By Dean Mckinstry National Diploma Project Electro Plating Fixture.

Slides:



Advertisements
Similar presentations
Fabricating Techniques and Practices
Advertisements

Erection of steel portal frame for warehouse Construction
CHAPTER 14 PRODUCTS AND PROCESSES.
Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
Grinding.
Achieving World Class Vehicles with Agile Fabrication Systems for Achieving World Class Vehicles Table Top Hemmer August 22, 2001 by.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
GCSE Resistant Materials Techniques and Processes
STONECAST. Stonecast is material made from mineral fillers, quartz gravel, sand, stone flour and a small percent epoxy-binder. All those ingredients get.
Screw Lift Prepared by : Areen abu kishek Amjad Haj Yousef Julia Thaher Heba Asmar Mohammed Qasrawi Presented To : Eng. Jad Mouqadi.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Lathe Practice & Milling
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
Jigs and Fixtures.
Jigs and Fixtures Increased Consistency and Efficiency.
Harry McMullan. Design brief In my project I am manufacturing a tipping swarf bin/ dumper for workshop in Bangor There are many others on the market although.
Specification section 3.1
Chapter 4 Process Design.
MANUFACTURING VOCATS 7.O5. MANUFACTURING is A system or group of systems used in the manufacturing process to make products for an end user.
William Enns Bray, Mitch Sharpe, Mike Kryski, Andrew Mattson, Nicole Marshall, Ashton Johnson Sponsor: Dr. Bertram Design Review 1.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
JMG JMG PICK & CARRY CRANES Pick & carry mobile cranes battery operated. The simple and safety solution for floor work and load up to 100 Ton.
William Enns-Bray, Mitchell Sharpe, Michael Kryski, Andrew Mattson, Nicole Marshall, Ashton Johnson Sponsor: Dr. Bertram Design Review 1.
Hello, my name is MM3. I am a new product of Alpha P.Z.
MANUFACTURING A system or group of systems used in the manufacturing process to make products for an end user ( STL pg. 239)
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
Competency 7.00 Competency 7.00 Develop an Awareness of the Designed World CommunicationTransportationManufacturingStructural Energy and Power Biotechnology.
Presentation by ANAS AHMAD ME1 B1 batch Submited to
The Unique Scaffold Trailer Pack From Molecular Scaffold Sales.
Building LEGO Robots For FIRST LEGO League By Dean Hystad
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
Let’s Get Better New Ways to Industrialize The Rest of Chapter 13, Sections 2-3 Notes.
Jigs A Definition When manufacturing a product, a jig is a custom-made tool used to control the location and/or motion of another tool. Why do we use jigs?
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Chicago-Area Industrial Spaces Looking for off-site assembly spaces.
Innovative Toolings & Automation Solution P-1 Contact No Mail id: Company address: 23, 24, Shivam Industrial estate, Near Hotel.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
Rosava Group Gantry Crane.
DESIGN AND MANUFACTURING OF PNEUMATIC CAN CRUSHER D
Inspection of stock materials for defects
AURA LASERFAB PVT. LTD. An ISO 9001:2008 Certified Company
SeaPerch Structural System
SeaPerch Structural System
CreaZen® Decorative Railing System
Your Coast –to-Coast Converter Connection
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
A Sectional View shows what is going on inside an object
There are 2 classification of wood joints:
My engineering project tipping swarf bin
Gantry Crane Manufacturer
Dan Peterson: News on Advanced Endplate Mechanics
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
ProLine & ProLine+.
Automated Oiling System
Increased Consistency and Efficiency
SeaPerch Structural System
Engineering Friday, 07 December 2018.
SeaPerch Structural System
Agenda (i) Analyze economic viability and judge necessity of jig – fixture for specific production by machining (ii) Plan for designing a fixture or jig.
Rail fixtures & fastening
Manufacturing Operations
Floor outlet boxes British Standard
Progress on the Bike! Daniel O Connor.
Bunker Wall Design Wall ESS
Sterling Industries.
Chicago Clamp Company Manufacturing Structurally Sound and
Presentation transcript:

By Dean Mckinstry National Diploma Project Electro Plating Fixture

Design Brief I am going to produce a fixture for electro plating increasing productivity at T.J plating's production for one product line

Process Electroplating is the process of plating one metal onto another, most commonly for decorative purposes or to prevent corrosion of a metal.

Major Design Parameters Increase productivity Fisher engineering parts Mass is 1.1kg 25mm clearance between parts Set up by one person Offers flexibility

Major Customer Requirements The costumers main demand is the quantity per dip, which means he is wanting a fixture that will support more work and he also wants a quicker set up time. The main purpose of his demand is to boost production.

Product Design Specification When I was at the factory I was able to get lots of information such as: The type of acid that is used for plating is hydrochloric acid The bath is 400mm wide and the rail used to hold the jig is 2400mm long. The product I will be working with is 45mm box section and 1080mm long and the spacing between hooks will have to be 80mm apart for a high quality plating job. The motor used for the crane is 5hp. The maximum load the crane can withstand is 1000kg

Testing I have come up with a testing frame which will allow me to test different fixtures out to see which design could work the best

Concepts The limitation is, this will be difficult to set up because its hanging, fixture would need to be balanced on the frame This design is balanced but it doesn’t have any fixed positions, it possibly hasn’t got enough circulation This is the best solution but I wanted to try and improve it to be easier to manufacture.

Concept selection Simple to make Welded frame Fits to existing hanger Uses no tools to secure High stress and high loading may mean its difficult to lift

Design development Modular i.e. 3 sections Make 1 section 750mm long sections Capacity of 54/3 Loading gantry is 54 x 1.1kg i.e. 59.4Kg, fully loaded Spacing of 80mm meaning 50mm circulation

Detailed Design Demand is 1500 parts plated per week Cost £2,50 per part per job Demand is 250 per working day 18 per batch, 3hour cycle time 16 hours per working day Old capacity – 14 x 18 units = 252 per day 1512 per week New capacity 14 x 54 units = 756 per day 5 day week = day week = 4536 Or no night shift i.e. 8am to 4pm 54 x 6 x 6 = 1944 parts plated on a 6 day week I.e. night shift wages reduced by 8 x 6 x £15=£720 per week

Productivity Output increased by 150% Saving over £35000 per year on labour 18 units at £2.00 = £36 46 units at £2.00 = £92 Profit increased by £56 per batch

At R1 F x D= M CM= ACM 2.4 R2= 103 x 0.075m x x x = R1= Nm R1= 309N

How my fixture was made: Measured out 4 pieces of 30x30mm angle iron, two were 750mm and the others were 300mm Cut a 45 degree angle at each corner Welded each corner together with a MIG welder Measured and cut holes with 80mm spacing Welded a mounting bracket to each end of the fixture