CSX’s I-95 Corridor for the Virginians for High Speed Rail March 13, 2007.

Slides:



Advertisements
Similar presentations
TRANSPLEX 2007 Freight Demand and Planning in Florida July 12, 2007.
Advertisements

Transportation Border Working Group
I-95 Corridor Coalition Financing Freight Transportation Improvements: Exploring Future Options _________________________________________ U. S. Department.
Mid-Atlantic Rail Operations Study -- Benefit Assessment Presented by: Jack Lettiere, Commissioner New Jersey Department of Transportation Presented to:
STATE OF NEW YORK Andrew M. Cuomo Governor New York State DOT Joan McDonald Commissioner Presentation by NYSDOT to the Transportation Border Working Group.
1 The Peninsula Subdivision For The Hampton Roads Partnership Quintin C. Kendall Resident Vice President—State Government Affairs July 17, 2009.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
California Transportation Commission Glendale, California July 25-26, 2007 Business Plan 2008 Capitol Corridor Joint Powers Authority (CCJPA)
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
The Alameda Corridor: Lessons Learned Presented to: UCI Conference on the New Generation of Transportation Financing in California Costa Mesa, CA Gill.
1 Amtrak’s Vision for the Northeast Corridor PRIIA 305 Annual General Meeting – June 14 th, PRIIA305 DMU Approval Meeting Andrew Wood Chief, Next.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
INFORMS 2012 Shared Corridor Railway Maintenance Scheduling Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
CSSC Regional Rail Partners, September 18, 2012 Chesapeake Connector : Freight and Passenger Rail Benefits Study.
Concept AAR saw concept in late July Allows freight railroads to “bank” their “match” funding for multiple and future corridor improvements Voluntary.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
1 1 1 Partnering with the Freight Railroads – Passenger Service SCORT – 2009 National Meeting September 21, 2009 Partnering with the Freight Railroads.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Trains are better for our environment than other modes of travel.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
VRE SYSTEM PLAN WEBINAR October 9, 2013 Christine Hoeffner, VRE Foster Nichols, Parsons Brinckerhoff.
North Carolina Rail Division Staff of about 50 Mission to: Improve & expand passenger rail service Improve safety at crossings Provide industrial access.
State of Rail in Texas STATE OF RAIL IN TEXAS Erik Steavens Rail Division Director, TxDOT.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
National Multimodal Freight Trends/Issues/Forecasts/ Policy Implications.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
The Crescent Corridor Intermodal Freight Project Improving Lives and Livelihoods IN & AROUND DC Washington, DC December 16,
1 Freight Program Update Karin Foster June 5, 2009.
The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail.
1 Northeast Corridor - Overview Regional Plan Association Spring 2010.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Drive Safe Hampton Roads Thelma Drake, Director September 27, 2013.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer,
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
U.S. Freight Railroad Infrastructure: Current and Future Issues Craig F. Rockey Vice President - Policy and Economics Association of American Railroads.
Nate Asplund Director – Public Private Partnerships September 20, 2009 SCORT 2009 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.
Testing the Hypothesis Bill Schafer Director, Strategic Planning March 21, 2007 Can Rail Reduce Congestion?
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
0 Freight Activities: Year in Review Dec. 12 th 2015.
VA-NC Interstate High Speed Rail Compact Current Projects and Initiatives March 21, 2016 Paul C. Worley, Rail Director.
VA/NC Compact Passenger Rail Update Kevin Page Chief Operating Officer Rail and Public Transportation January 9, 2012.
Virginia Rail Program Update Virginia-North Carolina High Speed Rail Compact Commission Meeting March 21, 2016 Jennifer Mitchell Agency Director.
TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration.
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
Michigan Update Michigan Association of Rail Passengers
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
DRPT Overview Jennifer Mitchell Agency Director
VIRGINIA RAILWAY EXPRESS
NCRR is helping build a strong economy that benefits the people of North Carolina. We do this most visibly with steel and wood. Even more important, we.
Presentation transcript:

CSX’s I-95 Corridor for the Virginians for High Speed Rail March 13, 2007

2 Today’s discussion:  Provide an overview of CSX’s I-95 Corridor in Virginia  Discuss Amtrak performance  Review actions to improve performance  Update construction projects  In depth look at the Quantico Bridge cut-in  The path to the Corridor of the Future and to the funding

3 On-time performance of Amtrak trains is largely dependent on three factors.  Physical characteristics of the operating territory  Single/double track?  Signal System?  The operating mix of train traffic  How many trains?  What kinds of trains?  The validity of schedules  Can they be reliably maintained?  Do they adjust for known activities?

4 CSX’s DC to Richmond corridor is our busiest multi-use, double track corridor and one of the busiest in the US.  ~110 miles of double track with centralized traffic control (CTC )  48 Daily passenger/commuter trains  18 Amtrak trains  30 VRE commuter trains  ~ 32 daily freight trains  Over half the train slots filled by passenger trains  And until recently, a single track bridge Richmond Washington Richmond Washington

5 Passenger operations outperform freight operations even with increased traffic and few capacity enhancements.  The high standard deviations for freight trains mean poor reliability for freight customers  Poor freight reliability means more highway congestion

6 CSX and BNSF have the lowest levels of freight train interference. Freight Interference by Road

7 In 2005 and 2006, CSXT delays to Amtrak trains have been driven more by maintenance than by freight train delay. Maintenance of Way, Signal, and Slow Order Caused Amtrak Delays

8 CSX is completing a robust RF&P maintenance program.  Invested $19 million in RF&P track structure in 2005 and 2006  Replaced 176,092 ties (138.2 track miles)  97,165 feet of rail (9.2 track miles)  Another $10.5 M planned in 2007  Replacing 48,000 ties (43.68 track miles south of VRE service area)  Replacing 78,000 feet of rail (14.74 miles)  Investments benefit passenger service: Better ride and more reliable service  However, tie replacement:  Requires the removal of the rail anchors  Breaks the surface friction between the ties and the ballast  Destabilizes track, and  Requires a conservative approach to heat.

9 Last summer’s passengers experienced significant delays; the root cause was a lack of capacity.  The most severe delays resulted from a combination of causes  June flooding set records  Severe electrical storm caused catastrophic damage at Possum Point  Traffic congestion due to booming economy  Lack of capacity  Lack of capacity identified as the root cause of delays years ago  VRE agreement  1999 Federal Railroad Administration Report to Congress  2000 CANAC Line Capacity Study for Virginia, VRE and CSX  MAROPS (Mid Atlantic Rail Ops Study - VA, FRA, FHWA, state DOTs, and Ports)  Causes significant traffic congestion which inhibits reliability and growth  Prevents recovery, regardless of the cause of the initial delay  Few stations have platforms serving both tracks, resulting in a single track operation for VRE  Only a small portion of the delays were attributable to heat orders  Affects trains between 1 PM and 7 PM only  50 MPH, not 70 MPH, but multiple station stops limit the impact  Maximum delay of 10 minutes for Fredericksburg riders; more for Richmond and Newport News

10 As responsible partners, we’ve taken a number of actions to improve performance as the capacity improvements are underway.  Intensified tactical focus produces results  Assigned experienced dispatchers to territory  Added operations superintendent to network dispatch center to monitor daily operations  Established new train manager for area  Increased signal, track and mechanical maintenance presence on corridor  Changed freight schedules for trains departing Richmond, Baltimore and Cumberland  Partnering with Amtrak & VRE on major maintenance work  Working nights to minimize disruptions when possible — Minimizes train cancellations — Less productive, more costly and more challenging for workers — But produces additional concerns during summer heat  Establishing an experienced based, realistic schedule

11  Phase One – Complete  AF Interlocking  Dispatcher Consolidation  Phase Two – Complete  Arkendale crossovers  Elmont crossovers  Phase Three – Underway  L’Enfant 3rd main  Phase Four – 2007/2008  Quantico Bridge (Feb. 2007)  Slater’s Lane to RO (Design)  Franconia 3rd main (Design)  Phase Five – 2008  Fredericksburg to HA 3rd main (Design) The capacity enhancements will make a real difference, especially the opening of the Quantico Bridge.

12 The new 2-track Quantico Bridge opened February 17.

13 P098 was the first train over the new Quantico Bridge.

14 The $30M Quantico cut-in involves far more than just the construction of a new bridge.

15 In addition, the Rail Advisory Board is funding the preliminary engineering for 11 miles of 3rd main between Arkendale and Powells Creek.  Increases capacity significantly  Eliminates congestion at Quantico Creek  Capitalizes on new Quantico Creek Bridge; from 1 to 3 tracks  Complements on-going, publicly- funded capacity improvements  Includes a new Cherry Hill VRE station stop  Uses match from a private developer

16 But the consensus finding is that major investments are needed to finish the project in three phases.  Phase 1  Build the third main track from DC to Richmond now — Exclude the high cost projects — Seek the preliminary engineering needed for firm estimates  Phase 2  Attack the challenging, high cost projects next — Major bridges Potomac Aquia — Ashland constraints — Fredericksburg viaduct  Phase 3  Develop the Corridor of the Future — Sealed high-speed freight passenger separation — Expanded freight capacity

17 The DC to Richmond Third Track Feasibility Study provides the path for completion.  Complete the VTA 2000 program of projects.  Complete a comprehensive alternatives analysis  Conduct operational modeling  Review alternate right-of-ways  Analyze public and private benefits  Conduct an environmental review and the preliminary engineering  Determine the specific design  Develop accurate estimate of costs  Establish agreements  Identify a dedicated source of funding for capital and operating costs

18 Federal support is the key. Funding  Federal appropriations (primary source of funding)  2008/9 Transportation Reauthorization Bill  Corridors of the Future  State Appropriations  ~$100m spent by Commonwealth of VA  ~$20m in VA transportation bill  Local governments and other agencies  (1995 VRE agreement to fund 3 rd main)  Amtrak  CSX - right of way & existing improvements Benefits Intercity passenger capacity / reliability Commuter capacity / reliability Trucks off the highway Reduced highway congestion on I-95 Environmental benefits

19 CSX’s Corridor of the Future application may surprise you.  Corridor stretches 1,200 miles from Washington to Miami.  Corridor must be modified to address three major challenges  Both passenger and freight trains need to travel faster  Both passenger and freight trains need greater reliability and recoverability  Both passenger and freight train volume will increase  CSX’s vision for the future is:  Passenger trains must be able to travel unimpeded at 110 MPH  Freight trains must be able to operate at speeds of 50 MPH to 70 MPH  Passenger service must be physically separated from freight operations —Higher density industrial areas may require freight tracks on both sides of passenger tracks  The corridor must be sealed to prevent motor vehicle intrusion —1700 at-grade highway rail crossings must be addressed

20 We must finish the project; the next steps are…  Set realistic expectations during current construction  Align stakeholders around a common plan  Seek consensus and action on “Quick Hits”  Perform preliminary engineering – refine cost estimates  Organize and energize all stakeholders to advocate for these changes  Gain federal support

21 Thanks for your attention. Questions?