05.08.2010 TEAM GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) RICO Ledy (ME) Eric Geerlings (CE)

Slides:



Advertisements
Similar presentations
Outdoor Reset Options Basic Heating Control –Modulating mixing valve control –Supply temperature high limit –Seasonal pump activation –Boiler activation.
Advertisements

Team 4 Senior Design Final Presentation May 7, 2011.
TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)
Geothermal Rocks! The U.S. Fish and Wildlife Service Experience.
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
Roth Industries Snowmelt Basics. Program Outline I. Introduction II. Applications III. Benefits IV. Classifications V. System Design VI. Installation.
Taken from presentation by: Neal Babcock & Howard Alderson, P.E. Alderson Engineering, Inc. February 26, 2008.
Geothermal Heat Pump Case Study I Chiloquin Community Center: 16 vertical boreholes + water-water heat pump providing radiant floor heating and cooling.
Candor Construction Group & Alternative Energy Associates Presents Geothermal Heating & Cooling
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Team 2: Kelly Foster Chad Mills Lirjon Llusho Dave Rosso September 30, 2009.
Energy Autonomous Development Presented by Next Generation Solutions.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Geothermal Exchange Heat Pumps Jordan Harris 4M-C.
Heat Pump TEAM A: CAROLINE NAKANWAGI SUNGHEE MIN THERMODYNAMIC 2014 FALL.
District Energy Corporation Sustainable Project SW 40 th Thermal Energy Facility To Serve the New Lancaster County Adult Detention Facility April 2011.
Lecture 30 Heat Pump Systems.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
GEOTHERMAL HEAT PUMPS THE “PLAYBOOK” Jack DiEnna Executive Director The Geothermal National & International Initiative (GEO-NII)
Cyclohexane Production Unit
 a machine that moves heat from a location to another location, using mechanical work.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Fitting GeoExchange Heating and Cooling to Your Building Denis Tanguay President & CEO Canadian GeoExchange Coalition High-Rise Power: Is renewable energy.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
GSHP Pumping Impacts Open Loops vs Closed Loops. GSHP Pumping analysis Used SEEM to generate loads and hours of operation Five climates run but COP and.
TEAM GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) RICO Ledy (ME) Eric Geerlings (CE)
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Loop Field Sizing. Ground Source “Misconceptions” Grout isn’t important It works everywhere!!! XXX ft per ton is adequate everywhere!!! The loops must.
Geothermal Heat Pump Systems Advantages of Geothermal
Heat Pumps Fraser Gibson. Objective To convey a basic understanding of different types of heat pumps Discuss advantages/disadvantages of heat pumps.
Types of Heat Pumps Bryan Vandenberg OBJECTIVE: present the common heat pump types and illustrate their applications.
Engineering, Sustainability, and the Geosciences Course-level Examples of Geoscience in “Mechanical” Engineering Kevin Amende, P.E. March 7 th, 2013.
HEAT PUMPS BY: DINESH BAKTHAVATSALAM ID#: M-I.
TEAM 13—GEOMELT. The Team Jacob Speelman (ME) Caleb Rottman (EE) Eric Ledy (ME) Eric Geerlings (CE)
Presentation Outline Project Background Project Overview Industry Research: AIA 2030 Challenge and It’s Significance in Renovations Breadth #1: Redesign.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Mechanical EmphasisTimothy R. Nolan Baltimore, Maryland April 17, 2003 Consultant – Mr. Freihaut.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Geothermal Heating and Cooling Applications Rachel Kerekgyarto.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Geothermal HVAC: An Introduction Daniel Bernstein President Gaia Geothermal, LLC.
Uponor for Radiant Cooling Systems 102. Outline Fundamentals review FEA Analysis Case Studies Piping CCN Controls Web Link to Uponor DC Specifications.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Combined Heat & Power Cycle Fueled By Digester Gas Eric DeMillard Nathan Johnson Wade Daniels Jarrod McCarrel.
GeoExchange / Thermal Energy Storage Systems Reduce Overall Energy Use and Peak Demand.
Announcements Final Project Submission Tuesday, May 12th (anytime)
Grunenwald Science and Technology Building
Experimental study of shaft resistance of energy pile
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Renewable Energy Systems
Lecture 30 Heat Pump Systems.
Friday 8 am St. Edward's University
The Refrigeration and heat pump Cycle utilized with Geothermal
Heat Pumps Reference: BSRIA BG7 / 2009.
Presentation transcript:

TEAM GEOMELT

The Team Jacob Speelman (ME) Caleb Rottman (EE) RICO Ledy (ME) Eric Geerlings (CE)

Outline Project Overview Major Design Decisions Design Snowmelt Geothermal Site Development Model Conclusions Questions

Project Overview Problems with the Burton St. Entrance to Calvin Why not use Geothermal energy? OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Overview - Goals Primary Goal: Design a geothermal snowmelt system at Calvin’s Burton Street Entrance Secondary Goal: Design a small scale model OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Overview - Design Norms Stewardship Save on energy and reduce fossil fuel use Caring Increase safety for pedestrians and vehicles Transparency Honest recommendation OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Major Design Decisions Snowmelt What surfaces to melt Is a heat pump required? Geothermal Horizontal vs. Vertical Site Design Pumphouse location Piping and manifold layout Model Component selection OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Snowmelt Design - Overview 4,000 ft 2 to melt at 150 BTU/hr- ft 2 60 tons – About 20 times that of a house Manifolds are used to distribute heat to the snowmelt area OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Snowmelt Design – Pipe Layout 1” PEX pipe 500’ length loops 9” on center pipe spacing 3” from concrete surface OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Condenser Evaporator From Geothermal Loops To Snowmelt Loops Q Q Compressor

Snowmelt Design – Heat Pump Entering temperature of 105 °F Exiting temperature of 90 °F OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Geothermal Design First Major Step in the Geothermal Design: Pipe layout: Horizontal or Vertical Advantage/Disadvantage Analysis Design Choice: Vertical Loop Cooling ground over time? OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Geothermal Design Calculated the total bore length required: 9375 ft Limit Bore Depth to 390 ft Pipe diameter – 1 ¼” OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Geothermal Design 24 Well Locations Adequate spacing 2” HDPE pipe to pump house 3 rectangular manifolds Design avoids tree removal! Pumphouse hidden from view OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Site Design - Pumphouse OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions Plan View Isometric View

Model Design Concrete with installed piping and moisture sensor Insulation Sand Sub-base Soil with installed vertical geothermal loop OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Model Control System OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Conclusions - Cost Analysis Payback Period: 55 years Our recommendation: Don’t do it! Geothermal SystemNatural Gas System Initial Cost$420,000$180,000 Operating Cost $6,600 $10,900 OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Conclusions Why is this not economically feasible? We had three false assumptions: Snow can be melted with ground temperature water The entrance being isolated is a problem for traditional snowmelt systems The ground can be an unending heat source OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

Acknowledgements Trent DeBoer, GMB Engineering Steve Schultz, GMB Engineering Scott Post, Prein&Newhof Charles Huizinga, Calvin College Physical Plant Marc Huizinga, Calvin College Physical Plant Professor Nielsen, Team Advisor Ren Tubergen, Gumbo Product Development, Inc. Gary Slykhouse, City of GR Engineering Dept. Bob Bruggink, Moore & Bruggink, Inc. OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions

OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions