Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Project
ERCOT Planning Overview and Summer 2014 Assessments Update
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014.
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
LAREDO RMR EXIT STRATEGY Presentation to Technical Advisory Committee March 4, 2004 Transmission Services Operations.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Overview
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Sep 16, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Houston Import Study Update
Modeled Load Levels in the Valley
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Electric Utility Master Plan Update
Presentation transcript:

Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report

2 Nov. 11, 2011RPG Meeting LRGV/Brownsville Area Transmission system Rio Hondo-Loma Alta 345 kV for Options 3, 4 & 5 LaPalma 138 kV rebuild’s Option 3 LaPalma 69 kV to 138 kV Option 4 LaPalma- Palo Alto 138 kV Option 5

3 Nov. 11, 2011RPG Meeting Project Options Option 1 – (Sharyland and BPUB proposal) New 345kV Loma Alta station with two (2) 345/138kV 450 MVA auto ~14 mile 345kV transmission line from existing 345kV La Palma station to new 345kV Loma Alta station ~59 mile 345kV transmission line from new 345kV Loma Alta station to new 345kV Frontera station across the valley Total project cost estimate ~ $126.0 million* Option 3 New 345kV Loma Alta station with one 345/138kV auto ($24.1 M) ~27.4 mile 345kV transmission line from existing 345kV RioHondo station to new 345kV Loma Alta station ($ 71.4 M) Rebuild LaPalma-Cavazos-Military Highway with ACSR ($47.2 M) Rebuild LaPalma-Los Fresnos-LomaAlta with ACSR ($40.1 M) Total project cost estimate ~ $182.8 million * Cost estimates are subjected to be revised

4 Nov. 11, 2011RPG Meeting Project Options (Cont.) Option 4 New 345kV Loma Alta station with one 345/138kV auto ($24.1 M) ~27.4 mile 345kV transmission line from existing 345kV RioHondo station to new 345kV Loma Alta station ($71.4 M) Rebuild and convert LaPalma to Brownsville 69 kV line to a 138 kV line; Remove 69 kV terminal at Brownsville, and add 138 kV ring bus and add new 138/69 kV auto at Brownsville (for 69 kV line from Brownsville City to LaPalma) ($54.3 M) Total project cost estimate ~ $149.8 million Option 5 New 345kV Loma Alta station with one 345/138kV auto ($24.1 M) ~27.4 mile 345kV transmission line from existing 345kV RioHondo station to new 345kV Loma Alta station ($ 71.4 M) ~12 mile new 138kV transmission line from LaPalma – Palo Alto with ACSR ($11.3 M*) Total project cost estimate ~ $106.8 million* * Cost estimates are subjected to be revised

5 Nov. 11, 2011RPG Meeting 345 kV Project Option for N-1-1 New 345 kV Line from North Edinburg to South McAllen ($ 93.4 M) New 345 kV transmission line from South McAllen to Loma Alta ($147.7 M)) New 345kV Loma Alta station with one 345/138kV auto ($24.1 M) Build South McAllen station or Frontera 345 kV station with one 345/138 kV auto and kV line terminal ($24.1 M) - needed by 2020 Total project cost estimate ~ $289.3 million

6 Nov. 11, 2011RPG Meeting 2016 Power Flow Results N-1-1 (without the new 250 MW load) Prior Outage of either the Ajo-Rio Hondo 345 kV or Rio Hondo-N. Edinburg 345 KV: The loss of the next 345 Rio Hondo would cause severe overloads on several 138 kV and 69 kV lines (cross valley lines serving Brownsville area). Some of the major post-contingency (> 120%) N-1-1 overloads: Weslaco Unit to Steward Road 138 kV line (158.4 %) Weslaco Switching Station to Weslaco 138 kV line (149.7%) Aderhold to HEC Energy Center 138 kV line (142.7%) Heidelberg to Weslaco 138 kV line (134.0%) Elsa to Aderhold 138 kV line (133.6%) Burns to Heidelberg 138 kV line (126.3%) South McAllen to Las Milpas 138 kV line (124.5%) Wesmer to Weslaco Unit 138 kV line (120.7%) 2016 system peak system condition would require ~ 387 MW of load shed in the East Valley to relieve all N-1-1 overloads.

7 Nov. 11, 2011RPG Meeting 2016 East Valley Load duration curve (without the 250 MW)

8 Nov. 11, 2011RPG Meeting Brownsville Area Load

9 Nov. 11, 2011RPG Meeting 2020 Power Flow Results N-1 & G-1 with 250 MW load With Option 5 (without the Cross-Valley 345 kV line) New 345kV Loma Alta station with one 345/138kV auto ~27.4 mile 345kV transmission line from existing 345kV RioHondo station to new 345kV Loma Alta station ~12 mile new 138kV transmission line from LaPalma – Palo Alto with ACSR Some of the post-contingency overloads following for N-1 & G-1: South McAllen to Las Milpas 138 kV line (114.5%) HEC to Azteca 138 kV line (111.7 %) HEC to Aderhold 138 kV (108%) Azteca to South Edinburg 138 kV line (107.8 %)

10 Nov. 11, 2011RPG Meeting Study status/update We are comparing the project costs and reliability impact of the following four sensitivities to make a final project recommendation: N-1+ G-1 without the new 250 MW load N-1+ G-1 with the new load 250 MW load N-1-1 & N-1+G-1 without the new 250 MW load N-1-1 & N-1+G-1 with the new 250 MW load Working on the study report The tentative date for the study report is revised to November 22, 2011

11 September 17, 2010RPG Meeting March 12, 2010 Questions?