only, and does not endorse a specific resolution to the request R18011.
Updating the Article 6 guide Outline of envisaged changes
IAQG 9110:2012 Revision Overview
IAQG 9110:2012 Revision Overview
USOAP Continuous Monitoring Approach (CMA) Workshop
EU Water Framework Directive
Presentation transcript:

oint Aviation Authorities June 2004OST 04-2, Helsinki1 TGL No. 36 Approval of Electronic Flight Bags (EFBs) Georges Rebender – JAA Operations Director

oint Aviation Authorities June 2004OST 04-2, Helsinki2 Presentation Overview Background Consultation Comment Response Summary Recommendation

oint Aviation Authorities June 2004OST 04-2, Helsinki3 Background Preparation of a Temporary Guidance Leaflet for Approval of Electronic Flight Bags has been in work for a year Coordinated by members of the Airbus JOEB team Incorporates experience gained on: Airbus Step 1, A and A380 platform approvals Validation of Boeing 777 EFB National approvals

oint Aviation Authorities June 2004OST 04-2, Helsinki4 Background Contains airworthiness and operations guidance material Based closely on FAA AC A, but with differences reflecting the scope of JAA Ops and airworthiness processes Also reflects lessons learnt and new applications not considered when the FAA AC published

oint Aviation Authorities June 2004OST 04-2, Helsinki5 Background Airworthiness content of TGL now subject of EASA approval (responsibility taken from CST) EASA does not have an equivalent section for TGL material so title reference may change, probably AMC-20 series Will have to await EASA formal process but should not prevent advance publication in JAA Admin & Guidance Material (JAR-OPS)

oint Aviation Authorities June 2004OST 04-2, Helsinki6 Consultation Progress reports made to OST (October 2003) and CST (December 2003) Mature draft presented to both Sectorial Teams end of February 2004 Also circulated widely to industry and certification teams closely involved with EFB approvals e.g., JAA Avionics CSP, FAA, Boeing, JAA A380 and Dassault certification teams

oint Aviation Authorities June 2004OST 04-2, Helsinki7 Comments Comments received from: CAA NL, LBA, DGAC-F, Airbus, JAA A380 certification team members IFALPA, GAMA, CAA Denmark

oint Aviation Authorities June 2004OST 04-2, Helsinki8 Comment Response (1) Confusion over the difference between Type C software applications and a “normally” certified system Type C definition removed In fact the airworthiness approval process was the same and confusion came from trying to work out the differences between the two i.e., none Questionable whether Type C was ever really an EFB application Consulted with FAA and they agree, but not changing AC A at this time

oint Aviation Authorities June 2004OST 04-2, Helsinki9 Comment Response (2) Involvement of airworthiness authorities in Type classification and assessment of some Type B software applications Stems from concerns that some Type B software applications are close to normal aircraft functions and should in fact be fully certified Confusion between the two Section 6.2 and Appendix B revised

oint Aviation Authorities June 2004OST 04-2, Helsinki10 Comment Response (3) Treatment of FCOM and MEL Distinction between without contextual access (Type A) and with contextual access (Type B) Class 2 device mounting requirements Reflecting actual experience where control yoke installation resulted in pilot unable to attain full and free movement Consistent with TCA policy

oint Aviation Authorities June 2004OST 04-2, Helsinki11 Comment Response (4) Suggestion to exclude non-commercial operations as per FAA Part 91 TGL only guidance information References only include JAR-OPS 1 and 3 paragraphs, but could include Part 23 aircraft, so implicitly non-commercial operations excluded Classification of moving map/chart displays for in- flight and on-ground applications Clarification provided in Appendix B Consistency with FAA policy

oint Aviation Authorities June 2004OST 04-2, Helsinki12 Comment Response (5) Application of Restricted to software applications requiring airworthiness assessment Clarification now provided regarding what requires airworthiness assessment and what does not Typically on Class 3 systems Airworthiness authorities will have to apply judgement in terms of “safety effect” and suitability for hosting on COTS platform e.g., limitations of use, operational mitigations

oint Aviation Authorities June 2004OST 04-2, Helsinki13 Comment Response (6) Potential confusion in the use of term Administrator Changed to EFB Administrator and added to Definitions Suggestion to move performance calculations from Type B to Type A Rejected Based on JOEB experience concerns over accuracy of these software applications and consistency with AFM data

oint Aviation Authorities June 2004OST 04-2, Helsinki14 Comment Response (7) JAA Leaflet more restrictive, why not just reference AC A Rejected Whilst much of what included in the leaflet goes beyond the AC, JAA processes are different and inclusion of airworthiness authorities involvement and administrator responsibilities considered consistent with the level of safety and configuration management/quality control the JAA would expect to see

oint Aviation Authorities June 2004OST 04-2, Helsinki15 Comment Response (8) FAA/JAA harmonisation - suggested inclusion of a difference report Rejected JAA provided underlined text in JAR-25 to show differences from FARs but in general has not issued difference reports for Operations Rules, Advisory or Leaflet material FAA do not provide a reciprocal service FAA fully consulted during drafting and have raised no objections

oint Aviation Authorities June 2004OST 04-2, Helsinki16 Comment Response (9) Expectations for CRM and workload assessment Section 7.7 revised, LOFT session added Further elaboration may be required following JOEB/JAA experience but would not expect advisory material to be prescriptive There needs to be a “common sense” approach depending on EFB system and software applications and intended use

oint Aviation Authorities June 2004OST 04-2, Helsinki17 Comment Response (10) Own ship position Policy consistent with FAA, see Appendix B Controlled PED, Lithium Batteries, importance of correct classification of software application Considered an improvement over current guidance and largely in response to questions from industry and certification teams

oint Aviation Authorities June 2004OST 04-2, Helsinki18 Comment Response (11) Requirements for an Operational Evaluation Test Section 7.7 re-written to distinguish between when initial retention of paper required, versus commencement of operations without paper back up Suggest an airworthiness evaluation of flight critical data Airworthiness involvement clarified in Section 6.2 and Appendix B Requirements for duplicate EFB system Addressed by operational risk analysis Section 7.1

oint Aviation Authorities June 2004OST 04-2, Helsinki19 Summary Defining the EFB approval process is not easy Extent of airworthiness approval activity is linked to EFB hardware Classes and to EFB application Type The TGL has attempted to define the boundary between airworthiness and flight operations approval taking into account existing JAA roles and responsibilities

oint Aviation Authorities June 2004OST 04-2, Helsinki20 Summary It is clear that EFB approval process has led to a change in working practices Requires a much more integrated approach between airworthiness and flight operations specialists working within the JOEB

oint Aviation Authorities June 2004OST 04-2, Helsinki21 Recommendation The JAA Operations Sectorial Team are: Invited to note the changes to Final Draft of TGL No. 36 Invited to note the Comment Response prepared through this presentation Agree to the publication of TGL No. 36 in Section 4/Part 3 (JAR-OPS) of JAA Administrative & Guidance Material