ROS Meeting November 8 th, 2012 SSWG 13DSB Case Preparation Extraordinary Dispatch.

Slides:



Advertisements
Similar presentations
Development of an Illinois Energy Efficiency Policy Manual A Proposed Process and Approval Plan Presented by: Karen Lusson Illinois Attorney General’s.
Advertisements

1 New Generation Commissioning Emal Latifzai Operations Support Engineer New Generation Information Forum ERCOT Public November 4, 2014.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
SRC Application Process Fall 2014 Version: November 12, 2014.
ERCOT Emergency Load Response Sam Jones Paul Wattles Steve Krein PUC Demand Response Workshop Sept. 15, 2006.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
NERC LTRA Update / CDR Capacity Counting Issues
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Limited Proceedings Water & Wastewater Reference Manual1.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
RTWG Report to TAC August 5, 2010 Howard Daniels.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
April 23 rd OWG UFLS Survey & Power Factor Review.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
Interconnect Policy & Contract
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Generation Deliverability Criteria PLWG September 17, 2014 Jeff Billo, ERCOT 1.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
ERS Update – DSWG Presentation September 21, 2012.
Operations Report Kent Saathoff System Operations ERCOT.
South Texas Electric Cooperative Load Forecasting Methodology ROS Meeting, 6/10/10.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Review of Integration of the Requirements of MOD Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
1 Module: Enviance Glossary Speaking the Same Language.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
1 WMS Report TO TAC April 2007 (which is in March)
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
1 With the increase in solar and wind generation we would like to stream line the process Currently TDSPS are required to send ERCOT ESI ID Generation.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Generation Adequacy Task Force Meeting April 10, 2014.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
PLWG Report to RPG January 21, 2014 Presented by John Moore, PLWG Chair.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
OOM During Alerts ERCOT TAC June 7, 2007 Dan Jones Potomac Economics.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
UFLS Survey Explanation
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT 2011 Five-Year Transmission Plan Update
PLWG Review 6.9 and the Interconnection process
Southern Cross Directives Planning Items
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Generation Adequacy Task Force Update to WMS
0433: Inclusion of the Transmission to Distribution “System Operator Agreement Guidelines” within the Offtake Arrangements Document.
Presentation transcript:

ROS Meeting November 8 th, 2012 SSWG 13DSB Case Preparation Extraordinary Dispatch

2 SSWG Procedure Manual Excerpt Extraordinary Dispatch Conditions On occasion, the total load plus the spinning reserve indicated above in later year cases can exceed the amount of available generation due to load forecasts in later year cases. SSWG base cases typically model load at individual coincident TSP peaks instead of at the ERCOT coincident system peak. When such a condition is encountered in future cases, ERCOT may increase generation resources by taking the indicated action, or adding generation, in the following order: 1.DC ties dispatched to increase transfers into ERCOT to the full capacity of the DC ties. 2.Increase NOIE generation with prior NOIE consent 3.Mothballed units that have not announced their return to service. The methodology for this procedure is detailed below. 4.Ignore spinning reserve. 5.Add publicly announced plants without interconnect agreements. 6.Black start Units 7.Add generation resources at the sites of retired units.

13DSB Case Implementation 3  13DSB’s 14SUM1, 15SUM1 and 16SUM1 Cases: Steps 1 through 4 were employed. Varying need for mothballed units.  13DSB 16MIN Case: No extraordinary dispatch was required.  13DSB 17SUM1 Case: Steps 1 through 4 were employed. Mothballed units were fully dispatched. One unit with rolling service date amendments was fully dispatched.  13DSB 18SUM1 Case: Steps 1 through 4 were employed. Multiple units with rolling service date amendments were dispatched. *Summarized Implementation from ‘Extraordinary Dispatch’ Document (Filed on POI Website)

Pending PGRRs (2013 Case-Building) 4 PGRR018: Additional Prerequisites for Modeling New Generation: … (a)Financial Commitment and Notice to Proceed; (b)ERCOT Notification of Requisite Air Permits; and (c)Demonstrated Rights to Sufficient Water PGRRxxx: SSWG 6-Year Case o Protocol and Planning Guide language is under PLWG review for inclusion of a 6 th Year-Out case into SSWG’s DSB cases o 14DSB Cases: Will include 2020 Case and Load Forecast *Both of these PGRRs are anticipated to exacerbate the issue of limited generation availability!