Shipbreaking Module 4: Heavy Equipment & Material Movement 4.1 Hoisting, Emergency, Inspect Susan Harwood Grant Number SH-17820-08-60-F-23.

Slides:



Advertisements
Similar presentations
Working Around/Under Loads
Advertisements

Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
Material Handling This material was produced under grant [SH22236SH1]from the Occupational Safety and Health Administration, U.S. Department of Labor.
My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH F-23.
Developed by Western Iowa Tech Community College This material was produced under a grant (SH F-19) from the Occupational Safety and Health.
Developed by Western Iowa Tech Community College This material was produced under a grant (SH20836SHO) from the Occupational Safety and Health Administration,
Struck-By/Caught-Between
Loading and Transporting Logs Section K of the logging code.
Safe and Secure Safety Training Series identifying JOB HAZARDS.
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.1 Pre-planning and Hazard Assessment Susan Harwood Grant Number SH F-23.
Module 2: General Working Conditions 2.2 Working Surfaces Susan Harwood Grant Number SH F-23.
Sawmill Safety Module 1 – Log Handling Log Arrival to Log Decking.
SAWMILL SAFETY Module 5 Shipping and Handling “ Assume they can’t see you ”
Shipbreaking Module 4: Heavy Equipment & Material Movement
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
OSHA Office of Training & Education
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
OSHAX.org - The Unofficial Guide To the OSHA
4. Move the load 3. Plan the move 2. Check the hoist 1. Prepare for hazards QUITQUIT EASY GUIDES AUSTRALIA PTY LTD Quiz 5. Shut down.
Module 6: Workplace & Chemical Hazards 6.3 Mercury Susan Harwood Grant Number SH F-23 Shipbreaking.
Crane Operations Objective
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.2 Types of Vessels Susan Harwood Grant Number SH F-23.
Module 6: Workplace & Chemical Hazards 6.5 Cadmium Susan Harwood Grant Number SH F-23 Shipbreaking.
INTRODUCE SELF AND EXPLAIN GOING TO COVER BASIC
Crane and Hoist Training
Module 3: PPE 3.4 Cleaning, Maintenance, and Replacement of PPE Susan Harwood Grant Number SH F-23.
AIMU AND MICA Education Seminar October 1, 2004 “THE WORLD OF DREDGES AND DREDGING” LOSSES AND LOSS PREVENTION Prepared by: Armand Cuevas SGS Marine Services.
1 Module 1 Requirements for Flaggers This training is provided under Susan B. Harwood No. SH F-8. It does not necessarily reflect the views.
Logistics Safety Awareness This material was produced under grant number #SH F12 from OSHA. It does not necessarily reflect the views or policies.
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.3 Emergency Action Plans Susan Harwood Grant Number SH F-23.
Material Handling Safety This material was produced under the grant SH SH1 from the Occupational Safety and Health Administration, U.S. Department.
Module 2: General Working Conditions 2.3 Ladders / Stairways Susan Harwood Grant Number SH F-23.
This material was produced under grant numbers SH F-17 from the Occupational Safety and Health administration, U.S. Dept. of Labor. It does not.
Module 2: General Working Conditions 2.5 Confined Space Entry Susan Harwood Grant Number SH F-23.
Module 6: Workplace & Chemical Hazards 6.2 Lead Susan Harwood Grant Number SH F-23 Shipbreaking.
Safety Training Presentations
Safety Training Presentations
Material Handling. Introduction Handling and storing materials include a wide variety of tasks like: Hoisting tons of steel with a crane Driving a truck.
Module 3: PPE 3.3 Training Susan Harwood Grant Number SH F-23.
Susan Harwood Program Grant – The University of Texas at Arlington Thanks to the Susan Harwood Program Grant.
Module 3: PPE 3.2 PPE Selection Susan Harwood Grant Number SH F-23.
Module 6: Workplace & Chemical Hazards 6.4 PCB Susan Harwood Grant Number SH F-23 Shipbreaking.
CRANE TIP OVER Date: May 12 th, INCIDENT A galloway was being pre-assembled to determine proper fit. It was then to be disassembled and sent underground.
Module 3: PPE 3.1 Hazard Assessment Susan Harwood Grant Number SH F-23.
1 Falls Module 3. 2 DISCLAIMER This material was produced under grant number SH from the Occupational Safety and Health Administration, U.S. Department.
This material was produced under grant number SH F-51 from the Occupational Safety and Health Administration, U.S. Department of Labor. It.
Module 5: Fire Protection 5.1 Fire Response Susan Harwood Grant Number SH F-23.
1 Welding Module DISCLAIMER This material was produced under grant number SH from the Occupational Safety and Health Administration, U.S.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Walking and Working Surfaces
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
Big Four Construction Hazards: Struck-by Hazards This material was produced under grant number 46F5-HT03 and modify under grants numbers SH F-72.
Productivity. PLANNING  The key concept behind Internal Traffic Control is PLANNING for worker safety.  ITCPs integrate other aspects of planning to.
Module 5: Fire Protection
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.4 Gangways and Signs Susan Harwood Grant Number SH F-23.
Module 5: Operations & Hot Work 5.3 Hot Work, Permits, and Inspections Susan Harwood Grant Number SH F-23.
RIGGING COMMUNICATION Industry Fundamentals and Occupational Safety Unit 6.
OSHA NOTICE & DISCLAIMER “This material was produced under grant SH20866SH0 from the Occupational Safety and Health Administration, U.S. Department of.
1 Electricity. This material was produced under grant number SH F-54 from the Occupational Safety and Health Administration, U.S. Department.
Accidents Case Studies
Topic 1.7 Aircraft Salvage Procedures
Working Around/Under Loads
Lifting & Rigging Continuing Education Fourth Quarter 2016
SAFE WORK INSTRUCTIONS
Limit Switches What are some different types of limit switches?
Shipyard Machinery and Power Tool Safety
Click anywhere to get started…
Cranes and Hoists Standard 29 CFR Part
Click to start.. Click to start. Rigging for a safe lift SAFETY TALKS! for PowerPoint © MMIV Bongarde Holdings Inc.
Presentation transcript:

Shipbreaking Module 4: Heavy Equipment & Material Movement 4.1 Hoisting, Emergency, Inspect Susan Harwood Grant Number SH F-23

Disclaimer 2  This material was produced under grant number SH F-23 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily reflect the views or polices of the U.S. Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government.

Objectives 3  Describe hoist and gear operations  Identify the inspection protocols  List the types of equipment used  Explain hoisting series  List emergency type situations

4

5 Hoist and Gear Operations

Cranes and heavy material moving equipment are extremely important to the operations of ship breaking. 6 Figure 1 Crane hoisting line and vessels rigging

Without it shipbreaking would be extremely labor intensive and unsafe. 7 Figure 2 Hoisting sectional to shore via crane

But with the usage of the equipment comes safety concerns that can result in injury and death. 8 Figure 3 Exploration rig on barge awaiting to be dismantled

There are many components that go into hoisting operations which increases the chances for systems to fail. 9 Figure 4 Crane along side of slip hoisting

Before the hoist takes place check to ensure proper rigging and that the rigging is laid out safely. 10 Figure 5 Rigging properly laid out and trimmed evenly

The loads should never be moved over personnel. 11 Figure 6 20 ton Steel coils being off loaded

The supervisor, on the vessel, is initially in charge of the hoist and gives the crane operator the only crane signals. 12 Figure 7 Supervisor monitoring final cut before hoisting section

As the load is being put under tension keep clear of the rigging and material. 13 Figure 8 Load clearing side of vessel

Common mistakes are inadequate rigging and placement. 14 Figure 9 Workers securing rigging with gear

The connection of gear to the equipment is just as important as the load connection. 15 Figure 10 Crane conducting hoist off superstructure

The crane operator does not generally have a clear view of operations that are ongoing on the deck of the vessel. 16 Figure 11 Supervisor monitoring hoisting

Before the hoist, all personnel must be clear of the area and other equipment moved to a safe location. 17 Figure 12 Worker removing the rigging after hoist

Personnel can be caught between the hoist and that is why the supervisor must be accountable for all personnel. 18 Figure 13 Crane signalman giving directions to crane operator

During the hoist the on deck supervisor will monitor the hoist and give directions to the crane operator. 19 Figure 14 Crane operator at the controls awaiting for directions

The only time personnel are allowed to approach the hoist is at the direction of the on deck supervisor. 20 Figure 15 Crane moving into position for hoist

Shock loading the hoist is prohibited and dangerous to the load, equipment, and personnel in the area. 21 Figure 16 Crane hoisting section slowly

The transfer point when the hoist is clear of the vessel is when the crane operator takes charge of the hoist. 22 Figure 17 Crane moving section to bank

Workers are not allowed to ride the hoist at any time during the operations. 23 Figure 18 Section being hoisted to yard

24 Inspections

The hoisting gear must be inspected regularly and prior to each use. 25 Figure 19 Double cranes along vessel

The inspection has to be completed during each shift change and frequent intervals during the operation. 26 Figure 20 Hoist suspended awaiting to be placed in the yard

Defective hoisting gear must be immediately reported to the supervisor and removed from service until repaired or replaced. 27 Figure 21 Close up view of chain and shackles

Verify the safe working load of the gear for operations that will take place during the shift. 28 Figure 22 Safe working load stenciled on spreader bar

29 Types of Equipment

Crawler cranes 30 Figure 23 Crane

Crane shear 31 Figure 24 Shear on bank

Crane magnet 32 Figure 25 Magnet crane moving steel plates

Skid loader 33 Figure 26 Skid loader moving materials on deck

Skid loader with hydraulic hammer 34 Figure 27 Skid loader with concrete hammer

Wheeled forklift 35 Figure 28 Forklift moving steel pieces

Crane with clam bucket 36 Figure 29 Crane stacking processed steel

37 Hoisting Series

38  The following photos are various materials that are being hoisted from the vessel to shore.  Discuss the operations and view points of the evolution.  The angle shown is generally what you do not observe.

39 Series # 1 Crane Along channel of a Navy Vessel

40 Figure 30 Double cranes along channel series #1

41 Figure 31 Double Cranes along channel series #1

42 Figure 32 Double Cranes along channel series #1

43 Figure 33 Double Cranes along channel series #1

44 Figure 34 Double Cranes along channel series #1

45 Figure 35 Double Cranes along channel series #1

46 Series # 2 View from Vessel to Yard

47 Figure 36 Side sectional from vessel to yard series #2

48 Figure 37 Side sectional from vessel to yard series #2

49 Figure 38 Side sectional from vessel to yard series #2

50 Figure 39 Side sectional from vessel to yard series #2

51 Figure 40 Side sectional from vessel to yard series #2

52 Figure 41 Side sectional from vessel to yard series #2

53 Emergency Situations

Overloading the crane and equipment is one of the most hazardous conditions. 54 Figure 42 External derrick barge moved into place to hoist

The crane and or rigging can fail resulting in the load dropping and causing crane instability. 55 Figure 43 Crane rigging inside cargo hold ready for hoist

Tipping results when the boom is extended beyond the limits and/or load weight exceeds equipment limitations. 56 Figure 44 Crane hoisting sectional to yard

A crane tipping over can result in injury to the operator and loss of equipment. 57 Figure 45 Crane swing section to yard

The supervisor should be fully alert for any conditions that would lead to tipping or overloading. 58 Figure 46 Supervisor monitoring hoist as it clears the vessel

Gear failure happens when the load exceeds the safe limits or inspection failed to find defects. 59 Figure 47 Supervisor giving crane signals to crane operator

During the initial hoist the material can snag or catch resulting in overloading or straining of the gear. 60 Figure 48 Personnel clearing area as section being hoisted

Once the hoist separates from the snag it can cause a snap back of the gear causing it to swing wildly or upward rapidly. 61 Figure 48 Front view of bridle on tension

Long reaches can have dramatic results in equipment and gear performance. 62 Figure 49 Crane making pull from right side of vessel

The longer the reach the less weight that can be hoisted. 63 Figure 50 Crane boom angle

64

65

References 66  OSHA eTool

67 Worker safety is a priority