0 The Economics of Next Generation Access Results of a study for ECTA Dieter Elixmann Dragan Ilic Karl-Heinz Neumann Thomas Plückebaum Brussels, June 25,

Slides:



Advertisements
Similar presentations
SADC Forum on Analogue to Digital Migration Workshop Present Emerging and Future Broadband Technologies and potential uses 27 – 31 August, Mozambique 2012.
Advertisements

Review of Type II Interconnection Policy Press Conference 6 July 2004.
1 FITCE 2008 London September 23th, 2008 Next Generation Access Networks: Perspectives and regulatory options.
Matjaž Pogačnik, MBA ENGAGE Donegal workshop Letterkenny, February 12 th 2013.
1 Price squeeze tests in electronic communications: ARCEPs experience Competition Law and Electronic Communications Brussels, June 19, 2008.
th ACCC Regulatory Conference Next Generation Networks in Australia and NZ - Alternate paths to the same outcomes?
The role of wireline access technologies to bridge the digital divide BB for All Cluster workshop “How to bridge the digital divide ?”
LLU and Broadband Regulation in France July 2005 Autorité de Régulation des Communications Electroniques et des Postes.
Christian Berg Fibre deployment by utility companies in Denmark EU Digital Agenda Assembly event Workshop 5: Facilitating wide-scale broadband.
CANTO 29th Annual Conference 14th-17th July – Aruba COMSOF NV – Niels Gabriels Opportunities from a combined FTTx rollout covering residential customers,
©Ofcom A regulatory perspective on FTTx deployments Chinyelu Onwurah, Head of Telecoms Technology, Ofcom 19 th June 2007 FTTx Summit.
Ireland’s Broadband Performance and Policy Actions January 2010.
National Technical University of Athens School of Electrical & Computer Engineering Government’s Intervention in NGA: The Challenges for an Information.
0 0 Electronic Communications regulation in France Idate Montpellier-November 22th 2005 Gabrielle Gauthey-ARCEP France 8 M (Q2 2005) USA 37.9 M (fin 2004)
Thank you.
INTUG RMIT, Broadband 3 March The rise of broadband communications Ewan Sutherland Executive Director
TRIBAN Workshop Tomorrow’s Residential Infrastructure for Broadband And Narrowband Techno-Economic Evaluation of Broadband Radio Access Solutions Valter.
Regulatory issues raised by access upgrade investment: where we are in the UK debate Richard Budd Senior Regulatory, Economist, BT 16 September 2008
Importance and development of broadband access in Lithuania Paulius Vaina Communications Regulatory Authority of the Republic of Lithuania ITU Regional.
1 Access regulation and incentives for investment in alternative broadband infrastructure* Harald Gruber Presentation for REGULATION AND COMPETITION SEMINAR.
ITS Regional Conference in Rome, September 2008 Martin Lundborg SBR Juconomy Consulting AG Lessons learned from the regulation of LLU for the future regulation.
Evolving broadband market & policy developments in Japan April 27, 2006 Taka Ebihara Japan Chair Center for Strategic & International Studies EDUCAUSE.
Development of BB markets Access markets (M4 & M5) and remedies applied Linda Paršova 10 TH BALTIC ELECTRONIC COMMUNICATIONS AND POSTAL SERVICES REGULATORS’
Geneva, Switzerland, 22 September 2012 FTTx in China – Current Status and Future Prospects Chengbin Shen, R&D Director, Shanghai Research Insitute of China.
Next Generation Access: A Global / Policy Perspective Maury D. Shenk 27 June 2007.
Fibre Investments for Greece’s Recovery Christos J. Bouras Professor University of Patras & Research Academic Computer Technology Institute
CoE/ARB Workshop On “Infrastructure Sharing and LLU” Session 9: Infrastructure Sharing Potentials in Developing Countries By: Isabelle Gross Khartoum –
UK Broadband Regulatory Framework David Clarkson 16 th November 2011 NextGen 11 Conference, Bristol, November.
Cost sharing models of NGN rollout in rural or remote areas BEREC-EaPeReg-REGULATEL-EMERG Summit Barcelona, 2-3 July 2015.
Broadband Development in the Republic of Moldova July 2015, Spain, Barcelona BEREC-EMERG-REGULATEL-EaPeReg Joint Summit CRISTINA LUCHITA Chief of.
G.Pūras Development of Broadband markets Communications Regulatory authority of Lithuania Electronic communications department Disclaimer: The.
Investment in next generation networks A competitive approach to stimulating Europe’s broadband future - CEPS 22 February 2007.
Broadband Internet Current and future challenges for regulators: a selection Athens – June 1, 2007 Philippe Defraigne Cullen International
E. Demierre and P. Schroeter 1 TRIBAN WORKSHOP TRIBAN Workshop Bern, November 1998 P614 TASK 5 FTTH What future for FTTH?
Accessing Fixed Networks and Facilities to Speed Up Broadband Rollout Presented by Andrew Gorton CANTO 29th Annual Conference & Trade Exhibition 14 th.
Next Generation Access Ivan Boyd BT Research and Venturing.
1 The Ladder of Investment in Spain NEREC, FEDEA Madrid, March 17, 2009 Ángel L. López SP-SP Research Center, IESE Business School.
Property of TERA Consultants CONSULTANTS T E R A IDATE– Workshop Lessons from Tunis (22 November 2005) TERA Consultants 32 rue des Jeûneurs PARIS.
9 March 2001 Page 1 Broadband in Australia Vicki MacLeod Manager Public Policy and International Regulatory Legal & Regulatory
Pro-competitive EU Framework delivered a success story: affordability, higher speeds, more investment 2.
1 Investment incentives in an environment of dwindling voice revenues* Harald Gruber Presentation for Conference “The Future of Voice” Geneva January.
Broadband for All through Universal Service? 17 June 2010, Lisbon.
Exchange & Cabinet Tour 19 th November Traditional fixed telephony is based around a central office or exchange that serves customers with an.
Local Loop Unbundling PRESENTATION TO THE PORTFOLIO COMMITTEE 6 th JUNE 2007.
Wireless Telecommunications Bureau Wireless Telecommunications Overview January 2009.
Innovation in Infrastructure Access to Extend Coverage.
ACN Product Overview Broadband Australia Information correct as at October 1, 2015.
Mehmet İLERİ ICT Expert Information and Communications Technologies Authority Turkish Broadband Market & Physical Infrastructure Access Market.
Ross Kelso Doctoral candidate, QUT 26 September 2006 Access to Next Generation Broadband 2006 Communications.
1 TINF 2010 Tuesday 30 November 2010 Present and Future Regulation of Electronic Communications Vesa Terävä European Commission Information Society & Media.
21 June 2011 NGA Network Principles & Planning Tom Fulford-Brown, Business Development Manager, Geo.
NGA roll-out Infrastructure competition in convergent markets (Case of Spain) TAIEX - Kiev Fabio del Alisal Director for International Affairs.
ACN Product Overview Broadband Australia Information correct as at 17 February 2016.
Inês Nolasco Senior Regulatory Affairs Manager European Competitive Telecommunications Association.
Super-fast Fibre Access Angharad Davies, Policy and Public Affairs, Openreach Openreach makes every effort to ensure the information in this presentation.
11 th Report on European Electronic Communications Regulation and Markets 2005 Viviane Reding – Commissioner DG Information Society and Media 20 February.
Mec1224 EETT: From Telecommunications to Electronic Communications Athens, 28 March 2005 “Investment and competition in electronic communications services.
© GSM Association 2009 UNIVERSAL ACCESS: MOBILE VOICE, DATA, BROADBAND FOR ALL Robindhra Mangtani, Senior Director, Government & Regulatory Affairs, GSMA.
FTTH: the European update Introduction
SYNERGIES IN ROLL-out of networks by Energy UTILITIES and telecoms 26 June 2014, Brussels Joachim Hoenig, Director, Brussels Representatives Office Group.
Broadband Workshop Facilitating Broadband Investment French regulatory framework Bertrand Vandeputte ARCEP European Commission – DG INFSO March 23rd, 2011.
1 Robert MarchantJanuary 2011 Where could we be in 5 to 10 years time Where are we today in the provision of Broadband Services What is Government Policy.
Developments and the regulatory environment in the electronic communications market Rivo Mets.
UCLL Sub Loop Co-Location Economic Life of a Cabinet.
Virtual Unbundling A new wholesale product in NGA networks
International Telecommunication Union 1 The views expressed in this paper are those of the author and do not necessarily reflect the opinions of the ITU.
ACN Product Overview Broadband Australia
Regulation of NGA networks – the EU experience
Practical considerations of USO cost modelling
Very High Capacity and 5G Networks: from the EU code to the EU market
Presentation transcript:

0 The Economics of Next Generation Access Results of a study for ECTA Dieter Elixmann Dragan Ilic Karl-Heinz Neumann Thomas Plückebaum Brussels, June 25, 2008

1 1.Scope of the Study 2.Some recent global developments 3.Modelling approach 4.Some major model results -Germany -France -Sweden 4.Regulatory policy conclusions and recommendations

2 1. Scope of the study (1)Review of recent studies on NGA done for regulators, Governments and the OECD (2)Review of global experience on NGA roll-out, replicability and regulatory approaches (USA, Japan, Singapore, Australia) (3)Modelling approach for VDSL and FTTH NGA roll-out -6 countries (D, F, I, ES, P, SE) -Area of profitable roll-out -FTTC, FTTH-PON, FTTH-P2P architectures considered -Degree of replicability of first mover (incumbent) NGA roll-out -Impact of potential regulatory measures on replicability (4)Regulatory policy conclusions and recommendations

3 2. Some recent global developments Australia (1) Envisaged nationwide Fibre to the Node (FTTN) network (1) -In April 2008 the Australian Federal Government released a Request for Proposals for the roll out of a nationwide FTTN network, which will: Deliver minimum downlink speeds of 12 Mbps to 98% of Australian homes Using Fibre to the Node (FTTN) or Fibre to Premises (FTTP) technology Support high quality voice, data and video services including symmetric applications such as high definition video conferencing Facilitate competition in the telecomunications sector through open access arangements that allow all service providers access to the network on equal terms Enable uniform and affordable retail prices to customers, no matter where they live.

4 2. Some recent global developments Australia (2) Envisaged nationwide Fibre to the Node (FTTN) network (2) -The Australian Government has committed to spend up to 4.7 billion AUD to enable the roll-out -The party to build the nationwide Fibre to the Node network will be selected through a „competitive assessment process“ -Only bidding parties so far: Telstra Terria Consortium (formerly G9) Macquarie -The Government aims to announce the successful bidder in late 2008.

5 2. Some recent global developments Singapore Up to ~350mil. € gov. grant Up to ~117mil. € gov. grant Tender closed in May 2008 Tender closes in August 2008 Source: IDA Singapore NGN plan includes 2 RFPs for double separation

6 2. Some recent global developments Japan (1) Broadband penetration in Japan according to different technologies Source: Katagiri (2008)

7 2. Some recent global developments Japan (2) Source: Glocom (2006) Access Charges for FTTH Devices in Japan (E = NTT East; W = NTT West; figures in Yen)

8 3. Modelling Approach (1) Generic bottom-up cost modelling approach Long-term consideration, but no time dimension Advanced broadband market assumption FTTC (VDSL), and FTTH (PON and P2P) NGA-technology considered Modelling of access, reasonable assumptions for concentration and backbone network Consideration of business and residential users Calculation of critical market share for profitability (< 100 %) and replicability (< 50%)

9 3. Modelling Approach (2) Services modelled: -Telephony -Telephony and Broadband Internet Access -Telephony + Internet Access + TV Modelling and results for 8 clusters or geotypes

10 3. Modelling Approach Geotypes of the model GeotypeClusterSubscriber density per km 2 Urban (1)Dense Urban> (2)Urban> (3)Less Urban> Suburban (4)Dense Urban> (5)Suburban> (6)Less Suburban> 500 Rural (7)Dense Rural> 100 (8)Rural  100

11 3. Modelling Approach We consider three access network technologies VDSL FTTH PON FTTH P2P MDF SC MCL Metro Core Location Ethernet Switch, ODF Fibre Cu DSLAM MDF SC MCL Metro Core Location Ethernet Switch, OLT, ODF Fibre Splitter, OSDF opt. Fibre 1:64 MDF MCL Metro Core Location Ethernet Switch, ODF Fibre Handhole/ Sleeve Fibre 1:1 Traffic concentration now on a higher level than MDF Active Electronic Equipment ONU Splitter opt. Drop Feeder Backhaul

12 3. Modelling Approach Network elements modelled

13 3. Modelling Approach Access opportunities Regulatory means which can be modelled FTTC/vDSL scenario -Sharing of street cabinets -Use of existing empty ducts or dark fibre for backhaul FTTH PON scenario -Fibre SLU (sub loop unbundling) -Sharing of ODF (concentration point equivalent to street cabinet) -Duct access or dark fibre for backhaul or full loop FTTH P2P scenario -Fibre LLU at the Metro core location -Duct access or dark fibre Means of construction -Use and sharing of aerial cable -Common construction of trenches/ ducts

14 3. Modelling Approach NGA market and regulatory scenarios Remarks (1) Stand Alone operator as first mover VDSL PON P2P (2)Incumbent as first mover VDSL Investment savings due to dismantling of MDFs, better use of infrastructure PON P2P (3)2nd mover VDSL 80% duct access 10% less revenues than in (1) and (2) In 20% cases no co-location at SC 20% duct access 80% dark fibre access 20% dark fibre access 80% dark fibre/duct access 20% dark fibre/duct access (4)2nd mover PON 80% duct access no SLU 10% less revenues than in (1) and (2) 20% duct access no SLU 80% dark fibre access SLU 20% dark fibre access SLU 80% dark fibre/duct access SLU 20% dark fibre/duct access SLU (5)2nd mover P2P 80% duct access no SLU 10% less revenues than in (1) and (2) 20% duct access no SLU LLU

15 4. Some major model results Broadband technologies market share (Jan. 2008) DSLCableOther Retail market share incumbent Broadband penetration per HH 1) Mobile only users 2) Germany94%5%1%46%52%7% France95%5%-47%62%17% Italy97%0%3%64%46%17% Portugal64%35%1%67%47%33% Spain79%20%1%56%58%16% Sweden62%19%18%38%64%5% EU2779,9%15,3%4,8% 1) January ) Related to 2004 Source: EU 13th Implementation Report, WIK, Ipsos

16 4. Some major model results Subscriber distribution of potential customer base Cluster type GermanyFranceSweden in Mio. in % Cumulative in Mio. in % Cumulative in Mio. in % Cumulative (1)Dense Urban0,120,2 0,892,6 (2)Urban0,92,12,41,44,26,8 (3)Less Urban4,911,313,74,011,818,60,4388 (4)Dense Suburban2,04,818,42,26,625,20,5510,318,4 (5)Suburban2,856,625,13,29,534,70,7313,732,1 (6)Less Suburban5,2512,337,43,39,644,31,3525,557,5 (7)Dense Rural14,634,171,56,218,262,60,468,766,3 (8)Rural12,228,510012,737,41001,833,7100  42, ,91005,3100

17 4. Some major model results Main results: Sweden NGA (VDSL and FTTH) is only profitable in urban areas which account for 8% of potential customers Replicability is only possible for VDSL but not for FTTH Results seem to be in line with actual market developments

18 4. Some major model results Main results: Sweden FTTH/PON Customer base Critical market share 8% 18,4%

19 4. Some major model results Main results: Sweden FTTH/PON Urban ARPU Total cost per subscriber and month Urban Average revenue per subscriber and month in € Market share

20 4. Some major model results Results for Germany: Incumbent: VDSL Profitability up to (theoretically) 71,5% and realistically 37,4% of population Profitability requires 78% of market share, or 34% in the realistic case 0,2% 2,4% 13,7% 18,4% 25,1% 37,4% 71,5% Customer base Critical market share

21 4. Some major model results Results for Germany: Incumbent: PON Profitability: 25,1% of population (theoretically) and 18,4% realistically (up to dense suburban) High market shares needed: 77%, 63% respectively Customer base Critical market share 0,2% 2,4% 13,7% 18,4% 37,4% 25,1%

22 4. Some major model results Results for Germany: Incumbent: P2P Profitability: 25,1% of population (theoretically) and 13,7% realistically High market shares needed: 93%, 68% respectively Customer base 0,2% 2,4% 13,7% 18,4% 25,1% Critical market share

23 4. Some major model results Results for Germany: 2nd mover: VDSL Without regulated access: replicability only for 13,7% of population (at the best) Even in the regulatory best case (80% duct access possible) replicability up to 18,4% of population Critical market share for profitability: 37% compared to 20% of incumbent Under less favourable regulatory conditions (20% duct access) replicability goes down to 13,7% of population

24 4. Some major model results Results for Germany: 2nd mover: VDSL 80% duct access Critical market share Customer base 0,2% 2,4% 13,7%25,1% 18,4% 37,4%

25 4. Some major model results Results for Germany: 2nd mover: VDSL 80% duct access ARPU (dense suburban)

26 4. Some major model results Results for Germany: 2nd mover: PON Nearly no replicability at all under stand-alone conditions (only for 0,2% of population) Even under 80% duct access replicability increases only slightly to 2,1% of population Under SLU fibre access, replicability wherever the first mover (e.g. incumbent) rolls out PON

27 4. Some major model results Results for Germany: 2nd mover: PON 80% duct access Critical market share Customer base 0,2% 2,4% 13,7% 18,4%25,1%

28 4. Some major model results Results for Germany: 2nd mover: PON 80% duct access (urban) ARPU

29 4. Some major model results Results for Germany: 2nd mover: P2P Nearly no replicability at all under stand-alone conditions (only for 0,2% of population) At 80% duct access replicability only for 0,2% of population Under fibre LLU access, replicability wherever the first mover (e.g. incumbent) rolls out P2P for at least as many operators as under copper LLU

30 4. Some major model results Results for France: FTTH PON and P2P FTTH roll-out are only profitable for the densest urban regions Only a significant increase in retail revenues and/or reduction of infrastructure costs can expand the scope of profitable roll-out Without regulatory measures replicability in the areas profitable for a first mover (e.g. the incumbent) is extremely limited Duct access is not sufficient to generate replicability results which are viable for competition Only fibre SLU (in the case of PON) and fibre LLU (in the case of P2P) generate sufficient replicability for entrant business cases In case of fibre SLU and LLU two or more alternative operators can roll-out their network wherever the first mover (likely the incumbent) rolls out fibre

WIK-Consult GmbH Postfach Bad Honnef Deutschland Tel +49 (0) Fax +49 (0) www. wik-consult.com