Kentor Gold March 2012 Investor Presentation. Focus 2 1.Andash Gold Copper Project – Kyrgyzstan 2.Jervois Copper Gold Project – Australia 3.Murchison.

Slides:



Advertisements
Similar presentations
1 ASX Listing Rule Amendments – Reporting Requirements for Mining Companies and the JORC Code 2012 ASX Presentation 2013.
Advertisements

Heemskirk Tin Project - Tasmania Tim Callaghan Geology and Resources September ASX: SRZ.
Cleveland Mining Company Limited Management, Strategy & Projects August 2013 David Mendelawitz Managing Director ASX CodeCDG.
Queensland Industrial
An Emerging Western Australian Gold Company What’s down the track forum presentation JON PRICE October 2013.
HERALD RESOURCES PROMISING FUTURE IN BASE METALS.
TRANS-SIBERIAN GOLD PLC 30 June 2014 Annual General Meeting TRANS-SIBERIAN GOLD.
Creating a New Exploration Growth Story March 2009.
May 13, TSX-V:OCO, Frankfurt:OR6, US OTC: ORRCF.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
June 29, 2007 Research Capital Presentation Alex Pannu Iain Brown Jim Simpson John Braden DISCOVERY-CORP ENTERPRISES INC.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
1 Mineral Enterprise Corporation Investor Presentation MINENCO.
The Rapu Rapu Project Lafayette Mining Limited. Overview People Project - Location - Description - Social and Political - Statistics Prospects - Schedule.
Results & Outlook BVN LISTED NYSE Compañía de Minas Buenaventura S.A.A. September, 2004.
Arafura Resources Limited (ASX: ARU) Arafura Resources Limited 2 nd Annual Technology Metals Summit April 2013, Toronto.
TSX: SGR OTCQX: SGRCF 1 SAN GOLD CORPORATION CORPORATE PRESENTATION TSX: SGR OTCQX: SGRCF JUNE 2013.
CanAlaska Ventures Ltd This slide show presentation contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States.
Perlat Project Volcanogenic Massive Sulphide Copper, Gold, Silver, Zinc Mr. Zahir (Zip) Dhanani Chairman, CEO and Director Mr. Robert Naso General Manager.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
June 2005 EUROGOLD LIMITED (ACN ) ASX & AIM: EUG.
1 Annual General Meeting November What we’ve done Where we are Barra Resources Ltd The Year in Summary  High Grade Wahloo Shoot discovered at.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
September 2009 ASX: GDO JSE: GDO OTCQX: GLDZY Africa Investor Series.
RESOURCES AND RESERVES JANUARY Investor Presentation | April 2013 | 2 A.1RESOURCE ESTIMATES Resources are inclusive of reserves. All resources and.
Important Information NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, INTO OR WITHIN THE UNITED STATES OR TO.
Investor Presentation | April 2013 | 1 BATHURST RESOURCES ASX SPOTLIGHT CONFERENCE May 2014.
Doing Business in Central Asia – Kyrgyz Republic and Mongolia John Pearson, Vice President Investor Relations.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
TOP 10 AUSTRALIAN GOLD PRODUCER AUSTRALIA’S LARGEST TIN PRODUCER DEVELOPMENT & GROWTH PROJECTS STRONG FISCAL POSITION ASX: MLX OTCQX: MTXXY GR: FG5 AN.
TSX-V: OCO Frankfurt: OR6
Africa Down Under in Singapore November 7, 2013 Allan Mulligan.
Apollo Minerals Limited Iron ore and base metals in Australia and Africa Apollo Minerals (ASX: AON) is a minerals exploration company focused on identification,
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
Investor Presentation. 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements.
KENTOR GOLD LTD ACN Lead Manager & Underwriter: Tolhurst Noall Limited Lead Manager & Underwriter: Tolhurst Noall Limited Co-Manager to the.
Directors Directors / Management Bongani Mbindwane (Chairman & CEO), BA (Law), Dip. Environment Management Joshua Hattingh (Executive Director - Tech),
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
Natural Resources Reporting Workshop Dublin Castle, May 15, 2009
Ramping-up to Full Capacity Investor Presentation February 2009.
Queensland - Overview Population – 4.56 million Land – million square kilometres (just over 3x size of France!) GSP – $A258 billion Capital City.
Bullabulling Gold Limited the merger of Auzex Resources Limited and GGG Resources plc March 2012.
BROKER PRESENTATION December Disclaimer & Confidentiality Notice  The information contained in this Presentation or subsequently provided to the.
SYDNEY MINING CLUB CLUB 5 DECEMBER Outline of Presentation  the answer  the question  the explanation:  How we got here  Coal cash flow leverage.
February Project Location The Company ●Platinum exploration in the PGM rich, Bushveld Complex ●Bushveld Complex houses 75% of the world Platinum.
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
2 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements with respect to.
MINERALS CORPORATION The Beginning of Chapter 2… June 2009.
CERBA Annual Mining Conference 2011 Success in Central Asia John Pearson Vice President, Investor Relations.
11 ASX: RXL Successful Base Metals Exploration Diggers & Dealers Presentation 5 August 2015.
Tanzania and Namibia – Golden Opportunities. DISCLAIMER disclaimer tsx-v:hrc This presentation may contain forward-looking statements.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
Melbourne Mining Club Cutting Edge Series March 2008 Company Overview.
Copper Bay Limited Presentation March Copper Bay Limited – Investor Presentation – March Overview  A Chilean-focused resources company 
Max Maczurad September 2011 Level 3 Hyatt Centre 123 Adelaide Terrace East Perth WA 6004 Tel: WINGELLINA NICKEL AND COBALT.
Dundas Magnetite Project Jan 2011 Presented: Paul Poli, Executive Chairman Author: Dave Fielding.
1 UK/Europe September 2003 The Tampakan Project. 2 INDOPHIL-THE COMPANY Market Listed ASX (IRN) Share price $ Aug 2003 Capitalization $47 M Capital.
JUMBUCK May 2016 GOLD PROJECT Gawler Craton - South Australia.
NT LITHIUM ASX code: CXO PROJECTS. | LITHIUM potential | July 2016 | Core Exploration Ltd 2 DISCLAIMER.
CORPORATE PRESENTATION
Developing a Canadian Gold Deposit
Principles of and requirements for public reporting of mining companies by securities regulators with the Australian example of JORC, ASIC and ASX. Ian.
An overview of the CRIRSCO International Reporting Template
EV Battery Metals Nickel Copper Cobalt Lithium
AGM Presentation November 2018
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
PicIORUL ZIMBRULUI & MAGURA NEGRA
Blueberry.
Manaila Polymetallic Mine
Presentation transcript:

Kentor Gold March 2012 Investor Presentation

Focus 2 1.Andash Gold Copper Project – Kyrgyzstan 2.Jervois Copper Gold Project – Australia 3.Murchison Gold Project - Australia

3 Overview KENTOR GOLD Corporate Summary ASX CodeKGL Share price (09/03/12)A$ week high / lowA$0.70 – A$1.46 Shares on issue106.2 million Options on issue2.7 million Market capitalizationA$155 million Cash (31/12/11)A$34 million DebtNil Top shareholdersPercentage holding KMP Investments12.75% JPMorgan Nominees11.80% National Nominees5.21% KENTOR GOLD 80%100% Andash Mining Company (Kyrgyz Republic) Jinka Minerals (Australia) 100% Andash Gold Copper Andash Gold Copper 100% Murchison (Au) Jervois (Cu, Ag, Au, Pb, Zn)

John Barr AM, MAICD Chairman, Non-Executive (Former director Oxiana, Transurban, Acacia and Iluka) Simon Milroy B.Eng (Mining) Managing Director (Formerly GM Project Development for Pan Aust, former Mining Manager Kingsgate) Hugh McKinnon B.Eng. (Mining) Executive Director, Country Manager (Has worked on mining and exploration projects across Central Asia since Resides in the Kyrgyz capital of Bishkek and speaks Russian) Andrew Daley BSc (Hons) (Mining) Director, Non-executive (Andrew has a background in corporate finance and is also on the board of Pan Aust) John Taylor B. Eng (Chemical); MBA Director, Non Executive (John Taylor is currently the MD of Outotec Australasia) Experienced Board BOARD & MANAGEMENT 4

Kyrgyz Republic  Country well connected by rail - direct rail access to markets in Kazakhstan, China, Russia and Europe  Long history of gold mining (Kumtor production 500,000oz per annum)  Population 5 million KYRGYZ REPUBLIC 5  Other Western companies active in the resources sector: - Centerra - Goldfields - Santos - Manas Resources - Chaarat Talas Valley

7.9g/t Au 6 g/t Au at 1.5g/t Au, 1.4% Cu Andash Overview 6 ANDASH PROJECT  One of the world’s lowest cost gold mines - Low Strip Open pit - Standard Flotation - High grade concentrate  Significant resource & reserve base  Excellent Exploration Potential - Further upside from Zones 2 & 3 - Potential 10+ yrs mine life  Local approval imminent - Strong engagement at federal level - Government to own 20% of project  12 month construction programme - All machines commissioned

Easy topography Low elevation Good road access Nearby rail Nearby power Nearby water Above: View from Andash ore body looking south Overview (cont’d) ANDASH PROJECT 7

Gold g/t  Wide ore body, bulk mining  Outcrops  Low strip ratio 0.72:1  Conventional open pit & flotation  Base of pit follows footwall  High grade starter pit Andash Long Section ANDASH PROJECT 8

Andash Cross Section 320 m E 9 ANDASH PROJECT

Andash JORC Reserve Estimate CategoryTonnage (kt) GradeMetal Au (g/t)Cu (%)Au (oz)Cu (t) Proven* 4, ,20518,275 Probable* 11, ,52545,211 Total 15, ,73063,486 Andash JORC Resource Estimate CategoryTonnage (kt) GradeMetal Au (g/t)Cu (%)Au (oz)Cu (t) Measured4, ,46319,538 Indicated15, ,56057,770 Total 19, ,02377,308 Inferred , Andash JORC Resource & Reserve *Ore Reserve estimated using assumptions of US$525/oz gold and US$3,000/t copper ANDASH PROJECT 10

 3 stage crush, grind, float process - 1.6mtpa to 3.2mtpa throughput  Initial mine life 6 years - Zone 2 and 3 potential to extend mine life to 10+ yrs - Further upside from nearby exploration targets  Annual production of 70,000 oz Au and 7,400t Cu  Capital Cost US$96m*  Cash cost US$29/oz Au**  High grade concentrate 24.5% Cu and 72 g/t Au - No deleterious elements  Royalties – Gold 5%, Copper 3% Andash Project Economics (KGL 80%) ANDASH PROJECT Project NPV (US$) Gold Price Copper Price (US$/lb) (US$/oz) , , , , , *capital cost under review, to be confirmed prior to development **after Cu credits and royalty at a long term Cu price of US$2.75/Ib

Andash Zone 2 and 3 ANDASH PROJECT  Explored by adits  30 diamond drill holes  Located 1 km west of Andash Zone 1  Exploration target of 5 to 10 mt of 1 to 1.5 g/t gold*  Potential to increase Andash mine life to 10 yrs + * The potential quantity and grade of the Exploration Target are conceptual in nature and there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource. 12

Jervois Copper Project JERVOIS PROJECT (AUSTRALIA)  100% Interest  Granted Mining License  Land Holding 38 km 2  12km of prospective strike Outcropping Copper Ore 13

 Inferred Copper Resource of % Cu and 25.2 g/t Ag - 150,500t of contained copper and 9.7 m oz contained silver  Additional Exploration Potential of 5.0 – % Cu and 10-25g/t Ag - 50,000 to 100,000 tonnes Cu and 3 to 5Mozs Ag  Gold frequently present in mineralisation but original drilling not tested for gold - potential for significant gold resource Reward Ore body Long Section 14 JERVOIS PROJECT (AUSTRALIA)

Bellbird ore body Long Section 15 Green circles are drill hole pierce points JERVOIS PROJECT (AUSTRALIA)

Murchison Gold Project  Consists of the Burnakura and Gabanintha sites  700,000 ounce Inferred 1.5g/t - 20,000m RC drill programme underway to infill and increase resource  Plan to commence production in June 2012 MURCHISON GOLD PROJECT (AUSTRALIA) 16

Existing Infrastructure MURCHISON GOLD PROJECT (AUSTRALIA) 17

Lewis Pit g/t 9.6 g/t MURCHISON GOLD PROJECT (AUSTRALIA)

4 Stage Growth Strategy 19 1.Refurbish and restart existing CIL Plant 2.Add a heap leach circuit to treat low grade ore 3.Expand plant to 500,000 tpa 4.Flotation of copper gold ore MURCHISON GOLD PROJECT (AUSTRALIA)

Stage 1 Restart CIL Plant 20  Expand to 260,000 tpa  High grade production – 3 g/t gold  Commence production in June 2012  Initial Production Rate 24,000 oz gold p.a.  Capital cost $14.8m  Stage 1 cash cost $1,224 / oz MURCHISON GOLD PROJECT (AUSTRALIA)

Crushing and Heap Leaching Equipment 21 Note: Photographs of equipment on site at the Indee mine site MURCHISON GOLD PROJECT (AUSTRALIA)

Tonnes (mt) Grade Au g/t Grade Cu% Grade Ag g/t Gold (oz) Copper (t) Silver (Oz) Andash Inferred , Jervois Inferred ,5009,700,000 Burnakura Inferred ,000 Gabanintha Inferred ,000 Andash Indicated ,64357,770 Andash Measured ,04619,538 Total Resources ,412,039228,7589,700,000 Kentor Group Resources 22

Conclusion Near term gold production Active exploration programmes at all Australian sites Strong news flow Strong cash position Pipeline of projects Increasing resources 23

24 Forward-Looking Statements: This presentation includes certain “Forward-Looking Statements”. All statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast cash flows and potential mineralisation, resources and reserves, exploration results and future expansion plans and development objectives of Kentor Gold Limited are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Simon Milroy on or visit For more information contact KEY CONTACTS ASX Code: KGL Level 9, 40 Creek Street, Brisbane, QLD, AUSTRALIA 4000 Fax:

 Competent Persons Statements  The information in this report that relates to mineral resource estimation for Gabanintha and Burnakura is based on work completed by Mr Jonathon Abbott is a member of the Australasian Institute of Mining and Metallurgy. Mr Abbott has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Abbott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.  The data in this report that relates to Mineral Resource Estimates for Jervois is based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Tear is a full-time employee of Hellman & Schofield Pty Ltd and he consents to the inclusion in the report of the Mineral Resource in the form and context in which they appear.  The Resource estimates for Andash in this report are based on information compiled by Dr. Phil Newall, who is a Chartered Engineer and Fellow of the Institute of Materials Minerals and Mining and a full time employee of Wardell Armstrong International. Dr. Newall has sufficient experience which is relevant to the style of the mineralisation and the type of deposit under consideration and to the activity to which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr. Newall has consented to the inclusion of this information in the form and context in which it appears in this report.  We advise in accordance with Australian Stock Exchange Limited Listing Rules 5(10) and 5(13) that the exploration results for Burnakura and Gabanintha are based on information compiled by Mr Nigel Cranley of Plutonic Geological Services who is a corporate member of the Australian Institute of Mining and Metallurgy. Mr Cranley is not a full time employee of Jinka Minerals Limited and has consented in writing to the inclusion in the presentation of matter based on the information so compiled by him in the form and context in which it appears.  The exploration data in this report relating to the Jervois project is based on information compiled by Rudy Lennartz, who is a member of the Australian Institute of Mining and Metallurgy and a full time employee of Jinka Minerals Ltd. Mr. Lennartz has sufficient experience which is relevant to the style of the mineralisation and the type of deposit under consideration and to the activity to which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Lennartz has consented to the inclusion of this information in the form and context in which it appears in this report. 25