Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.

Slides:



Advertisements
Similar presentations
FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Advertisements

USDA - RURAL DEVELOPMENT
Construction Contracting
Roles & Responsibilities in Construction Management
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Marcy Mealy Procurement Specialist CDBG Program
Consolidated Equipment Financing Program (CEFP) Department of Financial Services Bureau of Accounting.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Conditions of the Contract for Construction
PROCEDURES FOR SELECTING THE CONTRACTOR
Doing Business with Department of Enterprise Services for General Contractors and Subcontractors June 19, 2013.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Mississippi Department of Education Office of Child Nutrition Request for Proposal No Child Nutrition Management System.
2009 CDBG/CHIP Recipients’ Workshop CDBG LABOR STANDARDS.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
U.S. General Services Administration Term Contracts Drand Dixon Sales Contracting Officer Federal Acquisition Services Drand Dixon Sales Contracting Officer.
 If the Servicer evaluates the Borrower and determines that the Borrower is eligible for a HAFA Short Sale  The Servicer must comply with the following.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
2010 CDBG Recipients’ Workshop The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
Mock State Aid Project County Highway Accountant’s Conference 2015.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
CONSTRUCTION CONTRACTS DOCUEMENTS
Contract Training Class I
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Monitoring and 638 Contract Close-out. Contract Monitoring and Close-out After Award ▫ Meet with Tribe to discuss the Agreement  Include Monitoring Plan.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
Supervision SICOR Securities, Inc.. Why? NASD 3110 requires the firm to “…establish and maintain a system to supervise the activities of each registered.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
2013 CDBG Recipients' Workshop CDBG Labor Standards.
Office of Procurement Services.  Vendor Application Website: 
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Emilio Pucillo Director, Division of Engineering Services, HHS Peyton Kuhlthau Acting Director, Division of Facilities & Loans, HHS.
Contract Compliance Training. Department Personnel Office of the General Counsel (OGC) Mario K. Castillo General Counsel John Guest Deputy General Counsel.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
IAS Pre-proposal Conference December 10, 2012 Pre-proposal Conference December 10, 2012 San Antonio bldg 1 & 4 Renovation san antonio, tx Project no: San.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
FIDIC Tendering Procedures
Simile Billing Process. On the 20 th of the month the Project Administrators monthly billing reminders to all subcontractors that need to be paid.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Contract Compliance Training
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Administration of a FIDIC Contract - Project Control
Construction Oversight
DTF CONSTRUCTION MONITORING
Contract Compliance Training
Overview of Stakeholders and Key Roles
State Aid Construction
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
Partnering with the Defense Acquisition University Equivalent Provider Application (EPA) Process Phase I - Details END NO YES Provider contacts an approved.
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Completing the State Aid Payment Request
Manajemen Konstruksi Bidding & Award
ISDEAA - P.L SECTION 105(l) LEASE PROPOSALS
State Aid Construction
Diversity management system (DMS)
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project with Architect & Owner. Architect submits draft O-A Agreement for RD review. For projects where the construction cost is less than $100,000 the short forms can be used. For projects where the construction cost is greater than $100,000 the standard forms must be used. RD reviews Agreement, provides comments & approval upon satisfactory review Architect executes Agreement with Owner and sends at least one original copy to RD. Upon satisfactory review RD will provide concurrence and mail the original back to the Architect. Architect submits 2 copies of the Preliminary Architectural Report (PAR) for RD review (1 to the State Office and 1 to the Area Office). See PAR Guide. RD reviews PAR, provides comments & approval upon satisfactory review. RD issues Letter of Conditions and obligates funds. Architect submits 2 copies of the plans, specifications and contract documents for RD review. If the construction cost is less than $100,000 the short forms can be used. If construction cost is greater than $100, 000 the standard forms must be used. RD reviews plans, specifications and contract documents, provides comments & approval upon satisfactory review. Owner submits application, RD makes eligibility determination. RD receives closing instructions from OGC. Architect advertises for bids, receives bids and performs bid opening. After bid opening, Architect submits 1) Bid Tabulation 2) Proposal from the low bidder with bid bond and signed certifications (Power of Attorney, etc., as appropriate) 3) Architect’s analysis and recommendation for award. 4) The owner’s recommendation for award, to RD for review. The Architect is responsible for providing a copy of all bid addenda to RD. Flow Chart continued on next page i

Owner issues Notice of Award. Architect prepares and sends RD at least one original copy of the Agreement (signed by owner and contractor), Performance and Payment bonds, Power of Attorney, Certificates of Insurance (as required in contract) and Certificate of Owner’s Attorney. All items must be bound with the contract documents and sent through the RD Area Office, then forwarded to State Office for concurrence. Upon satisfactory review of bound contract, RD will sign for agency concurrence and mail the original back to the Architect for distribution to owner and contractor. Owner issues Notice to Proceed. Upon satisfactory review of the bid documents, RD will provide a letter of concurrence for award. ii Pre-construction conference is held with Architect, RD, other funding agencies, owner, contractor, significant subcontractors and others as needed. Prior to the preconstruction conference, the Architect must submit a resume of qualifications of the resident inspector to the owner and to RD for acceptance in writing. Full-time resident inspection is required for all construction unless a written exception is made by RD upon written request of the owner. The resident inspector is required to maintain a record of daily construction progress. Invoices for payment of construction costs must be approved by the owner, Architect and concurred in by RD. Typically this will be done on a monthly basis. A prefinal inspection will be made by the owner, resident inspector, Architect, contractor, representatives of other agencies involved and RD representatives, generally both Area and State Office. The inspection results will be recorded by the Architect and a copy provided to all interested parties. A final inspection will be made by the owner, Architect and RD before final payment is made. Any change orders that may arise during the course of construction must be clearly identified and explained through use of USDA RD Form All change orders must be approved by the owner, Architect and concurred in by RD. In order to be approved, the change order must be justified and the cost must be reasonable. Flow Chart continued from previous page Architect executes AIA G704 “Certificate of Substantial Completion” and provides a copy to RD. Architect delivers as-built plans and O&M manuals to the owner. Architect, Owner and RD representative perform 11 month inspection. If no items of concern are noted during the inspection the project is complete.