Brussels April 16th 2007 Technical Audit of Oil & Gas Pipelines PNIS Project Contract : 1,4 M € Consortium : Technipipe/AETS www.technipipe.com from July.

Slides:



Advertisements
Similar presentations
Organisational Effectiveness Consulting Achievements Organization Effectiveness Consulting is a full-service organizational development consulting team.
Advertisements

1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
TECH Project Company X Documentation Plan Champion/Define Phase
pipeline-solutions Progis PROGIS Software AG Software that Shows ! Geographical Information System System for Pipeline Management PipeGIS.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
IWOLTE Integration of Workplace Learning in Vocational Teacher Education ”How to be a Teacher in Vocational training”
Auditing Computer Systems
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
PODS: a review and the patterns for implementation Janet Sinclair PODS Association.
Georgia as the Regional ICT Hub and Ecosystem for Partnership Irakli Kashibadze Head of Communications, IT and Innovations Department Ministry of Economy.
Project quality management Cody Ronning 3/23/2015.
EURIDICE project Evaluation of image database use in online learning environment 11/
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Developing Marketing Strategies and Plans Chapter 2.
Philippe LE TERTRE IS Governance Consultant  Founder and managing partner of VADEGIS (company specialized in Information System Management.
Pipeline Corrosion Management NACE Houston Section April 9, 2013 Drew Hevle - Manager, Corrosion Control Kinder Morgan Natural Gas Pipeline.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Virtual Team.biz Presentation of business model 20/08/20151Business model.
CMM Level 3 KPA’s CS4320 Fall Organizational Process Focus (Goals) Software process development and improvement activities are coordinated across.
 Contoso is working on Wireless 1xEvDo application to handle high speed 3G application data transfer (voice, video data) in mobile phones while working.
BIS310: Structured Analysis and Design Introduction and Systems Planning Week 1.
Ilie Dumitrescu National Institute of Statistics Third International Conference on Agricultural Statistics MEXSAI-ICAS-III Cancun- Mexico, 2-4 November.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Energy Security Challenges in Ukraine: A snapshot 1.
Company and Marketing Strategy: Partnering to Build Customer Relationships 2 Principles of Marketing.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Project Cycle Management for International Development Cooperation: Applied Presentation of the course Teacher Pietro Celotti Università degli Studi di.
Strategic Management of IS/IT: Organization and Resources
1 Europe and CIS Jacek Cukrowski AfT Team Leader, UNDP, Europe and the CIS Bratislava Regional Centre AID FOR TRADE FOR CENTRAL ASIA, SOUTH CAUCASUS AND.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Brussels April 16th 2007 Association of the French Consultants in Petroleum Association of 70 Individual Members & 7 Partners Members (SME) with its communication/cooperation.
ESPON Seminar 15 November 2006 in Espoo, Finland Review of the ESPON 2006 and lessons learned for the ESPON 2013 Programme Thiemo W. Eser, ESPON Managing.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
1 UNI Europa Finance Sales and Advice campaign strategy Fair Advice?! MiFD Project meeting, Brussels, 6 th July 2011.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
2010/12/10 First Skills Council Meeting Brussels, April 14 th 2014 Federico Brugnoli.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Pipeline Safety New Orleans Nov. 18, 2011 Getting to Zero.
IRIS - International Railway Industry Standard The Quality Standard for the Railway Industry ACRI Prague, 2nd April 2008 Angela de Heymer Manager Quality.
“BuildUpSkills II, ENERGOTRAIN project goals and activities in Lithuania.” Dr. Vaidotas Šarka Lithuanian Builders Association Lithuanian Construction.
Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project: BUILD UP Skills.
BEtter management and implementation of NATURa 2000 sites Zsuzsa Fidlòczky Nimfea Environment and Nature Conservation Association (LP) Hungary Brussels,
CE 726 STRATEGIC MANAGEMENT OF CONSTRUCTION COMPANIES INTRODUCTION 10 TH FEBRUARY, 2006 BY Assoc. Prof. Dr.Irem Dikmen Toker.
Seminar on strategies, forecasts and scenarios of APEC economies energy system development (self-funded project proposal) Department of International Cooperation.
Idaho Energy Plan Proposal (RFI) Energy Policy Institute (EPI)
1 2 nd Expert Group Meeting Euro-Asian Transport Linkages 3-5 November 2004, Odessa Asian Highway Network providing Euro-Asian Highway Linkages M. B. Regmi.
Pipelines study – final report European Commission, DG Environment Industrial Emissions, Air quality & Noise Unit 1.
Progress report Study Group 3.2 SPONSOR Daniel Falabella (Argentina) DEPUTY Mohd Nazmi (Malaysia) S.G. LEADER Abderrahame Taberkokt (Algeria) Mar del Plata.
Community Plan Implementation Training Training of Trainers LUNCH Community meeting Practice presentation process KLO presentations CBO presentations.
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
Managing Training Institutions: Welcome Session MOA – FAO – TCP Workshop Beijing 9 July 2012.
Chapter 3 Pre-Incident Preparation Spring Incident Response & Computer Forensics.
Key Leader Orientation 3- Key Leader Orientation 3-1.
Modern Systems Analysis and Design Third Edition Chapter 2 Succeeding as a Systems Analyst 2.1.
ERINHA: Framework for the biological high containment research infrastructure STOA – AVIESAN Workshop June 19th 2012, European Parliament, Brussels.
Cost effective while providing customer focused solutions.
Stoimen Stoimenov QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
BUDAPEST DANUBE CONTACT POINT: an innovative tool to support the implementation of the Danube Strategy David Pelech Budapest Danube Contact Point 6 th.
Qingrui Huang Green Jobs Learning and Planning Meeting Bangkok, Thailand 28 April, 2014 Skills Development Project for Green Jobs in the Energy Efficiency.
1.ARCHITECT 2. ATHLETE 3.TEACHER. ARCHITECT FAST LOOK Salary * * * * * excellent Occupation size * * above average Job stability * * above average ARCHITECT.
CONTACT US : Magnific training INDIA : USA:
Towards a dependable and sustainable National IT Infrastructure MANAGING IT INFRASTRUCTURE ASSETS: IMPLEMENTATION NEEDS.
1 CAMBODIA COUNTRY PRESENTATION Workshop for Capacity Building for Monitoring and Evaluation of Education Development Plans November 2003, Thailand.
Advanced Software Engineering Dr. Cheng
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
MAES Working Group Meeting Brussels
Module 5 The Climate Expert and your role as a consultant
Status and Plan of Regional WIGOS Center (West Asia) in
Presentation transcript:

Brussels April 16th 2007 Technical Audit of Oil & Gas Pipelines PNIS Project Contract : 1,4 M € Consortium : Technipipe/AETS from July 2005 to December 2006

Brussels April 16th 2007 Technical Audit PNIS Maintain and improve the long-term integrity of the Central Asian Oil & Gas pipelines export to EU, Overcome the gap of working environment between NIS and Western oil & gas pipeline companies. Use the establishment of a Pipeline Network Information System as a basis for transfer of technology and procedures to the gas transmission companies of Central Asia.

Brussels April 16th 2007 Technical Audit PNIS

Brussels April 16th 2007 Technical Audit PNIS Overall objectives The industrial tool, the pipeline network should no longer be seen as a black box and should become totally transparent (glass box). At any moment, the actual state of the pipeline system and its evolution in time can be displayed. The best way to get people to really care for the cathodic protection is to show them concretely the consequences of an ill maintained system.

Brussels April 16th 2007 Technical Audit PNIS SWOT of The Beneficiaries Strengths -Large experience in pipelines & Strong organization -Good education background & Common working language (Russian) Weaknesses (issues) -Poor overall status of pipeline & no separate regulation organization -Lack of exposure to the new technologies and Western standards Threats (risks) -Competition between the Beneficiaries for leadership -Gaps of competence, procedures and technology will have to be filled Opportunities and Assumptions -The Steering Committee to reinforce the regional approach. -The ground for a team of regional expert will be explored

Brussels April 16th 2007 Technical Audit PNIS  Project Team based in Tashkent -Project Manager -Team Leader -Software Expert (PNIS) -Inspection/Maintenance Expert -Training/Inspection Expert -Teachers from Gubkin oil & gas University (Moscow) -Local Coordinator, Junior Expert, services

Brussels April 16th 2007 Technical Audit PNIS

Brussels April 16th 2007 Technical Audit PNIS Various phases of the Project : -Inception -4 Steering Committees (France, UZ, KZ) -4 Dissemination seminars (UZ, KZ, KY,TU) First 4 months : « Inception trips » :..Analysis of environment, identification and contact of partners/ beneficiaries, clarification of project objectives and strategy,..Approval from Beneficiaries of planned activities, specification of PNIS…

Brussels April 16th 2007 Technical Audit PNIS Khiva Training Center Intensive usage of Khiva Training Center (Gas transportation Training Center assigned to the project by Uztransgaz). Training Plan made up of 8 Modules designed after Competence/knowledge assessment Modules 1 & 2 : engineering, design, construction and maintenance of pipelines (Khiva, Almaty & Moscow) Modules 3 & 3bis : Inspection (using tools sourced from European suppliers)

Brussels April 16th 2007 Technical Audit PNIS Khiva Training Center Module 4 : On site Above ground Inspections (in Bishkek area) Module 5 : On line Pigging (in Samarkand with Rosen) of 40’’ x 156 km. Modules 6 & 7 : PNIS implementation operation & maintenance (theory only) Module 8 : Train the trainers (for the Beneficiaries to be able to train in their own countries)

Brussels April 16th 2007 Technical Audit PNIS Priorities as per the 4 dissemination seminars : 1) Build/refurbish Cathodic Protection on full pipeline network. 2) Implement a large training program on Cathodic Protection 3) Collect the Cathodic Protection status by transmission network 4) Walk Survey weekly (Cathodic Protection efficiency, coating damage) 5) Prioritize above ground inspection (DCVG) where the Cathodic Protection has failed or if the Cathodic Protection data are wrong 6) Dig out the pipeline where coating defects are suspected and carry out US measurements, eventually repair Conclusion

Brussels April 16th 2007 Technical Audit PNIS Priorities as per the 4 dissemination seminars : 7) Carry out intelligent pigging in the High Risk Areas 8) Develop an Integrity Management System/RBI (Risk Basis Inspection) 9) Develop repairs by clock spring method 10) Collect the Cathodic Protection Data in real time 11) Implement a PNIS 12) Implement a SCADA system (for new or revamped pipelines)

Brussels April 16th 2007 Technical Audit PNIS PNIS is a “Pipeline oriented Geographical Information System” applied as a “Pipeline Integrity Management System” It provides a tool to store and display the pipeline system (with pipe characteristics and inspection data) in its geographical environment It provides the computational analysis to determine segment length & segment proximity to geographical land marks It allows queries & reporting It helps the user to classify the pipeline segments by pipe characteristics (diameter, pressure, coating, etc.) by pipe status (inspection data) or by geographical land marks

Brussels April 16th 2007 Technical Audit PNIS PNIS optimizes maintenance through Risk Based Inspection RBI uses PNIS to : Segment the pipeline according to risk factors Identify risk contributors and deduce corresponding risk reducers Rank / Assign weights to the risk contributors Compute a risk factor per pipeline segment And then to focus inspection on segments that most need it