Comparison of Five Different Methods for Determining Pile Bearing Capacity by Jim Long, Univ. of Illinois Wisconsin DOT February 6, 2009 Madison, WI.

Slides:



Advertisements
Similar presentations
Spring 2007 Dr. D. M. McStravick Rice University
Advertisements

Pile Capacity Based on Dynamic Methods & Wave Equation Bigman Hutapea-Prodi Teknik Sipil,FTSL-ITB Sebagian besar materi diambil dari materi kursus singkat.
Wave Equation Applications 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Energy Considerations If we take PDA measurements….
Hypothesis Testing Steps in Hypothesis Testing:
Chapter 9A Process Capability and Statistical Quality Control
1 43 rd ANNUAL FHWA MIDWEST GEOTECHNICAL CONFERENCE Bloomington, MINNESOTA, OCTOBER 1-3, 2014 State of Practices in Databases for Deep Foundations Load.
 New reforms have been passed to modernize the Swiss electricity sector.  Legal (transmission and generation are separate legal entities) and functional.
Chap 8-1 Statistics for Business and Economics, 6e © 2007 Pearson Education, Inc. Chapter 8 Estimation: Single Population Statistics for Business and Economics.
Large Diameter Open-End Pipe Piles for Transportation Structures Dan Brown, PhD., P.E., D.GE.
AASHTO LRFD Section and 10
STUDENT EXERCISE #2 Use the α-Method described in Section a and the Nordlund Method described in Section c to calculate the ultimate pile.
Uncertainty and Climate Change Dealing with uncertainty in climate change impacts Daniel J. Vimont Atmospheric and Oceanic Sciences Department Center for.
Topic 7 Sampling And Sampling Distributions. The term Population represents everything we want to study, bearing in mind that the population is ever changing.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 7-1 Chapter 7 Confidence Interval Estimation Statistics for Managers.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 10 th Edition.
PERFORMANCE MODELS Lecture 16. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability.
Multivariate Data Analysis Chapter 4 – Multiple Regression.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 7-1 Introduction to Statistics: Chapter 8 Estimation.
SHALLOW FOUNDATIONS Spread footings Mat (Raft) foundations Square
Chapter 8 Estimation: Single Population
Chapter 7 Estimation: Single Population
8-1 Copyright ©2011 Pearson Education, Inc. publishing as Prentice Hall Chapter 8 Confidence Interval Estimation Statistics for Managers using Microsoft.
Copyright ©2011 Pearson Education 8-1 Chapter 8 Confidence Interval Estimation Statistics for Managers using Microsoft Excel 6 th Global Edition.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Business Statistics, A First Course.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 7-1 Chapter 7 Confidence Interval Estimation Statistics for Managers.
Transition Matrix Theory and Loss Development John B. Mahon CARe Meeting June 6, 2005 Instrat.
Estimation of the Uncertainty of the Robertson and Wride Model for Reliability Analysis of Soil Liquefaction C. Hsein Juang and Susan H. Yang Clemson University.
IWM 2004 Tokyo, Japan Micropiles State of the Art Report Research and Practice Issues USA John R. Wolosick, P.E. Hayward Baker Inc. Atlanta, Georgia.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 7-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
Chapter 7 Estimation: Single Population
Confidence Interval Estimation
(a.k.a: The statistical bare minimum I should take along from STAT 101)
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 11 th Edition.
Confidence Interval Estimation
Chap 8-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Chapter 8 Confidence Interval Estimation Business Statistics: A First Course.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Basic Business Statistics 11 th Edition.
PROBABILITY (6MTCOAE205) Chapter 6 Estimation. Confidence Intervals Contents of this chapter: Confidence Intervals for the Population Mean, μ when Population.
AP Statistics Chap 10-1 Confidence Intervals. AP Statistics Chap 10-2 Confidence Intervals Population Mean σ Unknown (Lock 6.5) Confidence Intervals Population.
Service Transition & Planning Service Validation & Testing
Additional Design Considerations 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Material Variability… … or “how do we know what we have?”
Driven Pile Design George Goble. Basic LRFD Requirement η k Σ γ ij Q ij ≤ φ g R ng η k – factor for effect of redundancy, ductility and importance γ ij.
Chap 7-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition Chapter 7 Estimating Population Values.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 8-1 Confidence Interval Estimation.
OMAE 2009 Honolulu, HI - May 31 to June
AFT STATNAMIC Load Testing of High Capacity Marine Foundations
Chap 7-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition Chapter 7 Estimating Population Values.
Financial Statistics Unit 2: Modeling a Business Chapter 2.2: Linear Regression.
1 f02laitenberger7 An Internally Replicated Quasi- Experimental Comparison of Checklist and Perspective-Based Reading of Code Documents Laitenberger, etal.
Chap 8-1 Chapter 8 Confidence Interval Estimation Statistics for Managers Using Microsoft Excel 7 th Edition, Global Edition Copyright ©2014 Pearson Education.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Pearson Prentice-Hall, Inc.Chap 8-1 Statistics for Managers Using Microsoft® Excel 5th Edition.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 7-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
Wave Equation Applications 2009 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
L Berkley Davis Copyright 2009 MER301: Engineering Reliability Lecture 12 1 MER301: Engineering Reliability LECTURE 12: Chapter 6: Linear Regression Analysis.
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 8-1 Chapter 8 Confidence Interval Estimation Business Statistics: A First Course 5 th Edition.
Midwest Geotechnical Conference Implementation of the AASHTO LRFD Geotechnical Strength Limit State for Bearing Resistance of a Single Driven Pile.
Statistics for Business and Economics 8 th Edition Chapter 7 Estimation: Single Population Copyright © 2013 Pearson Education, Inc. Publishing as Prentice.
Pile Foundation Reason for Piles Types of Piles
Uncertainty estimation from first principles: The future of SSES? Gary Corlett (University of Leicester) Chris Merchant (University of Edinburgh)
Chapter 8 Confidence Interval Estimation Statistics For Managers 5 th Edition.
Statistics for Business and Economics 7 th Edition Chapter 7 Estimation: Single Population Copyright © 2010 Pearson Education, Inc. Publishing as Prentice.
Applied Statistics and Probability for Engineers
Computer aided teaching of statistics: advantages and disadvantages
Chapter 7 Confidence Interval Estimation
Confidence Interval Estimation
47th STGEC – Biloxi, MS – Nov. 10, 2016
Confidence Interval Estimation
Presentation transcript:

Comparison of Five Different Methods for Determining Pile Bearing Capacity by Jim Long, Univ. of Illinois Wisconsin DOT February 6, 2009 Madison, WI

Agenda Discuss Objectives/Tasks of Project General Approach Specifics –Prediction Methods Investigated –Databases used for Assessment –Interpretation of Data Assessment of Predictive methods Improved Method Implementation into LRFD

Objective To quantify the ability of the five methods (Wisc- EN, FHWA-Gates, PDA, corrected Gates, WS- DOT) for predicting pile bearing capacity in a way that allows Wisconsin DOT to assess when or if it is appropriate to use each of the methods and to confidently estimate the reliability/safety and economy associated with each method.

Tasks Task 1 - Literature Review Task 2 - Data Collection –Collect pile information from the Marquette Interchange –Collect pile information from other past projects of WisDOT –Collect pile information from the PI’s on Collection of pile load tests –Catalog the character of the load test information Task 3 – Analysis –Quantify the ability of EN, Gates, and PDA to agree with capacity from static load tests –Quantify the ability of EN, Gates, to agree with capacity from PDA, and quantify agreement between EN and Gates –Identify limitations to the Gates method –Develop an improved modified Gates –Assess Washington State DOT method developed by Allen –Identify efficiency and impact of using promising methods compared to EN formula Task 4 - Report Submission

Studies Collected for DB#1 Flaate (1964) Olson and Flaate (1967) Fragaszy (1988, 1989) Paikowsky (1994) Davidson (1996) FHWA/Long (2001) NCHRP 507 and Allen(2005/2007)

Database 1 (all cases SLTs)

Results for 5 predictive methods based on DB#1 EN-Wisc FHWA-Gates FHWA-Gates (corr) PDA Washington DOT (Allen)

Wisconsin - EN formula c = 0.2 for Wisconsin Most states use built-in division by 6 to get allowable bearing by specifying H in ft, and s in inches. Study shows that the estimate ends up to be about a FS = 3.1 wrt ultimate capacity.

Methods – Gates formula Gates modified by FHWA Gates modified in this Study

Effect of Corrected Gates

PDA Based on measurement of strain and velocity in the pile during driving Case method is applied – details in Report There are different interpretation methods available and different damping values that can be applied – makes the method more adaptable to local conditions, but also makes the method non-standard. Advantages – can determine energy going into pile Disadvantage – does not account for setup – determines capacity at the time of driving

Methods – Wash DOT (Allen) where F eff = Hammer efficiency factor 0.55 for Air/Steam – all piles 0.47 for OED with steel piles 0.35 for CED with all piles 0.37 for OED with concrete or timber piles N b = Number of blows/in E = hammer energy in ft-kips Q ult = Ultimate pile capacity (kips)

Statistical Results Q P /Q M Mean COV Method Wisc-EN WSDOT FHWA-Gates PDA FHWA-Gates for all piles <750 kips corrected FHWA-Gates <750 kips

Observations In terms of scatter –corrected Gates (least scatter, limited to <750k) –WSDOT –FHWA-Gates (<750k), PDA –EN (greatest scatter) Trend for Gates is to underpredict at higher capacity and overpredict at lower capacity – address issue by restricting capacity < 750k

Database 2 – DB2 Two sets of Data Collected –Wisc(JHL) 220 piles in which there are estimates of capacity from dynamic pile behavior –Wisc (MI) Marquette Interchange – collection of 96 piles. Estimates can be made with all dynamic methods. PDA and CAPWAP results for BOR. –few static load tests

DB2

PDA EOD results with PDA determine the capacity of pile at the time of driving BOR results determine capacity at beginning of restrike BOR better accommodates effects of setup CAPWAP for BOR provides even better estimate of pile capacity

DB2 - Emphasis will be on data in which there are estimates of capacity based on CAPWAP (BOR)

Summary Tables

LRFD – Resistance Factors two approaches (FOSM, FORM) Determines the resistance factor necessary for a target reliability (index) unknowns accounted for in both loads and resistance variables –pred method (bias and cov) –loads (bias and cov) –target reliability (beta = 2.0, 2.5, 3.0) based on NCHRP 507

Resistance Factors - FOSM R = bias factor (which is the mean value of QM/QP ) for resistance COV QD = coefficient of variation for the dead load COV QL = coefficient of variation for the live load COV R = coefficient of variation for the resistance  T = target reliability index  D = load factor for dead loads  L = load factor for live loads Q D /Q L = ratio of dead load to live load QD, QL = bias factors for dead load and live load

LRFD – Resistance Factors

LRFD – Efficiency

Since Report Submission We submitted report in June, 2008 We have been continuing to work with IDOT reanalyzing and reviewing more data and methods If we look at the same data as we have for WSDOT, and “Fit the tail of the distribution”, we can justify higher resistance factors

Effect of Fit to Tail For  = 2.33 FORM Original Fit to Value Tail FHWA-Gates Corrected Gates WSDOT