Mu2e WGM 4/21/2010 R. Ray Mu2e Project manager. Project Team We have a L2 manager for the tracker!  Aseet Mukherjee has assumed this role  Experience.

Slides:



Advertisements
Similar presentations
Mu2e WGM 2/22/2011 R. Ray Mu2e Project manager. CD-1 Our sole focus is on CD-1 and in particular, the Director’s Review scheduled for April 3-5. To be.
Advertisements

Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Mu2e Project Overview Mu2e WGM R. Ray 3/17/ /17/ Mu2e WGM.
1 Spectrometer Solenoid Design and Cost Update Michael A. Green Lawrence Berkeley Laboratory 10 February 2005.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
Mu2e WGM 7/27/2011 R. Ray Mu2e Project manager. Director’s Review We have settled on date for the Director’s CD-1 Review; Oct Focus of review will.
Mu2e WGM 9/15/2010 R. Ray Mu2e Project manager. L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator S. Werkema FNAL 1.3 Conventional Construction.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Mu2e WGM 6/16/2010 R. Ray Mu2e Project manager. L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator M. Syphers FNAL 1.3 Conventional Construction.
NOvA Project Status April 3, 2007 John Cooper Ron Ray Nancy Grossman.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
Project Overview Ron Ray Mu2e Project Manager Fermilab Sept. 26, 2008 Preliminary Director’s Review of mu2e Fermilab.
Mu2e WGM 10/20/2010 R. Ray Mu2e Project manager. Why does the building have to go in the middle of a road? R. Ray - Mu2e WGM2.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
Mu2e Cost and Schedule Ron Ray Mu2e Project manager Fermilab PAC Meeting November 3-4, 2008.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
KA11 Contributions to Mu2e R. Ray Mu2e Project Manager 8/16/2010 1R. Ray.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Mu2e Ron Ray Mu2e Project Manager Jan. 11, Scope of Mu2e Project R. Ray - Mu2e Overview 2 Design, construct, and install the Mu2e detector, modify.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
DT-LHCb coordination meeting 18 April 2016
Status of the MICE Construction Project
Technical Design for the Mu3e Detector
News and brief overview of Beamline plans for the next few months
Update of experimental hall in Japanese mountain site
Radiation Damage to Mu2e Apparatus
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Mu2e WGM 4/21/2010 R. Ray Mu2e Project manager

Project Team We have a L2 manager for the tracker!  Aseet Mukherjee has assumed this role  Experience from successful CDF Central Tracker  Working to augment his team and find significant roles for 1 or 2 young people. L2 Manager for the Muon Channel (P. Limon) is retiring and leaving in less than 1 month.  Sandor Feher (TD) has agreed to take over from Peter.  Sandor was the Deputy Project Manager for APUL, now in hibernation.  Muon Channel is tightly coupled with the solenoid work. Sandor is tightly integrated into TD structure that is managing the solenoid subproject. INFN has yet to arrive at a consensus candidate for the Calorimeter L2.  I have been pressing them for the past week to resolve this. Should have a name soon. Some initial discussions about Trigger and DAQ L2 slot.  CD committed to conceptual design for CD-1. R. Ray - Mu2e WGM2

L2 Systems and Managers R. Ray - Mu2e WGM3 1.2 Accelerator M. Syphers 1.3 Conventional Construction T. Lackowski 1.4 Solenoids M. Lamm 1.5 Muon Channel S. Feher 1.6 Tracker A. Mukherjee 1.7 Calorimeter INFN 1.8 Cosmic Ray Veto C. Dukes 1.9 Trigger and DAQ TBD 1.1 Project Management R. Ray

Tracking Our two offline tracking and reconstruction experts are meeting in Berkeley this week.  After Rob returns we will have a meeting to discuss how to proceed to a Conceptual design. There are a limited number of questions that require an answer for CD-1.  We need to focus on these and leave the details for later. Also some R&D and prototyping work that will extend beyond CD-1 Our new L2 manager will be coordinating this work and setting simulation priorities. R. Ray - Mu2e WGM4

WBS, Cost, Schedule We have developed a draft WBS through L4 across the Project. Have a WBS dictionary for most activities. Still missing a few. Using the activities required for CD-1 as a development/training ground. R. Ray - Mu2e WGM5

ES&H and NEPA Met with Nathan Duff (PPD ES&H) last week to discuss safety.  Filled out Environmental Impacts Checklist (EIC) It is possible that Mu2e could qualify for the categorical exclusion.  No time consuming EA  Lab/DOE resources freed up to work on more difficult LBNE and Project X EA’s. Paul is organizing a meeting with DOE and ES&H to discuss how to proceed towards making such a determination. R. Ray - Mu2e WGM6

Heat Shield Emerging as Significant Risk Recall that the Heat Shield is intended to protect the Production Solenoid from target debris. Incoming proton beam is 25 kW ~ 2.1 kW is radiated into the heat shield/solenoid or removed by target cooling liquid. Adds to the heat load on the refrigerator Can cause temperature gradients in the cold mass that eat into temperature margin. Could lead to quenches. Potential for radiation damage to solenoid components. R. Ray - Mu2e WGM7 Tungsten Copper The MECO heat shield was a 76 ton water-cooled Cu and W structure.

DPA at 1 st coil R. Ray - Mu2e WGM8 DPA per year at 1 st coil DPA = Displaced Atoms Peak DPA in aluminum stabilizer is ~ 2.5 x /yr.  Close to critical value at 4.2°K. Leads to unacceptable rise in resistance.  Failure points not well known at low temperatures o Investigating possibility of reactor measurements of cold materials jointly with Japanese.

Heat Shield – cont. An alternative design of tungsten carbide balls and water reduces the radiation by ~10x.  Tungsten carbide is less expensive than tungsten, but an all tungsten carbide design is probably more expensive than tungsten + copper.  Need an engineer to do a conceptual design so we can get a cost estimate o PPD - Rucinski, Pushka, Stefanik… o TD – Rob Riley? o AD ? R. Ray - Mu2e WGM9

Requirements Documents R. Ray - Mu2e WGM10

Electronics LBL is just beginning to update the design of the BaBar Elefant Chip. This is the only electronics work we have done to date. Now that CD is beginning to work on the DAQ we need to get moving on FE electronics.  Our new L2 manager for the tracker and soon to be named L2 manager for the calorimeter will have to make this a priority and work with CD to come up with a coherent conceptual design. A Project Electrical Engineer could begin to play an important role  Probably only need 0.25 – 0.5 FTE in this role for the next year.  I have some ideas for who could play this role and will be talking to management about their availability. R. Ray - Mu2e WGM11

Action Items Get resources for CD-1 activities into P6. Begin work on predecessors and BOEs. Understand (and document!) the magnitude of the heat shield problem. Agree on a strategyfor getting the tracker to CD-1. Get L2 Manager for calorimeter in place. Get moving on FE electronics. R. Ray - Mu2e WGM12

Summary We continue to make good progress on the solenoids and accelerator. Work starting up again on the detector hall. One more round of verifying requirements before Conceptual design. Work will begin to accelerate on the tracker now that we have a L2 manager. The Heat Shield poses a significant technical and cost risk. We are working hard to understand this risk in detail. Will need some engineering to get us to a credible/defendable Conceptual Design. Trying to get more requirements documented. We have reached the point where we could us a Project EE. R. Ray - Mu2e WGM13