Steven Hubble, Environmental Programs Manager Department of Public Works October 7, 2011.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

County of Fairfax, Virginia Alternatives for Improving Roadway Services in Fairfax County Board Transportation Committee Meeting March 1, 2011 Department.
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Environmental Project Commitments The Alberta Experience
SESSION: DEICER MANAGEMENT SOLUTIONS Salt Management Research in Virginia Jimmy White, Virginia Center for Transportation Innovation & Research The Virginia.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Developed under an OSHA Susan B. Harwood Grant, #46F4-HT01, by the Associated Builders and Contractors-Central Texas Chapter 1 Excavation Safety for Residential.
Wednesday, May 18 th 12:30 pm — 4:30pm (with optional Q&A session until 5pm) City of Duluth Public Works 520 Garfield Avenue, Duluth, MN Stormwater Basics.
House Bill 2 and P3 Update Aubrey Layne Secretary of Transportation December 17, 2014.
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC January 27, 2015.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Gwinnett County’s Post Development Stormwater Management Program
Final Presentation Minerva Engineering. Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Introduction to Construction General Permit Inspections.
Open Space Residential Development Bylaw Town of Rehoboth.
Rural Residential Zoning District & Subdivision Exemptions Southampton County Board of Supervisors Presented by Jay Randolph November 28, 2005.
How 1041 Regulations are Impacting Geothermal Development A discussion of how counties are applying 1041 regulations to geothermal development and the.
INDOT Access Management Study _________________________ Long Range Transportation Planning Section Division of Environment, Planning and Engineering INDIANA.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Protecting Communities Task Team Update Las Vegas January 14, 2009.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Amendments to the Unified Land Development Code Section Multifamily Residential Requirements Section (d) – Planned Developments with Transfer.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Presented by: Uri Eliahu, GE (925) May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
1 State Parks  Soil and Water Conservation  Natural Heritage Outdoor Recreation Planning  Land Conservation Dam Safety and Floodplain Management Chesapeake.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
TRENCHING & EXCAVATION
The overarching goal of the legislation is to have Ecology conduct research and develop recommendations for implementing and financing an electronic product.
TOPICS IN LAND SURVEYING: SUBDIVISIONS TREC #7220 TIM HOWELL, RLS TREC INSTRUCTOR #1556.
Stafford County, VA Stormwater Management Maintenance Inspections Program Steven Hubble Environmental Programs Manager Department of Public Works.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
Prospective Rural Additions Meeting JULY 15, 2015.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Brownfield Redevelopment and HIA Sandra Whitehead, PhD Director of Program and Partnership Development National Environmental Health Association June 15,
Objectives Upon completion of this module you should be able to:
NORTH TRUNK SEWER REPLACEMENT PROJECT
Chapter 4 Osceola County Land Development Code (LDC)
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Comprehensive Land Use Planning and Zoning
Chesapeake Bay TMDL Milestones, Progress, Mid-point Assessment
Competency: Create site plan drawings
City Council Meeting November 14, 2016
Subdivision Applications
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
5 Safe Excavation Strategies For Underground Utility Contractors In Ooltewah, TN.
NEPA Assignment Program Overview
Board of Public Utilities August 17, 2017
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

Steven Hubble, Environmental Programs Manager Department of Public Works October 7, 2011

Introduction Field/Project Experience Soils Policy Recommendations Conclusion

Naturally occurring soils or sediments formed under waterlogged conditions Contain iron sulfite materials (pyrite) Are benign while underground Become acidic when excavated and left exposed on the surface to oxygen

Small lot (1/4 acre lots) residential subdivision Large lot (1 acre lots) residential subdivision Transportation (Roadway-Widening) Project

Located near Falmouth, VA 147 lot cluster residential lot subdivision Avg. lot size 8,000-10,000 sq. feet (sod required for lots) 1 developer (local), 2 builders (1 regional, 1 national) Construction begins late 2005/early 2006 Acid Sulfate and Soil Stabilization problems noted in 2009 VT staff (Lee Daniels) contacted for assistance Soil testing conducted and remediation plans developed by developer and builders through geotechnical/engineering consulting firm Significant remediation activities completed in 2009/2010 Remediation activities continue/complete Soil pH readings range from normal to +/- 2.5 pH

Continue to monitor site for recurring problem areas Mitigate remaining areas as necessary Complete infrastructure construction and address outstanding completion items Hold securities until issues are resolved

Near Falmouth, VA 63 lots (minimum of 1 acre) Developer absent due to bankruptcy County utilizing security funds to complete infrastructure improvements Acid Soils encountered during completion of neighborhood stormwater management pond Acid soils relocated to other parts of the neighborhood

Widening of a roadway from 2 to 4 lanes Road improvements proffered and constructed by a developer for VDOT Acid Soils prevalent in the area (Quantico Slate) and unearthed during initial road construction (late 80’s/early 90’s) Large underground electrical transmission line is located in the area

Established by County Building Official with enabling authority from the Virginia USBC (Building Code) Soil evaluation required for acid sulfate soils and other soil issues (shrink swell, compacted fill) If acid soils are suspected, testing is required If the test does not register between pH of 5.5 and 7.5, then mitigation to improve soil pH is required

Use Statewide soils data merged with locality specific data to identify potential risk locations Attempt to identify problem soils prior to excavation If acid soils excavated during cut, place those soils in a deep fill area where they will not be exposed to oxygen Educate inspectors/staff on acid soils to help them identify in the field if exposed Consider regulations that address acid soils at the development plan or building permit stage Ask for help if you encounter acid soil problems

Training Class on this topic hosted by Virginia Association of Professional Soils Scientists November 3 and 4-Fredericksburg, VA _S_Final_Program.pdf _S_Final_Program.pdf

Steven Hubble, Environmental Programs Manager Department of Public Works P.O. Box 339 Stafford, VA