Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.

Slides:



Advertisements
Similar presentations
Westar Energy Smart Grid
Advertisements

RES-E Impact on Transmission Grid and Power System Reserves
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
GridWise ® Architecture Council Becky Harrison GridWise Alliance Future of the Grid Evolving to Meet America’s Needs.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
“Investment in Transmission” Economics of Electricity Markets – IDEI Toulouse, 2-3 June 2005 Jon Carlton – Director of Network Strategy.
Improving Network Access in Europe’s Periphery Panos Coroyannakis CPMR Energy Working Group “Energy for the Periphery” Pamplona 5-6 October 2006.
Towards Regional Independent Operators – a main driver for successful market integration.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
Amount and cost of losses June 11 th Florence School of Regulation Jose Luis Mata.
1 Smart Distribution Systems: Sustainability Issues S. S. (Mani) Venkata Alstom Grid and University of Washington (UW)
August 8, 2015ECI Confidential. AccessWave Smart Grid Market Trends& Applications Matthias Nass VP Field Marketing EMEA.
EU Commission Task Force for Smart Grids Expert Group 3: Roles and Responsibilities of Actors involved in the Smart Grids Deployment Samia Benrachi-Maassam.
Answers for infrastructure and cities. © Siemens AG 2013 All rights reserved. Energy meets intelligence METE TAŞPINAR Smart Grid The Smart Grid - Constant.
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Frankfurt (Germany), 6-9 June 2011 Power System Impacts from Large Scale Deployment of EV -The MERGE project – João A. Peças Lopes
ABB Switzerland Ltd. Christoph Haederli
1 The Tres Amigas SuperStation VLPGO November 2011.
Transition of Electric Grid of Bangladesh to the Smart Grid Presented by: Abir Chowdhury, ET S.M. Eftehar Uddin Chowdhury, ET Department of.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
Electric vehicle integration into transmission system
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Overview What's is micro grid Over view of electric grid
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Jeroen de Joode (ECN/Delft University of Technology) Michiel van Werven (ECN) An analysis of potential bottlenecks Optimal Design of Future Electricity.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
DISTRIBUTED GENERATION, RENEWABLE ENERGY AND SUSTAINABILITY. IMPACT ON POWER QUALITY AND NETWORK PLANNING “Inauguration of the 6th Framework Programme”
20th Century Electric Transmission Grid
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Electric Energy Systems Smart Grids and IEA ENARD – Annex II: DG System Integration into Distribution Networks Helfried Brunner Operating Agent AnnexII.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Smart Grid Schneider Electric Javier Orellana
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Dated: 17 February 2016 Instructor :Kashif Mehmood.
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Women In Energy Conference Kingston, Jamaica March 10, 2016.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Évora demonstrator site
Agenda TSOG 8th November
HYBRID MICRO-GRID.
IG BASED WINDFARMS USING STATCOM
STATE ENERGY AND WATER REGULATORY COMMISSION
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
The Transition to a High DER Future
Electricity Distribution Network Design Training & Courses
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
EU-IPA12/CS02 Development of the Renewable Energy Sector
Integrated Distribution Planning Process
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Supplemental Project Planning Process Under Order 890 Within PJM
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
July update JANUARY 2019.
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1 PFEIFFER – DE – RT.5b

Frankfurt (Germany), 6-9 June 2011 Content  Characteristics of Grid Planning  Market-based Planning process  Coordination for secure system operation  Technical and economical benefits of Coordinated Planning 2

Frankfurt (Germany), 6-9 June 2011  Top-down process in a static environment  Dispatchable generation mainly on the transmission level  Generation on distribution level often not significant  Load and exchanges well predictable by TSOs and DSOs  Dimensioning planning cases could easily be determined Characteristics of Grid Planning in the past 3

Frankfurt (Germany), 6-9 June 2011  Volatile market environment with generation dispatch driven by market economics  Dispatchable generation on transmission and distribution level  Rapidly evolving non-dispatchable generation on transmission and distribution level (on- and offshore wind, photovoltaics, …)  Demand and, in particular, cross-border exchanges hardly predictable by TSOs  Development of planning-cases requires intense exchange of information between TSOs and DSOs Characteristics of Grid Planning today and in future 4

Frankfurt (Germany), 6-9 June 2011 Market-based Grid Planning Process Market analysis Generation and demand portfolio Time-series of market-based generation dispatch including (non-dispatchable) renewable generation Time-series of demand including imports/exports Planning cases Criteria for relevant planning cases Transmission characteristics (transmission distances, …) Supply characteristics (peak-load, …) Grid analysis Load-flow and short-circuit calculations for base-case and contingency analysis System stability analysis by dynamic studies Determination of grid reinforcements 5

Frankfurt (Germany), 6-9 June 2011 Coordination for secure system operation  From a systems engineering approach the transmission and distribution systems and their users (generators, DSOs and end-consumers) need to be considered.  Close cooperation of TSOs, DSOs and system users in normal and disturbed operating conditions is a prerequisite for secure system operation.  The behaviour of all system-users needs to be robust against perturbations and appropriate in normal and disturbed operation-conditions in order to preserve or to re-establish system security.  In particular generating units on all levels play an important role because of their ability to provide ancillary services and to operate stably in disturbed operating conditions. 6

Frankfurt (Germany), 6-9 June 2011 Why are requirements for generators so important?  Generating units connected to the transmission and distribution systems shall provide contribution to supply ancillary services to: Preserve system security and Improve system adequacy  Objectives of requirements for generating units: Provision of information for system management System balancing / frequency stability Voltage stability Robustness of generating units against perturbations (stable operation) System restoration after a disturbance 7

Frankfurt (Germany), 6-9 June 2011 Requirements for other customers  DSOs and end consumers Preservation of system security by load shedding Contribution to voltage stability by limiting and/or compensating reactive power consumption  DSOs transfer of TSO-requirements relevant for system security for generation units and end consumers connected to the distribution grid Communication and information exchange between TSOs and DSOs  End consumers Preservation of supply quality by limiting emissions like (inter-)harmonics and/ or flicker 8

Frankfurt (Germany), 6-9 June 2011 Need for common standards - keypoints  Analysis of large-scale disturbances (e. g. Nov., 4th, 2006) revealed that compatible requirements relevant for system security are strongly desirable on transmission and disribution level  Coordinated actions of TSOs and DSOs  Requirements for distribution system users (including entitlements to TSOs) gain significance for system security, in particular due to the emerging number of dispersed generation units 9

Frankfurt (Germany), 6-9 June 2011  TSOs need to expand transmission capacity Facilitating the internal European electricity market Integration of renewable energy sources  DSOs need to replace/ refurbish existing lines Integration of renewable energy sources Ageing structure of distribution grids Initial situation for TSOs and DSOs 10

Frankfurt (Germany), 6-9 June 2011  New lines are cost-intense  Public opposition is strong  Permission procedures are time consuming  New routes are demanding to find due to Visual impact Protected areas Existing buildings Restrictions for new lines 11

Frankfurt (Germany), 6-9 June 2011 Solution: combining new routes TSO DSO TSO & DSO 380kV 110kV 380kV 12

Frankfurt (Germany), 6-9 June 2011  Regions with limited availability for new routes Only common TSO+DSO-routes may be feasible Permissions under public and private law may be easier to achieve  Less environmental impact  Distances to buildings etc. can be kept  Lower costs for maintenance of lines and routes Solution: combining new routes 13

Frankfurt (Germany), 6-9 June kV 110 kV 120 MVA ratings: 200 MVA 100 MVA Load Transformer 110-kV-line Coordinated planning for optimized grid structures EXAMPLE 14 Load

Frankfurt (Germany), 6-9 June 2011  Distributed locations of transformers enhances the reliability and robustness of supply: Risk of loss of supply due to out-of-range- contingencies is minimized Substation-blackouts have less influence Common-mode failures of lines have less influence Loss of supply can be limited locally Improved security of supply 15

Frankfurt (Germany), 6-9 June 2011  Distributed locations of transformers enhances the quality of supply: In particular in rural areas with long supply distances the voltage profile of the distribution grid is evened Evened power flow in the distribution grid Reduced losses in the distribution grid Improved quality of supply 16

Frankfurt (Germany), 6-9 June 2011  Common planning of TSOs and DSOs results in technical and economical benefits: Optimized transformer capacity between transmission and distribution grid less lines in the distribution grid substations with less complex/ expensive design  Economical benefits for customers Less equipment  less expenses  lower system usage tariffs Economical benefits 17

Frankfurt (Germany), 6-9 June 2011 Summary  TSO/DSO coordination and cooperation is essential for Efficient planning processes Secure system operation  Coordinated planning provides Technical benefits  improved security and quality of supply  Optimized grid structures Cost benefits  Combined lines  Efficient use of assets (e.g. transformer capacities)  Cost efficiencies 18

Frankfurt (Germany), 6-9 June 2011 Substation layout I Transformer overhead line circuit breaker disconnector busbar 19

Frankfurt (Germany), 6-9 June 2011 Substation layout II Transformer circuit breaker disconnector busbar 20 overhead line