Welcome to First Hydro 16 July 2010. First Hydro Slide 2  Approximately 200 employees across four sites  Dinorwig –largest pumped storage plant in Western.

Slides:



Advertisements
Similar presentations
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Advertisements

Balancing Update Stakeholder Group Meeting - 4 November 2009.
10 February 2009 The Case for Coal Generation Sandy Rae, Energy Management Director.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Center for Strategic and International Studies – CCS event 31 st March 2008 Rachel Crisp Deputy Director, Cleaner Fossil Fuels Unit, Energy Group.
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
Exchange A1: The support required to make Energy Performance Contracting a viable energy and carbon solution (TEC) Steve Creighton, Senior Relationship.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
Renewable Targets and Policy Linda Pooley Head of Renewable Energy Technology and Investment Scottish Governmnet.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
Welcome to First Hydro Company 4 June First Hydro Slide 2  Approximately 200 employees across four sites  Dinorwig –the largest pumped storage.
Experience you can trust. 1 Solutions for large-scale wind power integration in the European system EWEC2009 Energy and power management Frits VerheijMarch.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
EE535: Renewable Energy: Systems, Technology & Economics Energy Storage.
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
©2014 Storelectric Ltd Making Renewable Energy Profitable and Traditional Energy Efficient Storelectric Ltd Compressed Air Energy Storage.
An Introduction to the Role of Carbon Capture and Storage in Ukraine Keith Whiriskey.
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
Generation Storage™: Tapping Texas’ Hidden, Flexible, Peak Capacity
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
Owen WILSON Environment and Sustainable Development Committee, EURELECTRIC POWER CHOICES EURELECTRIC Study on low-CO2 Europe by 2050 POWER CHOICES EURELECTRIC.
Demand Response – A New Option for Wind Integration ?
Energy conversion and storage Some energy sources have storage ‘built in’ Fossil fuels Biofuels Hydro power (to some extent) Others are available on demand.
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Impending Audit Landscape for Data Centres John Booth Carbon3IT Ltd
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Electric vehicle integration into transmission system
Communicating a Smarter Future Keynote at Network th annual distribution network strategy conference 16 February 2012 Sandy Sheard Deputy Director.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
UKCCS/003/001 - PRE098 - SEGEC Norway Visit - SP ACC Collaboration - 13 Oct 08.ppt CCS & Technology Development Group Carbon Capture and Storage Scottish.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Renewables and System Services Ann Scully.
The Australian Market Evolution Dr Brian Spalding Chief Operating Officer NEMMCO.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
© OECD/IEA 2015 Energy Efficiency Today: Mobilizing investment through Markets and Multiple Benefits Tyler Bryant International Energy Agency.
Hawaii Energy Storage Seminar: Utility Regulation Service
Energy Policy Group Developing the UK energy market: overview and assessment Bridget Woodman Energy Policy Group, University of Exeter
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
CEC/CPUC Energy Storage Workshop LADWP Pumped Hydro John R. Dennis LADWP Director Power Planning & Development November 20,
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Electricity Markets Simon Watson. Overview UK as exemplar The state-owned Electricity Supply Industry The Electricity Pool Hedging Your Bets! Deregulation.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
1 10. BUSINESS STRATEGIES IN ANCILLARY SERVICE MARKETS Asko Vuorinen.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
Electricity Market Reform – The case for capacity payments Steve Riley, CEO and President, IPR UK-Europe Nomura Utilities Conference, 22 June 2011, London,
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Integration.
Electricity Markets Simon Watson.
EE535: Renewable Energy: Systems, Technology & Economics
Matthew Wittenstein Electricity Analyst, International Energy Agency
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
WATER & POWER 4th INDIA WATER WEEK- 2016
CPDe Event The Changing Value in Flexibility 19th April 2018.
Coal – security of coal supply considerations of EURACOAL
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
The Role of Hydro-Québec in New England Electric Markets The New England Electricity Restructuring Roundtable June 14, 2013 Stephen Molodetz, Vice.
The logic progression... Northern Ireland has high wind penetration,
Jim Mcintosh Director, Executive Operations Advisor California ISO
July update JANUARY 2019.
Presentation transcript:

Welcome to First Hydro 16 July 2010

First Hydro Slide 2  Approximately 200 employees across four sites  Dinorwig –largest pumped storage plant in Western Europe –commissioned 1983 –total plant capacity 1,728MW –6 reversible pump/turbines –reservoir capacity ~10GWh  Ffestiniog –UK’s first major pumped storage station –Commissioned 1963 –total plant capacity 360MW –4 separate turbines & pumps –reservoir capacity ~1.3GWh  Electric Mountain visitor centre  Bala House trading office  Owned by International Power (75%)/ Mitsui & Co, Ltd (25%) since December 2004 First Hydro overview

First Hydro Slide 3 Pumped storage principle  Pump water overnight  Generate electricity during the day  Typical cycle efficiency ~ %  Closed hydraulic system Generating Pumping Power import Power export

First Hydro Slide 4 Asset features  Originally designed and built to support grid system management  Extremely high reliability and availability  Rapid speed of response –Dinorwig full output in ~16 seconds –Ffestiniog full output ~60 seconds  ~25,000 mode changes per year  Asset capabilities provide for a diverse range of trading and marketing opportunities Shut Down Generate Pump Spin Gen Spin Pump <30s 6m 7m 6m 3m <12s 6m <90s 8m 6m <30s DinorwigFfestiniogCCGT (hot)Coal (hot) Typical start-up times (minutes) Dinorwig mode transition times

First Hydro Slide 5 The role of First Hydro 1.Energy arbitrage - peak/off-peak –valuable peaking capacity –enables efficient running of steam plant overnight 2.Reserve provision –range of timescales (focus on fast) –but, limited storage 3.Frequency control –fast response to plant trips, TV pickups etc.  Roles underpinned by plant reliability and dynamic capabilities  Buying fuel and selling power exports via the same market  Diversity of revenue streams

First Hydro Slide 6 Optimising value Trading Bilateral, OTC, Power exchanges Half-hourly resolution shape and standard products Ability to deliver any half-hourly shape, and notify up to gate closure Expertise in prompt/spot trading Balancing Mechanism Bids and offers accepted on a minute-by-minute basis Adjusts final traded positions to match supply and demand Attractive, fast dynamics Ideally suited to covering plant trips, TV pickups etc. Ancillary Services System services procured by National Grid Facilitate system security, and power quality on a second- by-second basis Wide range of offered services including reserve, response, black start, reactive High quality offering, uniquely dynamic capabilities 2088 MW Capacity Energy limited 2088 MW Capacity Energy limited First Hydro competitive advantage Market features

First Hydro TV pick up: England vs USA 12 th June National Grid FHC Output over same period: Slide 7

First Hydro Slide 8 Dinorwig physical layout

First Hydro Slide 9 Dinorwig physical layout

First Hydro Underground cavern cross section Pump/Turbine Generator/motor Power station/unit cross-sections Slide 10

First Hydro Market review Slide 11  Significant market volatility Winter 05/06 and throughout 2008 –Positive impact of additional storage on utilisation/value in 2008  Less stress on system in 2009/10 –Impact of new build and recession-led demand reduction –But, some intraday volatility –Retain ability to capture value during ‘system shocks’

First Hydro Slide 12 Market outlook Projected New Build DECC – Updated Energy and Emissions Projects, June 2010 EU’s 2020 targets & UK commitments Large Combustion Plant Directive Industrial Emissions Directive Increased EU market integration EU’s 2020 targets & UK commitments Large Combustion Plant Directive Industrial Emissions Directive Increased EU market integration  Material levels of wind generation, new nuclear  Closure of 11 GW thermal plant by 2016  Limited hours operation on most remaining fossil plant from 2016  Greater levels of interconnection with EU  Material levels of wind generation, new nuclear  Closure of 11 GW thermal plant by 2016  Limited hours operation on most remaining fossil plant from 2016  Greater levels of interconnection with EU  Security and balancing challenges  Significant impact of wind intermittency  Increased spot market volatility  Premium on flexibility and reliability  Increased reserve requirement  Potential for reforms to market framework  Security and balancing challenges  Significant impact of wind intermittency  Increased spot market volatility  Premium on flexibility and reliability  Increased reserve requirement  Potential for reforms to market framework GB plant mix to change radically in next years

First Hydro Ancillary services developments  Demand for reserve services to increase –Impact of increased wind generation –Intermittency increases system risks across a range of timescales  Frequency response requirements to be revised upwards –To be consistent with increased wind generation, new generation nuclear reactors, and large offshore wind connections  New providers expected to enter these markets –Dynamic demand response –New OCGT plant  FH well positioned, with diverse capabilities Source Data: National Grid “Future Requirements” Slide 13

First Hydro Slide 14 Plant investment strategy Assess changing market environment Preserve competitive advantage Enhance capabilities Invest to maintain assets Invest to improve assets – Opportunities and challenges – Improve reliability/availability – Increase quality or range of products – Engineering integrity and plant life – Maintain current levels of performance – Focus on quality of core maintenance – Replace or refurbish ageing/obsolescent equipment – Retain expertise within business Additional storage Increased automation New runner

First Hydro Slide 15 Dinorwig additional stored energy  Extension of Marchlyn Mawr planned 2005/6  Permissions granted 2006  Completed October 2007  Increased storage by approximately 8%  Short payback period

First Hydro Plant automation  First Hydro despatch is already extremely accurate –99% of instructions are delivered within one minute of required time  Engineers manually accept instructions from grid and despatch the plant  Aiming to automate majority of despatch instructions –Improve despatch precision to maintain/enhance competitive advantage –Target 99% within 15 seconds  Automate progressively from 2011 to 2014 Slide 16 % Instructions Seconds early/late Based Jan-Jun >13000 instructions. 14 not delivered

First Hydro Turbine runner  2008 record utilisation; pumping costs >£100m  Re-established project to look at improving cycle efficiency  Turbine design optimised in 2007/8 via computational and physical modelling  Currently replacing a turbine with completion targeted for Q –Unit efficiency gain > 2% –Short payback period Slide 17

First Hydro Slide 18 Summary  First Hydro remains highly relevant to the UK system  Future market developments will increase the need for response and reserve –Providing critical reserves to support intermittent generation –Ability to “time-shift” excess wind generation off peak –Complement new nuclear build  Historic investment in plant has maintained integrity/longevity  Current investment program improves market position –Increases competitive advantage –Enhances ability to capture current and future value