Risk Based Estimating Self Modeling Ovidiu Cretu, Ph.D., P.E. Terry Berends, P.E. David Smelser.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Quantitative Cost & Schedule Risk Assessment
Advanced Project Schedule Risk Analysis
Advance Project Management - CPH
PROJECT RISK MANAGEMENT
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Risk Planning Manajemen Proyek dan Strategi Kepemimpinan Jurusan Teknik Elektro Universitas Udayana September 2011.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Uncertainty Management.
Project Management Risk Management. Outline 1.Introduction 2.Definition of Risk 3.Tolerance of Risk 4.Definition of Risk Management 5.Certainty, Risk,
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
5 - 1 © 1997 Prentice-Hall, Inc. Importance of Normal Distribution n Describes many random processes or continuous phenomena n Can be used to approximate.
Probability Distributions and Stochastic Budgeting AEC 851 – Agribusiness Operations Management Spring, 2006.
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
Project Risk Management
Software project management (intro)
Project Risk Management
Session 33 Guest Speaker: Gini Van Siclen. Risk Management for Project Managers Gini Van Siclen.
© 2011 HDR All rights Reserved. Value Engineering Ken L. Smith, PE, CVS (360) April 27 th, 2011.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Risk Evaluation Committee CONTINGENCY, RISK & OTHER ALLOWANCES Presentation By: Adam Malkhassian October 2003.
© 2002 Hulett & Associates, LLC Will YOUR Project Overrun? Do a Cost Risk Analysis Presented by David T. Hulett, Ph.D. Hulett & Associates, LLC Los Angeles,
Monte Carlo Schedule Analysis The Concept, Benefits and Limitations Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403)
Project Risk Management
Client Logo LEAN ENTERPRISE Implementation Workshop.
PRM 702 Project Risk Management Lecture #28
Module 03 : Knowing What the Project Is, Part 2. 2.
PMI Knowledge Areas Risk Management.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Methods and Tools of Success Driven Project Management
HIT241 - RISK MANAGEMENT Introduction
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
S.Cholette, based on McGraw-Hill/Irwin Managing Risk.
SIMULATION USING CRYSTAL BALL. WHAT CRYSTAL BALL DOES? Crystal ball extends the forecasting capabilities of spreadsheet model and provide the information.
MARCH 1 Risk Management Why carry out Risk Assessment? l Is the project too risky? l Threat intensity? l Improve decision making l Clarification of terms.
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
Chapter 10 Risk and opportunities management
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Decision making Under Risk & Uncertainty. PAWAN MADUSHANKA MADUSHAN WIJEMANNA.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
VMcG 2/11/02 Critical Chain as an Extension to CPM Vincent McGevna, PMP February 11, 2002
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
SOFTWARE PROJECT MANAGEMENT
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Simulation is the process of studying the behavior of a real system by using a model that replicates the system under different scenarios. A simulation.
Life-cycle cost analysis (LCCA)
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
Project Risk Management Planning Division of Project Management November 2003.
Budget Estimates & Bid Estimates: Is there a difference? TCCE Annual Meeting September 3, 2014.
Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
First Solar Plane Flight 19/04/2013.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Chapter 11: Project Risk Management
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Project Management for Software Engineers (Summer 2017)
Monte Carlo Schedule Analysis
CPM, PERT & Schedule Risk Analysis in Construction
PMI North Area PMP Exam Study Group
Software Project Management (SPM)
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Project Risk Analysis and Management: L3
Chapter#8:Project Risk Management Planning
Project Risk Management
Chapter#8:Project Risk Management Planning
Presentation transcript:

Risk Based Estimating Self Modeling Ovidiu Cretu, Ph.D., P.E. Terry Berends, P.E. David Smelser

Threat 1 All known and unknown risks are equally weighted All known and unknown risks are equally weighted Allows little control over the project cost/schedule Allows little control over the project cost/schedule Reactive Reactive Clear recognition of project’s threats and opportunities Clear recognition of project’s threats and opportunities Allows a reasonable control over the project cost/schedule Allows a reasonable control over the project cost/schedule Proactive Proactive Traditional EstimatingRisk Based Estimate Base Estimate Contingency Opportunity Threat 2 New Threats

Engineer’s Estimate Identify Quantify Risks Likelihood of Occurrence [%] Impact [$,Mo] Validate Base Cost Duration Cost [$] Duration [Mo] Variability +2% to +10% Risk Based Estimate Monte Carlo Method

Base Cost and Schedule Validation Review the project assumptions Review the project assumptions Review the project cost and schedule based on the information available Review the project cost and schedule based on the information available Update unit price Update unit price Update quantities Update quantities Capture the cost of unknown cost of miscellaneous items Capture the cost of unknown cost of miscellaneous items Remove some contingencies Remove some contingencies

Variability of the Base Cost and Schedule The entire construction cost/duration The entire construction cost/duration A major group of pay items A major group of pay items An individual pay item An individual pay item Symmetrical distribution Symmetrical distribution Beta3 Distribution Beta3 Distribution

Engineer’s Estimate Validate Base Cost Duration Identify Quantify Risks Likelihood of Occurrence [%] Impact [$,Mo] Cost [$] Duration [Mo] Variability +2% to +10% Risk Based Estimate Monte Carlo Method

Risks Identification and Quantification Focus is on Focus is on Identify the key ‘risky’ events Identify the key ‘risky’ events Estimate how likely it is that the risky event will materialize Estimate how likely it is that the risky event will materialize Estimate why and by how much events may turn out differently from the base estimate Estimate why and by how much events may turn out differently from the base estimate

Probability of Risk Occurrence Lowest value = 0 Lowest value = 0 Highest value = 1 Highest value = 1 Middle value = 0.5 Middle value = 0.5

Probability of Risk Occurrence Very Low: = 5% Very Low: = 5% Low: = 25% Low: = 25% Medium (As Likely As Not) = 50% Medium (As Likely As Not) = 50% High = 75% High = 75% Very High: = 95% Very High: = 95% It is important to be “approximately right.” Do not waste time being “precisely wrong.”

Define Range and Shape Three Point Estimate: about as much information an expert can provide. 1. “MIN” the first point 2. “MAX” the second point 3. “The Best-guess” Range Shape

Shape “The Best-guess”: This will be the expert’s “median guess” “The Best-guess”: This will be the expert’s “median guess” Median: Actual outcomes evenly distributed over the median guess Median: Actual outcomes evenly distributed over the median guess “The Best-guess” can’t be too close to the max or the min. “The Best-guess” can’t be too close to the max or the min.

Entire range (100 to 700) includes 100% of the possibilities MIN = 100 MAX = 700 ELICIT VALUES : Best Guess = 400 Most Likely=400

Entire range (100 to 700) includes 100% of the possibilities MIN = 100 MAX = 700 ELICIT VALUES: Best Guess = 200 Most Likely 130 Expert: Costs are more likely to be at the lower end of the range

Entire range (100 to 700) includes 100% of the possibilities MIN = 100 MAX = 700 ELICIT VALUES: Best Guess = 600 Most Likely=670 Expert: Costs are more likely to be at the higher end of the range

Engineer’s Estimate Validate Base Cost Duration Identify Quantify Risks Likelihood of Occurrence [%] Impact [$,Mo] Cost [$] Duration [Mo] Variability +2% to +10% Risk Based Estimate Monte Carlo Method

Risk Based Estimate Cost CY [$] YOE [$] Schedule End CN Ad Date RESULTS

INPUTOUTPUT Base Cost Duration Variability Estimating Date Escalation Factor Risks Cost, Duration Status Project Phase Probability Range and Shape Critical Path Info Markups Cost CY YOE Diagram Table Schedule AD Date End CN Diagram Table Sensitivity Analysis The Model 10,000 Plausible Cases MCM RBE

MCS -- DEMO

Conclusions: Better understanding of the project’s challenges Better understanding of the project’s challenges Crafts the project risk management plan with clear target on how to enhance the project value Crafts the project risk management plan with clear target on how to enhance the project value Helps in maximizing the project’s opportunities and reducing or eliminating the project’s threats Helps in maximizing the project’s opportunities and reducing or eliminating the project’s threats

The RBE Self-modeling Two Major Functions Two Major Functions Estimating Function Estimating Function Risk Management Function Risk Management Function

Conclusions: Self-modeling The model allows registration of meaningful information and it produces valuable results that may be used by decision makers. The model allows registration of meaningful information and it produces valuable results that may be used by decision makers. The model does not require any special software or specialized skills. The model does not require any special software or specialized skills. WSDOT - Self-modeling Spread Sheet WSDOT - Self-modeling Spread Sheet WSDOT - Self-modeling Spread Sheet WSDOT - Self-modeling Spread Sheet

Any Questions??