DC Field Facilities 2013 and beyond Scott Hannahs NHMFL External Advisory Committee August 2010.

Slides:



Advertisements
Similar presentations
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Advertisements

Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
G2P Target installation and Beyond. Schedule Pivot before.
ICEoxford Limited. Development of ICE Beam line equipment Copyright © 2011 ICEoxford Ltd Starting Point A simple Continuous Flow (CF) system.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Status & Highlights of the NMR & MRI Program New Avance III Console for 900 MHz - upgraded console for WB600 #2 with old 900 MHz console New WB500 to be.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
Status and Highlights of the DC Field User Program as of summer 2010, mid-point in current award period Graphene – in distinct PIs, 9 of them.
DC Magnet User Program Eric Palm Director, DC User Program Scott Hannahs Director, DC Field Facilities and Instrumentation Magnets Instrumentation People.
NHMFL User Committee Meeting NMR/MRI Subgroup October 2 nd 2009 Update from The Advanced Magnetic Resonance Imaging & Spectroscopy Program at the University.
Neutrino Factory Workshop UK Magnet Manufacturing Capability Elwyn Baynham CCLRC Rutherford Appleton Laboratory, UK Elwyn Baynham UKNF Oct 2003.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Magnet Options for Magnetic Intervention SC Wire Characteristics (Critical Current Density: Jc) With the advent of cusp geometry for diverting ions into.
Generator magnet program: The future. 85T Multi-Shot and 60T Long Pulse magnets are state of the art world record magnets with an established user program.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
K. McDonald ICEC23-ICMC2010, Wroclaw July 20, Use of He Gas Cooled by Liquid Hydrogen with a 15-T Pulsed Copper Solenoid Magnet K.T. McDonald Princeton.
Status and Highlights of the Pulsed Magnet Program as of summer 2010, mid-point in current award period Delivered 350 th science pulse > 70T in 75T magnets.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
HD target.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
1 IL 3 He Relaxation Jacob Yoder UIUC Feb
Status and Highlights of the CICC Magnet Program (I. Dixon) as of summer 2010, mid-point in current award period All wire for MagLab and HZB magnets completed.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Facility Status and Highlights of the AMRIS MRI/S Program as of summer 2010, mid-point in current award period NHMFL development cores in HTS NMR probes,
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
Fermilab 02/01/07NFMCC on MCTF Magnets1 Magnet R&D… through the MCTF Michael Lamm.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
32 T All-Superconducting Magnet W. Denis Markiewicz User Committee Meeting National High Magnetic Field Laboratory October 1-3, 2009.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
Dilution Refrigerators with Superconducting Magnets
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
2016 Chiller New Products Presentation.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
Specifications for the Integrated Tests II Paul Huffman.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Summary of Session: Magnets and undulators for light sources 2
Cryogen Free Desktop Vibrating Sample Magnetometer (VSM) to 5 Tesla
Renuka Rajput Ghoshal John Hogan Ruben J. Fair Probir K. Ghoshal
EPFL-SPC, 5232 Villigen PSI, Switzerland
CERN Data Centre ‘Building 513 on the Meyrin Site’
The hybrid magnet and its superconducting outsert
Mike Sumption, M. Majoros, C. Myers, and E.W. Collings
RESISTIVE MAGNETS Maintenance, Upgrades
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
Accelerator Module Test Facility
Mathew C. Wright October 2016
Design and Optimization of Force-Reduced Superconducting Magnets
High Magnetic Field Lab, CAS
Maintenance at ALBA facility: Strategy for the conventional services
Thermal diffusivity measurement on Nb by
Thermohydraulic behaviour of the cryogenic system
News from the FNAL test facility
Optical fiber based sensors for low temperature and superconductors
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

DC Field Facilities 2013 and beyond Scott Hannahs NHMFL External Advisory Committee August 2010

Milli-Kelvin 18/20 T SC 50 mm 20 mK 16/18 T SC 50 mm 10 mK 18/20 T SC 50 mm 300K-.3K Cell 4 20T 195 mm 20kA Test 20 MW Cell 6 25 T (700 GHz) 50 mm 12 ppm 18.6 MW Cell 8 35 T 32 mm 19 MW Cell 10 Cryogenic System Storage Cell T 32 mm 19 MW Keck Cell 16 LCTF Cell T Hybrid 32 mm 31 MW Cell 13 Magnet & Power Supply Testing Cell 9 31 T 50 mm 18 MW Cell 3 18 T SC w/ Fast Optics Cell 1 Optics Support DC Magnets Cell 5 Split Coil > 25 T 32 mm 28MW Cell 14 SCH / 36 T 40 mm 1 ppm 14 MW 40T “High Field” insert 32 mm 40+T 32 mm 28 MW 40+T 32 mm 28 MW 36+T 50 mm 28 MW 36+T 50 mm 28 MW 60T Hybrid 32 mm ?? MW 30T SC 50 mm 10 mK 30T SC 50 mm 300K-.3K Cell 2 29 T 32 mm 50 ppm 18.3 MW Cell 7 31 T 50 mm Gradient & Modulation 18 MW Cell 11 Cryo Operators Outsert Repair Upgrade 2PS Green identifies current status (2010) Yellow identifies status at end of current grant (2012) Red identifies future possibilities Light Blue identifies cells that may be available NHMFL External Advisory Committee August 2010

Field and NHMFL NHMFL External Advisory Committee August 2010

DC Powered Magnets Worldwide GrenobleTallahasseeNijmegenTsukubaSendai Power 1 (MW) cm high-field (T) cm high-field (T) Large-Bore 19 tesla, 16 cm 20 tesla, 20 cm 3-cm Hybrid (T) cm Hybrid (T) ppm Hybrid (T) cm, 10-ppm (T) 25 3-cm, 50-ppm (T) 28 Split 18T, 4 x 4 mm 25+ tesla 4 x (45° x 11.4°) 1 Power available for resistive magnets listed 2 Magnet presently in development Highest Worldwide NHMFL External Advisory Committee August 2010

Field vs Outer Diameter and Power for 32 mm bore resistive magnets NHMFL External Advisory Committee August 2010

Operations Building Alongside OPMD Even Cells 3 Floors ~13000 SqFt Frees Up Cells 10 and 11 Pits for mK magnets, low vibration area for low temperature STM NHMFL External Advisory Committee August 2010

Vision for the DC Field User Program as of summer 2010, mid-point in current award period All “workhorse” resistive magnets upgraded to 28 MW {2.8M$ first, 6.4M$ for 4} T (32 mm bore) 36-38T (50 mm bore) Series Connected Hybrid (14 MW) – 36T high homogeneity insert {11.7 M$} 40T high field insert for Series Connected Hybrid {1 M$} Power supply active filter upgrade 28→32MW to replace unobtainable components and reduce ripple, Magnet Cooling pump & heat exchanger for 28/32 MW operation {2.3 M$} Plant infrastructure upgrade/replacements, Chillers (due freon) {$5M} Superconducting magnet operational at 32T with 10 mK dilution refrigerator, other SC magnets being made or purchased. {5 M$ ?} Hybrid magnet outsert being upgraded to 15 T giving 48 T total field {2 M$ ?}, 2 Power Supply Operation Proposal for 60 T hybrid being developed {100 M$} New “standard” instrumentation heat capacity, dilatometry, scanning probe microscopy {1 person / technique} Standard instrumentation on “PPMS like” pucks allowing remote operation and measurements, these could be run in a 3 rd shift. {1 technician + 1 control room operator} New “Operations Building” adjacent to OPMD with low vibration area for low temp STM and magnet, pits for mK magnets, equipment and cryo storage, lab space, offices, cryo operators, and bathroom {$6M ??}